Scurry County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
16 proposed energy projects from ERCOT's September 2026 report, plus who to call in Scurry County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.
Check land in Scurry CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Scurry County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Scurry County?
ERCOT's September 2026 interconnection report lists 16 proposed energy projects in Scurry County (7 solar, 1 wind and 8 battery storage), about 5,035 MW in all. 4 of the 16 have a signed interconnection agreement, and 2 have been approved for energization or synchronization. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.
What stands out in Scurry County
By capacity, solar leads in Scurry County with 2,870 MW across 7 projects, followed by battery storage (8 projects, 1,923 MW) and wind (1 project, 243 MW). The largest single project is Spectra Solar, a 1,200 MW solar project listed under SE DC Devco, with its agreement signed and security posted, and its target online date is Nov 2028. Of the 16, 12 are still in ERCOT's study process, 2 have posted security or started construction and 2 are approved for energization or synchronization. Connection points are mostly at 345 kV (11 projects) and 138 kV (2 projects) (why the voltage matters). Cedar Draw Solar LLC and Fluvanna Max Solar LLC are each listed on 2 projects; 14 different companies appear in all. Target online dates for the projects not yet running span Sep 2027 to Oct 2029. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Brazos Wind Repower1064 Sun 138kV | BRAZOS WIND VENTURES, LLC | Wind | 22.4 | Nov 2025 | Approved for synchronization |
| Coyote Wind11305 Dermott 345kV | Coyote Wind | Wind | 242.6 | Aug 2026 | Approved for synchronization |
| Knapp BESSStation Name: KNAPP | Knapp ESS Assets, LLC | Battery storage (stand-alone) | 9.9 | Oct 2026 | Approved for synchronization |
| Maldives SolarGalvani 345 kV station (Bus #59912) | Maldives Solar LLC | Solar | 181.3 | Sep 2028 | Signed; security posted |
| Spectra Solar59912 Galvani 345KV | SE DC Devco | Solar | 1,200.0 | Nov 2028 | Signed; security posted |
| Helion BESS59912 GALVANI 345 · shared with 1 other request | Helion BESS | Battery storage (paired with solar) | 100.0 | Sep 2027 | In study |
| Helion Solar59912 GALVANI 345 · shared with 1 other request | Helion Solar LLC | Solar | 100.0 | Oct 2027 | In study |
| Cedar Draw BESS60011 Nebula7A 345kV · shared with 1 other request | Cedar Draw Solar LLC | Battery storage (paired with solar) | 225.7 | Dec 2027 | In study |
| Cedar Draw Solar60011 Nebula7A 345kV · shared with 1 other request | Cedar Draw Solar LLC | Solar | 451.4 | Dec 2027 | In study |
| Roost Energy Storagethe Knapp Sub (bus# 1310) – Union Switch (bus# 18555) | Bluff Creek Energy Storage LLC | Battery storage (stand-alone) | 102.4 | Sep 2028 | In study |
| Zeus Scurry BESSMHOS 345 kV Substation (#59911) · shared with 1 other request | Zeus Scurry BESS | Battery storage (paired with solar) | 1,043.1 | Oct 2028 | In study |
| Zeus Scurry SolarMHOS 345 kV Substation (#59911) · shared with 1 other request | Scurry Solar, LLC | Solar | 503.5 | Oct 2028 | In study |
| Inadale BESSTap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2 · shared with 1 other request | Inadale BESS, LLC | Battery storage (paired with solar) | 287.2 | Mar 2029 | In study |
| Inadale SolarTap 345 kV TONKAWAW_5 (11048) – SCURCNTYS_5 (11318) Circuit #2 · shared with 1 other request | Inadale Solar, LLC | Solar | 281.0 | Mar 2029 | In study |
| Fluvanna Max BESS SLF11305 DERMOTT 345 kV · shared with 1 other request | Fluvanna Max Solar LLC | Battery storage (paired with solar) | 51.8 | Sep 2029 | In study |
| Fluvanna Max Solar SLF11305 DERMOTT 345 kV · shared with 1 other request | Fluvanna Max Solar LLC | Solar | 152.7 | Sep 2029 | In study |
| Hide Town Energy Storage18555 Union Switch 138 kV | Hide Town Energy Storage LLC | Battery storage (stand-alone) | 102.8 | Oct 2029 | In study |
Crowded connection points in Scurry County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Galvani (59912) 345 kV 4 requests · 1,581 MW2 signed; security posted, 2 in study
- Spectra Solar 28INR0486 · Solar · 1,200 MW · Signed; security posted
- Maldives Solar 25INR0400 · Solar · 181 MW · Signed; security posted
- Helion Solar 27INR0623 · Solar · 100 MW · In study
- Helion BESS 27INR0624 · Battery storage · 100 MW · In study
Dermott (11305) 345 kV 5 requests · 941 MW · 3 in Scurry County, 2 in Kent, Fisher4 in study, 1 approved for synchronization
- Coyote Wind 17INR0027b · Wind · 243 MW · Approved for synchronization
- Rugged Prairie Wind 29INR0399 · Wind · 294 MW · In study · Fisher
- TEXAS SOLAR NOVA 3 22INR0215 · Solar · 200 MW · In study · Kent
- Fluvanna Max Solar SLF 29INR0077 · Solar · 153 MW · In study
- Fluvanna Max BESS SLF 28INR0202 · Battery storage · 52 MW · In study
Union (18555) 138 kV 2 requests · 205 MW2 in study
- Hide Town Energy Storage 25INR0287 · Battery storage · 103 MW · In study
- Roost Energy Storage 24INR0519 · Battery storage · 102 MW · In study
Bus 11048 (11048) 345 kV 2 requests · 568 MW2 in study
- Inadale BESS 25INR0197 · Battery storage · 287 MW · In study
- Inadale Solar 25INR0196 · Solar · 281 MW · In study
Bus 11318 (11318) 345 kV 2 requests · 568 MW2 in study
- Inadale BESS 25INR0197 · Battery storage · 287 MW · In study
- Inadale Solar 25INR0196 · Solar · 281 MW · In study
NEBULA7A (60011) 345 kV 2 requests · 677 MW2 in study
- Cedar Draw Solar 27INR0192 · Solar · 451 MW · In study
- Cedar Draw BESS 27INR0193 · Battery storage · 226 MW · In study
Mhos (59911) 345 kV 5 requests · 2,143 MW · 2 in Scurry County, 3 in Kent5 in study
- Zeus Scurry BESS 27INR0535 · Battery storage · 1,043 MW · In study
- Zeus Scurry Solar 27INR0529 · Solar · 504 MW · In study
- Buzzer Butte Solar 29INR0394 · Solar · 243 MW · In study · Kent
- Buzzer Butte 2 Solar 30INR0164 · Solar · 243 MW · In study · Kent
- Carpet Tech Solar One 28INR0301 · Solar · 111 MW · In study · Kent
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Scurry County
- Scurry County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Scurry County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Scurry County.
Permits and reviews for Scurry County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Scurry County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Scurry County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.
How a project in Scurry County connects to the grid
Scurry County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Scurry County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Scurry County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 3
Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young