Archer County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
6 proposed energy projects from ERCOT's September 2026 report, plus who to call in Archer County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.
Check land in Archer CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Archer County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Archer County?
ERCOT's September 2026 interconnection report lists 6 proposed energy projects in Archer County (1 solar and 5 battery storage), about 808 MW in all. 1 of the 6 has a signed interconnection agreement. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.
What stands out in Archer County
By capacity, battery storage leads in Archer County with 500 MW across 5 projects, followed by solar (1 project, 309 MW); 2 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is Red Hollow Renewable Energy Solar SLF, a 309 MW solar project listed under Red Hollow Renewable Energy LLC, still in study, and its target online date is Apr 2029. Of the 6, 5 are still in ERCOT's study process and 1 has a signed interconnection agreement but no security posted yet. Connection points are mostly at 345 kV (4 projects) and 138 kV (2 projects) (why the voltage matters). Red Hollow Renewable Energy LLC is listed on the most projects here (2 of 6); 5 different companies appear in all. Target online dates for the projects not yet running span Apr 2027 to Apr 2029. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Bobcat Bluff Storage SLF1475 Windthorst 138 kV | Cub Storage LLC | Battery storage (paired with wind) | Self-limiting | Apr 2027 | Signed Jan 2026 |
| Shannon Wind Repower1458 Cobb Switching Station 345 kV · shared with 1 other request | Shannon Wind, LLC | Wind | 18.5 | Sep 2027 | In study |
| Trinity Hills BESS SLFTo the 345 kV Garvey Road Switch (#17002) | Phoenix Battery Storage, LLC | Battery storage (paired with wind) | 94.0 | Jan 2028 | In study |
| Wichita Falls Energy StorageTap 345kV 1422 Bowman - 1458 Cobb Switch | Wichita Falls Energy Storage LLC | Battery storage (stand-alone) | 202.0 | Aug 2028 | In study |
| Ringtail Energy StorageBus # 1446, Lake Wichita, 138 kV | PowerPulse LLC | Battery storage (stand-alone) | 203.8 | Dec 2028 | In study |
| Red Hollow Renewable Energy BESS SLFTap 345kV 1422 Bowman - 17002 Garvey Road | Red Hollow Renewable Energy LLC | Battery storage (paired with solar) | Self-limiting | Apr 2029 | In study |
| Red Hollow Renewable Energy Solar SLFTap 345kV (Bus# 1422) Bowman - (Bus# 17002) Garvey Road | Red Hollow Renewable Energy LLC | Solar | 308.6 | Apr 2029 | In study |
Crowded connection points in Archer County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Bowman (1422) 345 kV 4 requests · 949 MW · 3 in Archer County, 1 in Wilbarger4 in study
- Poco Trail Solar 23INR0273 · Solar · 439 MW · In study · Wilbarger
- Red Hollow Renewable Energy Solar SLF 28INR0088 · Solar · 309 MW · In study
- Wichita Falls Energy Storage 25INR0628 · Battery storage · 202 MW · In study
- Red Hollow Renewable Energy BESS SLF 27INR0279 · Battery storage · 0 MW · In study
Garvey Road (17002) 345 kV 6 requests · 1,014 MW · 3 in Archer County, 3 in Young5 in study, 1 approved for synchronization
- Trinity Hills Wind repower 20INR0019 · Wind · -27 MW · Approved for synchronization · Young
- Sweetheart BESS 29INR0172 · Battery storage · 310 MW · In study · Young
- Red Hollow Renewable Energy Solar SLF 28INR0088 · Solar · 309 MW · In study
- Sweetheart Solar 29INR0171 · Solar · 301 MW · In study · Young
- Trinity Hills BESS SLF 26INR0295 · Battery storage · 94 MW · In study
- Red Hollow Renewable Energy BESS SLF 27INR0279 · Battery storage · 0 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Archer County
- Archer County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Archer County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Archer County.
Permits and reviews for Archer County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Archer County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Archer County connects to the grid
Archer County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Archer County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Archer County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 3
Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young