Callahan County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects5
Total capacity1,571MW
Signed agreements2of 5
New since August0requests

5 proposed energy projects from ERCOT's September 2026 report, plus who to call in Callahan County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.

Check land in Callahan CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Callahan County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Callahan County?

ERCOT's September 2026 interconnection report lists 5 proposed energy projects in Callahan County (2 solar, 1 wind and 2 battery storage), about 1,571 MW in all. 2 of the 5 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.

What stands out in Callahan County

By capacity, solar leads in Callahan County with 820 MW across 2 projects, followed by battery storage (2 projects, 410 MW) and wind (1 project, 340 MW). The largest single project is Sequoia II Solar, a 417 MW solar project listed under ENBRIDGE SOLAR SEQUOIA II LLC, with its agreement signed and security posted, and its target online date is Jan 2027. Of the 5, 3 are still in ERCOT's study process, 1 has posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (4 projects) and 138 kV (1 project) (why the voltage matters). 174 Power Global Properties is listed on the most projects here (2 of 5); 4 different companies appear in all. Target online dates for the projects not yet running span Jan 2027 to Dec 2028. All of them fall in ERCOT's West load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Baird North Wind68008 Latimer 345kVBMP Wind, LLCWind340.0Dec 2026Approved for synchronization
Sequoia II Solar68051 Reata 345kV · shared with 1 other requestENBRIDGE SOLAR SEQUOIA II LLCSolar417.5Jan 2027Signed; security posted
Guitar BESSTap 138kV 6275 ABEAST4A - 6670 PUTN4CGuitar BESS LLCBattery storage (stand-alone)204.8Dec 2027In study
Hittson Creek BESSTapping the two 345 kV Lines: Sam Line Reactor (Bus# 68005) - Reata... · shared with 1 other request174 Power Global PropertiesBattery storage (paired with solar)205.4Dec 2028In study
Hittson Creek SolarTapping the two 345 kV Lines: Sam Line Reactor (Bus# 68005) - Reata... · shared with 1 other request174 Power Global PropertiesSolar402.9Dec 2028In study

Crowded connection points in Callahan County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Reata (68051) 345 kV 5 requests · 1,033 MW · 3 in Callahan County, 2 in Eastland2 signed; security posted, 2 in study, 1 approved for synchronization
  • Roadrunner Crossing BESS SLF 23INR0538 · Battery storage · 0 MW · Approved for synchronization · Eastland
  • Sequoia II Solar 22INR0262 · Solar · 417 MW · Signed; security posted
  • Roadrunner Crossing Wind (Uprate) 26INR0726 · Wind · 7 MW · Signed; security posted · Eastland
  • Hittson Creek Solar 28INR0245 · Solar · 403 MW · In study
  • Hittson Creek BESS 28INR0246 · Battery storage · 205 MW · In study
Bus 68005 (68005) 345 kV 2 requests · 608 MW2 in study
  • Hittson Creek Solar 28INR0245 · Solar · 403 MW · In study
  • Hittson Creek BESS 28INR0246 · Battery storage · 205 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Callahan County

  • Callahan County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Callahan County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Callahan County.

Permits and reviews for Callahan County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Callahan County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Callahan County connects to the grid

Callahan County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Callahan County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Callahan County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources