Proposed projects7
Total capacity2,204MW
Signed agreements0of 7
New since August0requests

7 proposed energy projects from ERCOT's September 2026 report, plus who to call in Young County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.

Check land in Young CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Young County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Young County?

ERCOT's September 2026 interconnection report lists 7 proposed energy projects in Young County (3 solar and 4 battery storage), about 2,204 MW in all. None has a signed interconnection agreement yet. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.

What stands out in Young County

By capacity, battery storage leads in Young County with 1,171 MW across 4 projects, followed by solar (3 projects, 1,034 MW). The largest single project is Miller Bend Energy BESS, a 548 MW battery storage paired with solar project listed under Miller Bend Energy , LLC, still in study, and its target online date is Dec 2029. Of the 7, 7 are still in ERCOT's study process. Connection points are mostly at 345 kV (4 projects) and 138 kV (3 projects) (why the voltage matters). Sweetheart Energy, LLC is listed on the most projects here (2 of 7); 6 different companies appear in all. Target online dates for the projects not yet running span Aug 2028 to Dec 2029. All of them fall in ERCOT's West load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Trinity Hills Wind repower17002 Garvey Rd 345kVTrinity Hills Wind Farm LLCWind−27.0 capacity change to an existing plantDec 2026Approved for synchronization
Young County Energy StorageTAP 138 KV BUS AND CREAT NEW BUS BETWEEN MURRAY (792) AND GRAHAM SE...Young County Energy Storage LLCBattery storage (stand-alone)104.5Aug 2028In study
Red Top Solar ITap 138kV 1431 Graham SES - Short Grass 11525Cat Red Top Solar, LLCSolar200.6Apr 2029In study
Jolly Rock Storage CenterTap 138kV 1431 GRAHAM Plant Switch - 11525 Short Grass Circuit 1.Jolly Rock Storage Center LLCBattery storage (stand-alone)208.6May 2029In study
Miller Bend Energy BESSTap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road · shared with 1 other requestMiller Bend Energy , LLCBattery storage (paired with solar)547.6Dec 2029In study
Miller Bend Energy SolarTap 345kV (Bus1#1430) Graham SES to (Bus2#11050) Dusty Road · shared with 1 other requestMiller Bend Energy, LLCSolar531.8Dec 2029In study
Sweetheart BESSTap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH · shared with 1 other requestSweetheart Energy, LLCBattery storage (paired with solar)310.2Dec 2029In study
Sweetheart SolarTap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH · shared with 1 other requestSweetheart Energy, LLCSolar301.1Dec 2029In study

Crowded connection points in Young County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Graham (1430) 345 kV 12 requests · 4,716 MW · 4 in Young County, 8 in Throckmorton, Haskell, Fisher10 in study, 2 approved for synchronization
  • Solace Storage 26INR0309 · Battery storage · 322 MW · Approved for synchronization · Haskell
  • Solace Solar 23INR0031 · Solar · 322 MW · Approved for synchronization · Haskell
  • Indigo Solar 3 28INR0067 · Solar · 800 MW · In study · Fisher
  • Jenna Eco-Electric Solar 25INR0632 · Solar · 576 MW · In study · Fisher
  • Miller Bend Energy BESS 29INR0204 · Battery storage · 548 MW · In study
  • Miller Bend Energy Solar 29INR0203 · Solar · 532 MW · In study
  • Pinnington Storage 24INR0011 · Battery storage · 503 MW · In study · Jack
  • Sweetheart BESS 29INR0172 · Battery storage · 310 MW · In study
  • Sweetheart Solar 29INR0171 · Solar · 301 MW · In study
  • Sideoats Solar 1 30INR0123 · Solar · 168 MW · In study · Throckmorton
  • Sideoats Solar 2 30INR0124 · Solar · 168 MW · In study · Throckmorton
  • Sideoats Solar 3 30INR0125 · Solar · 168 MW · In study · Throckmorton
Graham Ses (1431) 138 kV 3 requests · 514 MW3 in study
  • Jolly Rock Storage Center 29INR0084 · Battery storage · 209 MW · In study
  • Red Top Solar I 25INR0306 · Solar · 201 MW · In study
  • Young County Energy Storage 26INR0302 · Battery storage · 104 MW · In study
Short Grass (11525) 138 kV 2 requests · 409 MW2 in study
  • Jolly Rock Storage Center 29INR0084 · Battery storage · 209 MW · In study
  • Red Top Solar I 25INR0306 · Solar · 201 MW · In study
Garvey Road (17002) 345 kV 6 requests · 1,014 MW · 2 in Young County, 3 in Archer5 in study, 1 approved for synchronization
  • Trinity Hills Wind repower 20INR0019 · Wind · -27 MW · Approved for synchronization
  • Sweetheart BESS 29INR0172 · Battery storage · 310 MW · In study
  • Red Hollow Renewable Energy Solar SLF 28INR0088 · Solar · 309 MW · In study · Archer
  • Sweetheart Solar 29INR0171 · Solar · 301 MW · In study
  • Trinity Hills BESS SLF 26INR0295 · Battery storage · 94 MW · In study · Archer
  • Red Hollow Renewable Energy BESS SLF 27INR0279 · Battery storage · 0 MW · In study · Archer
BUS2 (11050) 345 kV 7 requests · 4,833 MW · 2 in Young County, 5 in Throckmorton, Fisher7 in study
  • Brazos Energy Security 28INR0456 · Gas combined cycle · 3,000 MW · In study · Fisher
  • Miller Bend Energy BESS 29INR0204 · Battery storage · 548 MW · In study
  • Miller Bend Energy Solar 29INR0203 · Solar · 532 MW · In study
  • Alkali Creek Wind 2 28INR0478 · Wind · 250 MW · In study · Fisher
  • Sideoats Solar 1 30INR0123 · Solar · 168 MW · In study · Throckmorton
  • Sideoats Solar 2 30INR0124 · Solar · 168 MW · In study · Throckmorton
  • Sideoats Solar 3 30INR0125 · Solar · 168 MW · In study · Throckmorton

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Young County

  • Young County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Young County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Young County.

Permits and reviews for Young County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Young County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Young County connects to the grid

Young County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Young County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Young County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources