Home › Texas › Mitchell County
Mitchell County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
15 proposed energy projects from ERCOT's September 2026 report, plus who to call in Mitchell County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.
Check land in Mitchell CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Mitchell County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Mitchell County?
ERCOT's September 2026 interconnection report lists 15 proposed energy projects in Mitchell County (4 solar, 2 wind and 9 battery storage), about 6,791 MW in all. 1 of the 15 has a signed interconnection agreement.
What stands out in Mitchell County
By capacity, battery storage leads in Mitchell County with 3,824 MW across 9 projects, followed by solar (4 projects, 1,678 MW) and wind (2 projects, 1,290 MW). The largest single project is Zeus Mitchell BESS, a 1,043 MW battery storage paired with solar project listed under Mitchell BESS, still in study, and its target online date is Apr 2029. Of the 15, 14 are still in ERCOT's study process and 1 has posted security or started construction. Connection points are mostly at 345 kV (8 projects) and 138 kV (5 projects) (why the voltage matters). The single most-used connection point is Tap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02, shared by 3 projects. Rosenix Solar, LLC is listed on the most projects here (2 of 15); 14 different companies appear in all. Target online dates for the projects not yet running span May 2027 to Apr 2030. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Hackberry Creek Solartap 345kV 10053 Cattleman Switch - 1058 Longshore Switch | Hackberry Creek Solar LLC | Solar | 175.5 | Jan 2028 | Signed; security posted |
| Zeus Mitchell BESS IITap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02 · shared with 2 other requests | Zeus Mitchell BESS II, LLC | Battery storage (paired with solar) | 1,042.9 | May 2027 | In study |
| Sepik BESStap 138kV 11342 Loraine South – 10050 Ranger Camp | BRP Sepik BESS LLC | Battery storage (stand-alone) | 205.0 | Mar 2028 | In study |
| Zeus Spade BESSTap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek · shared with 1 other request | Spade BESS | Battery storage (paired with wind) | 446.3 | Mar 2028 | In study |
| Zeus Spade WindTap 345 kV 1030 Morgan Creek to 76030 Gasconades Creek · shared with 1 other request | Spade Wind, LLC | Wind | 987.3 | Mar 2028 | In study |
| Johnson Grass SolarTap 138kV (#11395) Navigation - (#10054) Cattlemen | Johnson Grass Solar ,LLC | Solar | 195.8 | Apr 2028 | In study |
| Dolce BESSTap 138kV 1189 BARBER_LK1_8 - 19520 CHINAGRVX2_8 | Dolce BESS, LLC | Battery storage (stand-alone) | 100.7 | Jan 2029 | In study |
| Prairie Power WindTap 345 kV Longshore Switch (Bus# 1058) to Cattleman Switch (Bus# 1... | Prairie Power Wind, LLC | Wind | 302.9 | Apr 2029 | In study |
| Sunflower Valley Storage1414 Champion Creek Substation 345 kV | Sunflower Valley Storage, LLC | Battery storage (stand-alone) | 205.7 | Apr 2029 | In study |
| Zeus Mitchell BESSTap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02 · shared with 2 other requests | Mitchell BESS | Battery storage (paired with solar) | 1,042.9 | Apr 2029 | In study |
| Zeus Mitchell SolarTap 345 kV 10049 Ranger Camp - 10057 Prong Moss CKT #01 and #02 · shared with 2 other requests | Mitchell Solar, LLC | Solar | 804.7 | Apr 2029 | In study |
| Whitetail BESStap Salt Mine (#23846) to Bulldog (#23833) 138kV | Hunt Energy Network, LLC | Battery storage (stand-alone) | 180.0 | Jun 2029 | In study |
| Rabbit Hollow Energy Storage1190 Barber Lake Switch 138kV | Rabbit Hollow Energy Storage, LLC | Battery storage (stand-alone) | 341.8 | Dec 2029 | In study |
| Rosenix SolarCattleman (#10053) – Gasconades (#76030) · shared with 1 other request | Rosenix Solar, LLC | Solar | 501.6 | Apr 2030 | In study |
| Rosenix StorageCattleman (#10053) – Gasconades (#76030) · shared with 1 other request | Rosenix Solar, LLC | Battery storage (paired with solar) | 258.3 | Apr 2030 | In study |
Crowded connection points in Mitchell County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Cattleman (10053) 345 kV 4 requests · 1,238 MW3 in study, 1 signed; security posted
- Hackberry Creek Solar 25INR0430 · Solar · 176 MW · Signed; security posted
- Rosenix Solar 29INR0212 · Solar · 502 MW · In study
- Prairie Power Wind 28INR0307 · Wind · 303 MW · In study
- Rosenix Storage 29INR0213 · Battery storage · 258 MW · In study
Gasconades Creek (76030) 345 kV 7 requests · 2,798 MW · 4 in Mitchell County, 3 in Sterling6 in study, 1 signed; security posted
- Goat Mountain Wind-Repower 27INR0367 · Wind · 303 MW · Signed; security posted · Sterling
- Zeus Spade Wind 26INR0386 · Wind · 987 MW · In study
- Rosenix Solar 29INR0212 · Solar · 502 MW · In study
- Zeus Spade BESS 26INR0387 · Battery storage · 446 MW · In study
- Rosenix Storage 29INR0213 · Battery storage · 258 MW · In study
- Goat Mountain BESS 26INR0589 · Battery storage · 201 MW · In study · Sterling
- Goat Mountain BESS 2 26INR0611 · Battery storage · 101 MW · In study · Sterling
Ranger Camp (10049) 345 kV 3 requests · 2,891 MW3 in study
- Zeus Mitchell BESS 25INR0589 · Battery storage · 1,043 MW · In study
- Zeus Mitchell BESS II 26INR0686 · Battery storage · 1,043 MW · In study
- Zeus Mitchell Solar 25INR0588 · Solar · 805 MW · In study
Prong Moss (10057) 345 kV 5 requests · 3,406 MW · 3 in Mitchell County, 2 in Howard5 in study
- Zeus Mitchell BESS 25INR0589 · Battery storage · 1,043 MW · In study
- Zeus Mitchell BESS II 26INR0686 · Battery storage · 1,043 MW · In study
- Zeus Mitchell Solar 25INR0588 · Solar · 805 MW · In study
- Crater BESS 22INR0347 · Battery storage · 310 MW · In study · Howard
- Midland Energy Storage 25INR0629 · Battery storage · 205 MW · In study · Howard
Longshore (1058) 345 kV 8 requests · 1,351 MW · 2 in Mitchell County, 6 in Howard, Glasscock3 approved for synchronization, 3 in study, 2 signed; security posted
- Panther Creek 1 Repower 24INR0578 · Wind · 11 MW · Approved for synchronization · Glasscock
- Panther Creek 2 Repower 24INR0582 · Wind · 8 MW · Approved for synchronization · Glasscock
- Elbow Creek repower 19INR0174 · Wind · 0 MW · Approved for synchronization · Howard
- Gusty Windpower 29INR0040 · Wind · 249 MW · Signed; security posted · Glasscock
- Hackberry Creek Solar 25INR0430 · Solar · 176 MW · Signed; security posted
- Infinium Solar 29INR0019 · Solar · 402 MW · In study · Howard
- Prairie Power Wind 28INR0307 · Wind · 303 MW · In study
- Odessa Energy Storage 25INR0611 · Battery storage · 203 MW · In study · Howard
Morgan Creek (1030) 345 kV 2 requests · 1,434 MW2 in study
- Zeus Spade Wind 26INR0386 · Wind · 987 MW · In study
- Zeus Spade BESS 26INR0387 · Battery storage · 446 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Mitchell County
- Mitchell County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Mitchell County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Mitchell County.
Permits and reviews for Mitchell County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Mitchell County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Mitchell County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.
How a project in Mitchell County connects to the grid
Mitchell County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Mitchell County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Mitchell County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 3
Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young