Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Knox County

Knox County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects8
Total capacity1,861MW
Signed agreements4of 8
New since August0requests

8 proposed energy projects from ERCOT's September 2026 report, plus who to call in Knox County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.

Check land in Knox CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Knox County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Knox County?

ERCOT's September 2026 interconnection report lists 8 proposed energy projects in Knox County (4 solar, 1 wind and 3 battery storage), about 1,861 MW in all. 4 of the 8 have a signed interconnection agreement.

What stands out in Knox County

By capacity, solar leads in Knox County with 1,228 MW across 4 projects, followed by wind (1 project, 352 MW) and battery storage (3 projects, 281 MW). The largest single project is Oriole Solar, a 504 MW solar project listed under Rolling Plains Solar, with an interconnection agreement signed in Dec 2025, and its target online date is Dec 2028. Of the 8, 4 are still in ERCOT's study process, 2 have a signed interconnection agreement but no security posted yet and 2 have posted security or started construction. Connection points are mostly at 345 kV (4 projects) and 138 kV (4 projects) (why the voltage matters). Rolling Plains Solar is listed on the most projects here (2 of 8); 7 different companies appear in all. Target online dates for the projects not yet running span Jun 2028 to Sep 2029. All of them fall in ERCOT's West load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Zeissel Solar#60094 Joule 345kVZSS Power, LLCSolar451.5Jun 2028Signed; security posted
West Munday WindTap 345kV 60703 Gauss7D – 60712 QuasarLake Creek Wind, LLCWind351.9Aug 2029Signed; security posted
Oriole BESTap 345kV 6076 Foxtail - 60791 Perigee · shared with 1 other requestRolling Plains SolarBattery storage (paired with solar)150.4Dec 2028Signed Dec 2025
Oriole SolarTap 345kV 6076 Foxtail - 60791 Perigee · shared with 1 other requestRolling Plains SolarSolar503.9Dec 2028Signed Dec 2025
Knox County Moore Storage6110 Munday East Substation 138kVDM-KCM, LLCBattery storage (stand-alone)77.0Jun 2028In study
Lemma Solar6088 Benjamin AEP 138kVGreening USA Corp.Solar100.6Jul 2028In study
Wagon Timber Solar6110 Munday East 138kV · shared with 1 other requestWagon Timber Solar, LLCSolar172.1Sep 2029In study
Wagon Timber Storage6110 Munday East 138kV · shared with 1 other requestWagon Timber Storage, LLCBattery storage (paired with solar)53.5Sep 2029In study

Crowded connection points in Knox County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Munday East (6110) 138 kV 3 requests · 303 MW3 in study
  • Wagon Timber Solar 28INR0206 · Solar · 172 MW · In study
  • Knox County Moore Storage 26INR0617 · Battery storage · 77 MW · In study
  • Wagon Timber Storage 28INR0207 · Battery storage · 53 MW · In study
Foxtail (6076) 345 kV 5 requests · 1,658 MW · 2 in Knox County, 3 in Baylor3 in study, 2 signed
  • Oriole Solar 28INR0008 · Solar · 504 MW · Signed Dec 2025
  • Oriole BES 28INR0009 · Battery storage · 150 MW · Signed Dec 2025
  • Velveteen Solar I 29INR0198 · Solar · 502 MW · In study · Baylor
  • Velveteen Solar II 29INR0225 · Solar · 301 MW · In study · Baylor
  • Velveteen Solar III 29INR0226 · Solar · 201 MW · In study · Baylor
Perigee (60791) 345 kV 2 requests · 654 MW2 signed
  • Oriole Solar 28INR0008 · Solar · 504 MW · Signed Dec 2025
  • Oriole BES 28INR0009 · Battery storage · 150 MW · Signed Dec 2025

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Knox County

  • Knox County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Knox County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Knox County.

Permits and reviews for Knox County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Knox County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Knox County connects to the grid

Knox County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Knox County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Knox County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.