Proposed projects8
Total capacity2,194MW
Signed agreements0of 8
New since August0requests

8 proposed energy projects from ERCOT's September 2026 report, plus who to call in Hardeman County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.

Check land in Hardeman CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Hardeman County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Hardeman County?

ERCOT's September 2026 interconnection report lists 8 proposed energy projects in Hardeman County (4 solar, 1 wind and 3 battery storage), about 2,194 MW in all. None has a signed interconnection agreement yet.

What stands out in Hardeman County

By capacity, solar leads in Hardeman County with 1,381 MW across 4 projects, followed by battery storage (3 projects, 607 MW) and wind (1 project, 206 MW). The largest single project is Tabor Solar, a 506 MW solar project listed under Quanah Solar LLC, still in study, and its target online date is Apr 2027. Of the 8, 8 are still in ERCOT's study process. Connection points are mostly at 345 kV (6 projects) and 138 kV (1 project) (why the voltage matters). Each of the 8 projects is listed under a different company. Target online dates for the projects not yet running span Apr 2027 to Jun 2029. All of them fall in ERCOT's West load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Tabor SolarTap 345kV 60504 Tesla - 61001 Jim Treece · shared with 1 other requestQuanah Solar LLCSolar506.4Apr 2027In study
Supra WindTap #6101 Riley 7A to #60505 Edithcla 7B 345kVNextEra Energy Interconnection Holdings, LLCWind205.9Dec 2027In study
Hardeman BESS6050 PAUL 138kVQuanah BESS LLCBattery storage (stand-alone)104.0Jun 2028In study
Earthwise SolarTap 345kV 60504 Tesla - 61001 Jim Treece · shared with 1 other requestQuanah Solar 2Solar370.5Dec 2028In study
Juniper Ridge BESS 1Tap EDITHCLA7B [60505] -- TESLA7A [60501] 345kV ckt2Lazy U ESS 1Battery storage (stand-alone)251.5Jun 2029In study
Juniper Ridge BESS 2Tap EDITHCLA7B [60505] -- TESLA7A [60501] ckt2Lazy U ESS 2Battery storage (stand-alone)251.5Jun 2029In study
Lazy U Solar 1Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A ckt2 · shared with 1 other requestLazy U Solar 1Solar252.0Jun 2029In study
Lazy U Solar 2Tap 345kV 60505 EDITHCLA7B - 60501 TESLA7A CKT2 · shared with 1 other requestLazy U Solar 2Solar252.0Jun 2029In study

Crowded connection points in Hardeman County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

EDITHCLA7B (60505) 345 kV 13 requests · 6,946 MW · 5 in Hardeman County, 8 in Wilbarger, Foard11 in study, 1 signed, 1 signed; security posted
  • Limitless Energy Hub II 27INR0582 · Gas combined cycle · 1,238 MW · Signed; security posted · Wilbarger
  • Limitless Energy Hub I 27INR0581 · Gas combined cycle · 1,238 MW · Signed Dec 2025 · Wilbarger
  • H&C WILBARGER POWER I 32INR0006 · Gas combined cycle · 1,026 MW · In study · Wilbarger
  • H&C WILBARGER POWER II 32INR0008 · Gas combined cycle · 1,026 MW · In study · Wilbarger
  • Big Field Solar 29INR0148 · Solar · 506 MW · In study · Foard
  • Pease River Solar 28INR0476 · Solar · 276 MW · In study · Foard
  • Lazy U Solar 1 26INR0171 · Solar · 252 MW · In study
  • Lazy U Solar 2 26INR0172 · Solar · 252 MW · In study
  • Juniper Ridge BESS 1 26INR0173 · Battery storage · 252 MW · In study
  • Juniper Ridge BESS 2 26INR0174 · Battery storage · 252 MW · In study
  • Grayback Solar 28INR0464 · Solar · 222 MW · In study · Wilbarger
  • Supra Wind 27INR0063 · Wind · 206 MW · In study
  • Daisy Solar 28INR0535 · Solar · 201 MW · In study · Foard
Tesla (60501) 345 kV 7 requests · 1,277 MW · 4 in Hardeman County, 3 in Childress6 in study, 1 signed; security posted
  • Fagus Solar Park 3 SLF 26INR0524 · Solar · 170 MW · Signed; security posted · Childress
  • Lazy U Solar 1 26INR0171 · Solar · 252 MW · In study
  • Lazy U Solar 2 26INR0172 · Solar · 252 MW · In study
  • Juniper Ridge BESS 1 26INR0173 · Battery storage · 252 MW · In study
  • Juniper Ridge BESS 2 26INR0174 · Battery storage · 252 MW · In study
  • Independence Trail Storage 21INR0455 · Battery storage · 100 MW · In study · Childress
  • Fagus Storage SLF 25INR0515 · Battery storage · 0 MW · In study · Childress
Tesla (60504) 345 kV 6 requests · 1,936 MW · 2 in Hardeman County, 4 in Wilbarger6 in study
  • Reunion Solar 28INR0332 · Solar · 601 MW · In study · Wilbarger
  • Tabor Solar 23INR0055 · Solar · 506 MW · In study
  • Earthwise Solar 23INR0233 · Solar · 370 MW · In study
  • Reunion Storage 28INR0333 · Battery storage · 200 MW · In study · Wilbarger
  • White Wing Storage 27INR0333 · Battery storage · 130 MW · In study · Wilbarger
  • White Wing Solar 27INR0332 · Solar · 127 MW · In study · Wilbarger
Jim Treece (61001) 345 kV 4 requests · 1,280 MW · 2 in Hardeman County, 2 in Wilbarger3 in study, 1 approved for synchronization
  • Blue Summit Energy Storage 25INR0492 · Battery storage · 100 MW · Approved for synchronization · Wilbarger
  • Tabor Solar 23INR0055 · Solar · 506 MW · In study
  • Earthwise Solar 23INR0233 · Solar · 370 MW · In study
  • Wander Waters BESS 27INR0207 · Battery storage · 304 MW · In study · Wilbarger

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Hardeman County

  • Hardeman County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Hardeman County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Hardeman County.

Permits and reviews for Hardeman County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Hardeman County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Hardeman County connects to the grid

Hardeman County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Hardeman County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Hardeman County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources