Howard County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
15 proposed energy projects from ERCOT's September 2026 report, plus who to call in Howard County and in TCEQ Region 7 before signing a solar, wind, or battery storage lease.
Check land in Howard CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Howard County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Howard County?
ERCOT's September 2026 interconnection report lists 15 proposed energy projects in Howard County (3 solar, 2 wind and 10 battery storage), about 2,480 MW in all. 1 of the 15 has a signed interconnection agreement. The table also lists 2 changes to existing plants (repowers or capacity changes), not counted above.
What stands out in Howard County
By capacity, battery storage leads in Howard County with 1,659 MW across 10 projects, followed by solar (3 projects, 566 MW) and wind (2 projects, 254 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Infinium Solar, a 402 MW solar project listed under Jackalope Flats Solar, LLC, still in study, and its target online date is Jul 2029. Of the 15, 14 are still in ERCOT's study process and 1 has posted security or started construction. Connection points are mostly at 138 kV (10 projects) and 345 kV (5 projects) (why the voltage matters). ET Fuels US Inc. is listed on the most projects here (2 of 15); 14 different companies appear in all. Target online dates for the projects not yet running span Sep 2026 to Apr 2030. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Elbow Creek repower1058 Longshore 345kV · shared with 2 other requests | Elbow Creek Wind Project, LLC | Wind | 0 no capacity change | Mar 2027 | Approved for synchronization |
| Ariji BESSTap 138kV 1394 GTTYVTAP_8 - 1322 BIGSPRIG_8 | Ariji BESS, LLC | Battery storage (stand-alone) | 100.3 | Mar 2029 | Signed; security posted |
| Prospector Energy StorageNatural Dam 138kV Substation (23836) | Prospector Storage LLC | Battery storage (stand-alone) | 204.6 | Sep 2026 date passed; status per ERCOT | In study |
| PRI SolarThe 345 kV Falcon Seaboard (#1025) substation; Oncor | BHER Power Resources, Inc. | Solar | 63.8 | Jan 2027 | In study |
| Luthor SolarTap 138kV 23831 Luther Station – 10032 Little Luther | TREX US Luthor LLC | Solar | 101.0 | Sep 2027 | In study |
| Bhalu StorageTap 138kV Bulldog (#23833) – Elbow (#23834) | Bhalu Storage, LLC | Battery storage (stand-alone) | 205.5 | Apr 2028 | In study |
| Les Energy StorageTap 138 kV 1326 Stanton East – 11324 Leatherwood Pod | Rocky Mountain Energy Development, LLC | Battery storage (stand-alone) | 205.1 | Apr 2028 | In study |
| Crater BESSTap 345 kV Rockhound Switch (10062) – Prong Moss Switch (10057) ckt 1 | BRP Crater BESS LLC | Battery storage (stand-alone) | 310.3 | May 2029 | In study |
| Odessa Energy Storage1058 LONGSHORE 345kV · shared with 2 other requests | Odessa Energy Storage LLC, | Battery storage (stand-alone) | 202.8 | May 2029 | In study |
| Prairie Blossom StorageTap 138kV #1322 Big Spring Switch – #1366 Big Spring CRMWD | Prairie Blossom Storage, LLC | Battery storage (stand-alone) | 122.5 | May 2029 | In study |
| Rattlesnake Gap Solar SLF10119 Tributary Switch 138 kV · shared with 2 other requests | ET Fuels US Inc. | Solar | 0 no capacity change | Jun 2029 | In study |
| Rattlesnake Gap Storage SLF10119 Tributary Switch 138 kV · shared with 2 other requests | ET Fuels US Inc. | Battery storage (paired with solar) | Self-limiting | Jun 2029 | In study |
| Rattlesnake Gap Wind SLF10119 Tributary Switch 138 kV · shared with 2 other requests | ET Fuels US Inc. | Wind | 200.0 | Jun 2029 | In study |
| Silver Hills Windpower10066 Prong Moss Switch 138kV | Silver Hills Windpower, LLC | Wind | 54.0 | Jun 2029 | In study |
| Midland Energy StorageTap 345kV 10057 Prong Moss Switch - 10062 Rockhound Switch CKT 1 | Midland Energy Storage LLC | Battery storage (stand-alone) | 204.7 | Jun 2029 | In study |
| Infinium Solar#1058 Longshore Switch - #18548 Prairieland Switch 345kV Ckt 1 | Jackalope Flats Solar, LLC | Solar | 401.6 | Jul 2029 | In study |
| Calf Creek StorageBuffalo 138 kV Substation #23837 | Coyote Ridge Storage, LLC | Battery storage (stand-alone) | 103.3 | Apr 2030 | In study |
Crowded connection points in Howard County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Rockhound (10062) 345 kV 2 requests · 515 MW2 in study
- Crater BESS 22INR0347 · Battery storage · 310 MW · In study
- Midland Energy Storage 25INR0629 · Battery storage · 205 MW · In study
Prong Moss (10057) 345 kV 5 requests · 3,406 MW · 2 in Howard County, 3 in Mitchell5 in study
- Zeus Mitchell BESS 25INR0589 · Battery storage · 1,043 MW · In study · Mitchell
- Zeus Mitchell BESS II 26INR0686 · Battery storage · 1,043 MW · In study · Mitchell
- Zeus Mitchell Solar 25INR0588 · Solar · 805 MW · In study · Mitchell
- Crater BESS 22INR0347 · Battery storage · 310 MW · In study
- Midland Energy Storage 25INR0629 · Battery storage · 205 MW · In study
BIGSPRIG_8 (1322) 138 kV 2 requests · 223 MW1 signed; security posted, 1 in study
- Ariji BESS 25INR0143 · Battery storage · 100 MW · Signed; security posted
- Prairie Blossom Storage 27INR0323 · Battery storage · 122 MW · In study
Longshore (1058) 345 kV 8 requests · 1,351 MW · 2 in Howard County, 5 in Glasscock, Mitchell3 approved for synchronization, 3 in study, 2 signed; security posted
- Panther Creek 1 Repower 24INR0578 · Wind · 11 MW · Approved for synchronization · Glasscock
- Panther Creek 2 Repower 24INR0582 · Wind · 8 MW · Approved for synchronization · Glasscock
- Elbow Creek repower 19INR0174 · Wind · 0 MW · Approved for synchronization
- Gusty Windpower 29INR0040 · Wind · 249 MW · Signed; security posted · Glasscock
- Hackberry Creek Solar 25INR0430 · Solar · 176 MW · Signed; security posted · Mitchell
- Infinium Solar 29INR0019 · Solar · 402 MW · In study
- Prairie Power Wind 28INR0307 · Wind · 303 MW · In study · Mitchell
- Odessa Energy Storage 25INR0611 · Battery storage · 203 MW · In study
Tributary (10119) 138 kV 3 requests · 200 MW3 in study
- Rattlesnake Gap Wind SLF 29INR0177 · Wind · 200 MW · In study
- Rattlesnake Gap Solar SLF 29INR0178 · Solar · 0 MW · In study
- Rattlesnake Gap Storage SLF 29INR0179 · Battery storage · 0 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Howard County
- Howard County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 7, Midland: 10 Desta Dr, Ste 350E, Midland TX 79705-4530, 432-570-1359; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Howard County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Howard County.
Permits and reviews for Howard County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Howard County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Howard County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.
How a project in Howard County connects to the grid
Howard County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Howard County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Howard County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 7
Andrews · Borden · Crane · Dawson · Ector · Gaines · Glasscock · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Ward · Winkler