Foard County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
5 proposed energy projects from ERCOT's September 2026 report, plus who to call in Foard County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.
Check land in Foard CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Foard County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Foard County?
ERCOT's September 2026 interconnection report lists 5 proposed energy projects in Foard County (3 solar, 1 wind and 1 battery storage), about 1,594 MW in all. 1 of the 5 has a signed interconnection agreement.
What stands out in Foard County
By capacity, solar leads in Foard County with 983 MW across 3 projects, followed by battery storage (1 project, 309 MW) and wind (1 project, 302 MW). The largest single project is Big Field Solar, a 506 MW solar project listed under Big Field Solar Energy LLC, still in study, and its target online date is Dec 2029. Of the 5, 4 are still in ERCOT's study process and 1 has posted security or started construction. Every listed connection point is on the 345 kV system (why the voltage matters). The single most-used connection point is Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B, shared by 3 projects. Each of the 5 projects is listed under a different company. Target online dates for the projects not yet running span Oct 2027 to Jun 2030. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Seine BESS60500 Edith Clarke 345kV | BRP Seine BESS LLC | Battery storage (stand-alone) | 308.9 | Oct 2027 | Signed; security posted |
| Daisy SolarTap 345kV 6101 RILEY7A - 60505 EDITHCLA7B · shared with 5 other requests | Daisy Solar LLC | Solar | 200.9 | Jun 2029 | In study |
| Pease River SolarTap 345kV 6101 RILEY7A - 60505 EDITHCLA7B · shared with 5 other requests | Pease River Solar LLC | Solar | 276.4 | Jun 2029 | In study |
| Big Field SolarTap 345kV 6101 RILEY7A - 60505 EDITHCLA7B · shared with 5 other requests | Big Field Solar Energy LLC | Solar | 506.2 | Dec 2029 | In study |
| Montgomery Ranch 2 Wind60059 Penumbra 345-kV | RWE Clean Energy Development, LLC | Wind | 301.5 | Jun 2030 | In study |
Crowded connection points in Foard County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
RILEY7A (6101) 345 kV 22 requests · 9,936 MW · 3 in Foard County, 19 in Wilbarger, Wichita, Baylor12 in study, 9 signed; security posted, 1 signed
- Limitless Energy Hub II 27INR0582 · Gas combined cycle · 1,238 MW · Signed; security posted · Wilbarger
- Short Creek Solar 24INR0201 · Solar · 628 MW · Signed; security posted · Wichita
- Dundee East A Wind 27INR0005 · Wind · 524 MW · Signed; security posted · Baylor
- Dundee East B Wind 27INR0011 · Wind · 261 MW · Signed; security posted · Baylor
- Felix North Solar 22INR0209 · Solar · 201 MW · Signed; security posted · Wilbarger
- Felix West Solar 27INR0012 · Solar · 201 MW · Signed; security posted · Wilbarger
- Felix East Solar 27INR0007 · Solar · 201 MW · Signed; security posted · Wilbarger
- Short Creek BESS 27INR0029 · Battery storage · 156 MW · Signed; security posted · Wichita
- Dundee West Wind 27INR0004 · Wind · 146 MW · Signed; security posted · Wilbarger
- Limitless Energy Hub I 27INR0581 · Gas combined cycle · 1,238 MW · Signed Dec 2025 · Wilbarger
- H&C WILBARGER POWER I 32INR0006 · Gas combined cycle · 1,026 MW · In study · Wilbarger
- H&C WILBARGER POWER II 32INR0008 · Gas combined cycle · 1,026 MW · In study · Wilbarger
- TEXPO 22INR0497 · Gas steam turbine · 680 MW · In study · Wilbarger
- Big Field Solar 29INR0148 · Solar · 506 MW · In study
- Poco Trail Solar 23INR0273 · Solar · 439 MW · In study · Wilbarger
- Copperleaf Energy Storage 28INR0118 · Battery storage · 306 MW · In study · Wichita
- Pease River Solar 28INR0476 · Solar · 276 MW · In study
- Grayback Solar 28INR0464 · Solar · 222 MW · In study · Wilbarger
- Supra Wind 27INR0063 · Wind · 206 MW · In study · Hardeman
- Daisy Solar 28INR0535 · Solar · 201 MW · In study
- Wichita County Mawson Storage 26INR0613 · Battery storage · 154 MW · In study · Wichita
- Felix Storage 27INR0009 · Battery storage · 101 MW · In study · Wilbarger
EDITHCLA7B (60505) 345 kV 13 requests · 6,946 MW · 3 in Foard County, 10 in Hardeman, Wilbarger11 in study, 1 signed, 1 signed; security posted
- Limitless Energy Hub II 27INR0582 · Gas combined cycle · 1,238 MW · Signed; security posted · Wilbarger
- Limitless Energy Hub I 27INR0581 · Gas combined cycle · 1,238 MW · Signed Dec 2025 · Wilbarger
- H&C WILBARGER POWER I 32INR0006 · Gas combined cycle · 1,026 MW · In study · Wilbarger
- H&C WILBARGER POWER II 32INR0008 · Gas combined cycle · 1,026 MW · In study · Wilbarger
- Big Field Solar 29INR0148 · Solar · 506 MW · In study
- Pease River Solar 28INR0476 · Solar · 276 MW · In study
- Lazy U Solar 1 26INR0171 · Solar · 252 MW · In study · Hardeman
- Lazy U Solar 2 26INR0172 · Solar · 252 MW · In study · Hardeman
- Juniper Ridge BESS 1 26INR0173 · Battery storage · 252 MW · In study · Hardeman
- Juniper Ridge BESS 2 26INR0174 · Battery storage · 252 MW · In study · Hardeman
- Grayback Solar 28INR0464 · Solar · 222 MW · In study · Wilbarger
- Supra Wind 27INR0063 · Wind · 206 MW · In study · Hardeman
- Daisy Solar 28INR0535 · Solar · 201 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Foard County
- Foard County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Foard County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Foard County.
Permits and reviews for Foard County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Foard County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Foard County connects to the grid
Foard County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Foard County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Foard County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 3
Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young