Proposed projects14
Total capacity3,772MW
Signed agreements8of 14
New since August1requests

14 proposed energy projects from ERCOT's September 2026 report, plus who to call in Jones County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.

Check land in Jones CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Jones County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Jones County?

ERCOT's September 2026 interconnection report lists 14 proposed energy projects in Jones County (9 solar and 5 battery storage), about 3,772 MW in all. 8 of the 14 have a signed interconnection agreement, and 3 have been approved for energization or synchronization. 1 is new since August.

What stands out in Jones County

By capacity, solar leads in Jones County with 2,513 MW across 9 projects, followed by battery storage (5 projects, 1,259 MW). The largest single project is Hackberry Draw Solar, a 653 MW solar project listed under Orsted Onshore Development North America, LLC, still in study, and its target online date is Apr 2030. Of the 14, 6 are still in ERCOT's study process, 5 have posted security or started construction and 3 are approved for energization or synchronization. Connection points are mostly at 345 kV (10 projects) and 138 kV (3 projects) (why the voltage matters). CED Development Inc. and Jones City Solar II, LLC are each listed on 2 projects; 12 different companies appear in all. Target online dates for the projects not yet running span Feb 2027 to Apr 2030. All of them fall in ERCOT's West load zone. 1 is new since August and 1 that was listed in August has since dropped off.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Crowded Star Solartap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substatio... · shared with 1 other requestJones City Solar, LLCSolar218.8Aug 2026Approved for synchronization
Crowded Star Solar IItap 345kV 68001 Claytonville – 68004 Phantom Hill c2 (New Substatio... · shared with 1 other requestJones City Solar II, LLCSolar189.5Sep 2026Approved for synchronization
Anson Solar 2existing tap 345 kV 68004 Phantom Hill stationAnson Solar Center 2, LLCSolar200.9Oct 2026Approved for synchronization
Funston Solartap 345 kV 68000 West Shackelford – 68004 Phantom Hill Circuit 2Funston Solar LLCSolar351.1Feb 2027Signed; security posted
Tiger Solar68004 PHANTOM HILL 345KVVaca Del Sol, LLCSolar250.9Feb 2027Signed; security posted
Crowded Star I BESS68014 Open SkyJones City Solar II, LLCBattery storage (paired with solar)202.7Jul 2027Signed; security posted
Anson BATtap 345 kV 68004 Phantom Hill stationAnson II Storage LLCBattery storage (paired with solar)153.6Dec 2027Signed; security posted
Hamby Solar6245 ABILENE ROBERTSON PRISON 138 KVAbilene GCE LLCSolar205.8Jun 2028Signed; security posted
Solara BESS 160387 Hendrick 138kV · shared with 1 other requestCED Development Inc.Battery storage (stand-alone)150.0Nov 2027In study
Solara BESS 260387 Hendrick 138kV · shared with 1 other requestCED Development Inc.Battery storage (stand-alone)150.0Nov 2027In study
Anson Solar Center, Phase IIItap 345kV 68000 WShack - 68001 ClaytonAnson Solar Center 3, LLCSolar200.0Jun 2028In study
Moccasin StorageTap 345kV #60707 Kirchhoff - #60515 Clear Crossing CKT-1ENGIE IR Holdings LLCBattery storage (paired with solar)603.1Jul 2028In study
Lone Tiger Solar NewTap 345 kV Claytonville (#68001) to phantom hill (#68004)Origis Development, LLCSolar242.8Oct 2029In study
Hackberry Draw SolarTap 345 kV (68000) West Shackleford - (60515) Clear Crossing Ckt 2Orsted Onshore Development North America, LLCSolar653.0Apr 2030In study

No longer listed since August

These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.

  • Skeeter Solar, solar, 251 MW (Mesquite Solar, LLC)

Crowded connection points in Jones County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Phantom Hill (68004) 345 kV 12 requests · 1,998 MW · 7 in Jones County, 5 in Fisher8 signed; security posted, 3 approved for synchronization, 1 in study
  • Crowded Star Solar 20INR0241 · Solar · 219 MW · Approved for synchronization
  • Anson Solar 2 20INR0242 · Solar · 201 MW · Approved for synchronization
  • Crowded Star Solar II 22INR0274 · Solar · 190 MW · Approved for synchronization
  • Funston Solar 29INR0015 · Solar · 351 MW · Signed; security posted
  • Tiger Solar 23INR0244 · Solar · 251 MW · Signed; security posted
  • Anson BAT 22INR0457 · Battery storage · 154 MW · Signed; security posted
  • Indigo Solar 21INR0031 · Solar · 150 MW · Signed; security posted · Fisher
  • Indigo Storage 24INR0496 · Battery storage · 60 MW · Signed; security posted · Fisher
  • Indigo Storage 2 25INR0528 · Battery storage · 60 MW · Signed; security posted · Fisher
  • Indigo Storage 3 25INR0529 · Battery storage · 60 MW · Signed; security posted · Fisher
  • Indigo Storage 4 25INR0530 · Battery storage · 60 MW · Signed; security posted · Fisher
  • Lone Tiger Solar 29INR0393 · Solar · 243 MW · In study
Claytonville (68001) 345 kV 11 requests · 1,840 MW · 4 in Jones County, 7 in Fisher5 signed; security posted, 3 approved for synchronization, 3 in study
  • Whitehorse Wind 19INR0080 · Wind · 419 MW · Approved for synchronization · Fisher
  • Crowded Star Solar 20INR0241 · Solar · 219 MW · Approved for synchronization
  • Crowded Star Solar II 22INR0274 · Solar · 190 MW · Approved for synchronization
  • Indigo Solar 21INR0031 · Solar · 150 MW · Signed; security posted · Fisher
  • Indigo Storage 24INR0496 · Battery storage · 60 MW · Signed; security posted · Fisher
  • Indigo Storage 2 25INR0528 · Battery storage · 60 MW · Signed; security posted · Fisher
  • Indigo Storage 3 25INR0529 · Battery storage · 60 MW · Signed; security posted · Fisher
  • Indigo Storage 4 25INR0530 · Battery storage · 60 MW · Signed; security posted · Fisher
  • Lone Tiger Solar 29INR0393 · Solar · 243 MW · In study
  • Anson Solar Center, Phase III 21INR0247 · Solar · 200 MW · In study
  • Indigo solar 2 25INR0547 · Solar · 180 MW · In study · Fisher
Wshack (68000) 345 kV 5 requests · 1,588 MW · 3 in Jones County, 2 in Fisher, Shackelford4 in study, 1 signed; security posted
  • Funston Solar 29INR0015 · Solar · 351 MW · Signed; security posted
  • Hackberry Draw Solar 30INR0146 · Solar · 653 MW · In study
  • Chimney Creek Solar 28INR0151 · Solar · 204 MW · In study · Shackelford
  • Anson Solar Center, Phase III 21INR0247 · Solar · 200 MW · In study
  • Indigo solar 2 25INR0547 · Solar · 180 MW · In study · Fisher
Hendrick (60387) 138 kV 2 requests · 300 MW2 in study
  • Solara BESS 1 24INR0378 · Battery storage · 150 MW · In study
  • Solara BESS 2 24INR0379 · Battery storage · 150 MW · In study
Clear Crossing (60515) 345 kV 11 requests · 5,068 MW · 2 in Jones County, 9 in Haskell, Jack, Stonewall7 in study, 4 signed; security posted
  • Moccasin Solar 26INR0269 · Solar · 604 MW · Signed; security posted · Stonewall
  • Briggs Storage 24INR0058 · Battery storage · 336 MW · Signed; security posted · Haskell
  • Briggs Solar 23INR0059 · Solar · 324 MW · Signed; security posted · Haskell
  • Inertia Solar 22INR0374 · Solar · 202 MW · Signed; security posted · Haskell
  • Dovetail Solar 1 24INR0094 · Solar · 666 MW · In study · Jack
  • Dovetail Solar 2 24INR0095 · Solar · 666 MW · In study · Jack
  • Hackberry Draw Solar 30INR0146 · Solar · 653 MW · In study
  • Moccasin Storage 27INR0452 · Battery storage · 603 MW · In study
  • Dovetail Storage 24INR0098 · Battery storage · 509 MW · In study · Jack
  • Blue Spring Solar 28INR0433 · Solar · 301 MW · In study · Haskell
  • Chimney Creek Solar 28INR0151 · Solar · 204 MW · In study · Shackelford

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Jones County

  • Jones County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Jones County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Jones County.

Permits and reviews for Jones County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Jones County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Jones County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.

How a project in Jones County connects to the grid

Jones County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Jones County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Jones County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources