Coleman County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
7 proposed energy projects from ERCOT's September 2026 report, plus who to call in Coleman County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.
Check land in Coleman CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Coleman County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Coleman County?
ERCOT's September 2026 interconnection report lists 7 proposed energy projects in Coleman County (5 solar and 2 battery storage), about 1,747 MW in all. 1 of the 7 has a signed interconnection agreement.
What stands out in Coleman County
By capacity, solar leads in Coleman County with 1,405 MW across 5 projects, followed by battery storage (2 projects, 342 MW). The largest single project is Hanson Solar, a 399 MW solar project listed under Hanson Solar, LLC, with its agreement signed and security posted, and its target online date is Aug 2027. Of the 7, 6 are still in ERCOT's study process and 1 has posted security or started construction. Connection points are mostly at 345 kV (6 projects) and 138 kV (1 project) (why the voltage matters). The single most-used connection point is Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown..., shared by 5 projects. Renew Development HoldCo LLC is listed on the most projects here (5 of 7); 3 different companies appear in all. Target online dates for the projects not yet running span Aug 2027 to Oct 2030. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Hanson Solartap 345kV 1444 Brown - 11406 Central Bluff | Hanson Solar, LLC | Solar | 398.8 | Aug 2027 | Signed; security posted |
| Invictus Energy Storage6390 FIREROCK4A 138kV | GSA Land Holdings | Battery storage (stand-alone) | 140.5 | May 2028 | In study |
| Paintbrush PV1Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown... · shared with 4 other requests | Renew Development HoldCo LLC | Solar | 251.5 | May 2030 | In study |
| Paintbrush PV2Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown... · shared with 4 other requests | Renew Development HoldCo LLC | Solar | 251.5 | May 2030 | In study |
| Paintbrush BESS1Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown... · shared with 4 other requests | Renew Development HoldCo LLC | Battery storage (paired with solar) | 201.3 | Oct 2030 | In study |
| Paintbrush PV3Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown... · shared with 4 other requests | Renew Development HoldCo LLC | Solar | 251.5 | Oct 2030 | In study |
| Paintbrush PV4Tap 345kV 1444 Brown Switch – 60040 Bluff Creek Switch & 1444 Brown... · shared with 4 other requests | Renew Development HoldCo LLC | Solar | 251.5 | Oct 2030 | In study |
Crowded connection points in Coleman County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Brown (1444) 345 kV 19 requests · 4,694 MW · 6 in Coleman County, 13 in Brown, Mills, Runnels15 in study, 3 signed; security posted, 1 approved for synchronization
- Priddy Wind 16INR0085 · Wind · 302 MW · Approved for synchronization · Mills
- Hanson Solar 23INR0086 · Solar · 399 MW · Signed; security posted
- Chisme Storage 24INR0331 · Battery storage · 151 MW · Signed; security posted · Brown
- Chisme Solar 24INR0333 · Solar · 147 MW · Signed; security posted · Brown
- Brookesmith Storage 28INR0166 · Battery storage · 351 MW · In study · Brown
- Mountaineer Solar 21INR0294 · Solar · 329 MW · In study · Brown
- Soluce Bravo Storage 28INR0270 · Battery storage · 303 MW · In study · Brown
- Winters Glow Solar 28INR0198 · Solar · 302 MW · In study · Runnels
- Horseshoe Bend Solar 19INR0075 · Solar · 301 MW · In study · Brown
- Nouveau BESS 27INR0291 · Battery storage · 256 MW · In study · Brown
- Paintbrush PV1 28INR0469 · Solar · 252 MW · In study
- Paintbrush PV2 28INR0470 · Solar · 252 MW · In study
- Paintbrush PV3 29INR0220 · Solar · 252 MW · In study
- Paintbrush PV4 29INR0221 · Solar · 252 MW · In study
- Clapton Storage 26INR0430 · Battery storage · 209 MW · In study · Mills
- Paintbrush BESS1 29INR0222 · Battery storage · 201 MW · In study
- Clapton Solar 26INR0238 · Solar · 201 MW · In study · Mills
- Winters Glow Storage 28INR0199 · Battery storage · 155 MW · In study · Runnels
- Soluce Bravo Solar 28INR0269 · Solar · 81 MW · In study · Brown
Bluff Creek (60040) 345 kV 10 requests · 3,121 MW · 5 in Coleman County, 5 in Runnels, Taylor10 in study
- Dog Star Solar I 27INR0503 · Solar · 499 MW · In study · Taylor
- Dog Star Solar II 27INR0504 · Solar · 499 MW · In study · Taylor
- Mistflower Energy Center Solar 30INR0088 · Solar · 402 MW · In study · Runnels
- Mistflower Energy Center Storage 30INR0089 · Battery storage · 313 MW · In study · Runnels
- Paintbrush PV1 28INR0469 · Solar · 252 MW · In study
- Paintbrush PV2 28INR0470 · Solar · 252 MW · In study
- Paintbrush PV3 29INR0220 · Solar · 252 MW · In study
- Paintbrush PV4 29INR0221 · Solar · 252 MW · In study
- Sawtooth Solar 29INR0210 · Solar · 201 MW · In study · Runnels
- Paintbrush BESS1 29INR0222 · Battery storage · 201 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Coleman County
- Coleman County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Coleman County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Coleman County.
Permits and reviews for Coleman County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Coleman County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Coleman County connects to the grid
Coleman County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Coleman County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Coleman County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.