Proposed projects6
Total capacity1,891MW
Signed agreements2of 6
New since August0requests

6 proposed energy projects from ERCOT's September 2026 report, plus who to call in Baylor County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.

Check land in Baylor CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Baylor County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Baylor County?

ERCOT's September 2026 interconnection report lists 6 proposed energy projects in Baylor County (4 solar and 2 wind), about 1,891 MW in all. 2 of the 6 have a signed interconnection agreement.

What stands out in Baylor County

By capacity, solar leads in Baylor County with 1,106 MW across 4 projects, followed by wind (2 projects, 785 MW). The largest single project is Dundee East A Wind, a 524 MW wind project listed under Felix 2, LLC, with its agreement signed and security posted, and its target online date is Dec 2027. Of the 6, 4 are still in ERCOT's study process and 2 have posted security or started construction. Connection points are mostly at 345 kV (2 projects) and 69 kV (1 project) (why the voltage matters). The single most-used connection point is Tap into 6076 FOXTAIL- 6100 OKLAUNION, shared by 3 projects. Felix 2, LLC is listed on the most projects here (2 of 6); 5 different companies appear in all. Target online dates for the projects not yet running span Dec 2027 to Dec 2029. All of them fall in ERCOT's West load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Dundee East A Wind345 kV Riley Substation (#6101); AEP · shared with 2 other requestsFelix 2, LLCWind524.0Dec 2027Signed; security posted
Dundee East B Wind345 kV Riley Substation (#6101); AEP · shared with 2 other requestsFelix 2, LLCWind261.4Dec 2027Signed; security posted
Young Road SolarThe POI B is TAP 69 KV LINE AND CREATE NEW BUS BETWEENWESTOVER (784...reNRG TX 5 LLCSolar101.7Apr 2028In study
Velveteen Solar ITap into 6076 FOXTAIL- 6100 OKLAUNION · shared with 2 other requestsVelveteen Solar, LLCSolar502.2Oct 2029In study
Velveteen Solar IITap into 6076 FOXTAIL- 6100 OKLAUNION · shared with 2 other requestsVelveteen Solar II, LLCSolar300.9Dec 2029In study
Velveteen Solar IIITap into 6076 FOXTAIL- 6100 OKLAUNION · shared with 2 other requestsVelveteen Solar III, LLCSolar200.7Dec 2029In study

Crowded connection points in Baylor County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Foxtail (6076) 345 kV 5 requests · 1,658 MW · 3 in Baylor County, 2 in Knox3 in study, 2 signed
  • Oriole Solar 28INR0008 · Solar · 504 MW · Signed Dec 2025 · Knox
  • Oriole BES 28INR0009 · Battery storage · 150 MW · Signed Dec 2025 · Knox
  • Velveteen Solar I 29INR0198 · Solar · 502 MW · In study
  • Velveteen Solar II 29INR0225 · Solar · 301 MW · In study
  • Velveteen Solar III 29INR0226 · Solar · 201 MW · In study
Oklaunion (6100) 3 requests · 1,004 MW3 in study
  • Velveteen Solar I 29INR0198 · Solar · 502 MW · In study
  • Velveteen Solar II 29INR0225 · Solar · 301 MW · In study
  • Velveteen Solar III 29INR0226 · Solar · 201 MW · In study
RILEY7A (6101) 345 kV 22 requests · 9,936 MW · 2 in Baylor County, 20 in Wilbarger, Wichita, Foard12 in study, 9 signed; security posted, 1 signed
  • Limitless Energy Hub II 27INR0582 · Gas combined cycle · 1,238 MW · Signed; security posted · Wilbarger
  • Short Creek Solar 24INR0201 · Solar · 628 MW · Signed; security posted · Wichita
  • Dundee East A Wind 27INR0005 · Wind · 524 MW · Signed; security posted
  • Dundee East B Wind 27INR0011 · Wind · 261 MW · Signed; security posted
  • Felix North Solar 22INR0209 · Solar · 201 MW · Signed; security posted · Wilbarger
  • Felix West Solar 27INR0012 · Solar · 201 MW · Signed; security posted · Wilbarger
  • Felix East Solar 27INR0007 · Solar · 201 MW · Signed; security posted · Wilbarger
  • Short Creek BESS 27INR0029 · Battery storage · 156 MW · Signed; security posted · Wichita
  • Dundee West Wind 27INR0004 · Wind · 146 MW · Signed; security posted · Wilbarger
  • Limitless Energy Hub I 27INR0581 · Gas combined cycle · 1,238 MW · Signed Dec 2025 · Wilbarger
  • H&C WILBARGER POWER I 32INR0006 · Gas combined cycle · 1,026 MW · In study · Wilbarger
  • H&C WILBARGER POWER II 32INR0008 · Gas combined cycle · 1,026 MW · In study · Wilbarger
  • TEXPO 22INR0497 · Gas steam turbine · 680 MW · In study · Wilbarger
  • Big Field Solar 29INR0148 · Solar · 506 MW · In study · Foard
  • Poco Trail Solar 23INR0273 · Solar · 439 MW · In study · Wilbarger
  • Copperleaf Energy Storage 28INR0118 · Battery storage · 306 MW · In study · Wichita
  • Pease River Solar 28INR0476 · Solar · 276 MW · In study · Foard
  • Grayback Solar 28INR0464 · Solar · 222 MW · In study · Wilbarger
  • Supra Wind 27INR0063 · Wind · 206 MW · In study · Hardeman
  • Daisy Solar 28INR0535 · Solar · 201 MW · In study · Foard
  • Wichita County Mawson Storage 26INR0613 · Battery storage · 154 MW · In study · Wichita
  • Felix Storage 27INR0009 · Battery storage · 101 MW · In study · Wilbarger

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Baylor County

  • Baylor County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Baylor County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Baylor County.

Permits and reviews for Baylor County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Baylor County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Baylor County connects to the grid

Baylor County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Baylor County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Baylor County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 3

Archer · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources