Comanche County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects8
Total capacity2,446MW
Signed agreements4of 8
New since August0requests

8 proposed energy projects from ERCOT's September 2026 report, plus who to call in Comanche County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.

Check land in Comanche CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Comanche County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Comanche County?

ERCOT's September 2026 interconnection report lists 8 proposed energy projects in Comanche County (3 solar and 5 battery storage), about 2,446 MW in all. 4 of the 8 have a signed interconnection agreement.

What stands out in Comanche County

By capacity, battery storage leads in Comanche County with 1,781 MW across 5 projects, followed by solar (3 projects, 665 MW). The largest single project is Comanche BESS, a 614 MW stand-alone battery storage project listed under ENERGOS BESS, with an interconnection agreement signed in Mar 2026, and its target online date is May 2029. Of the 8, 4 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 3 have posted security or started construction. Connection points are mostly at 345 kV (6 projects), 69 kV (1 project) and 138 kV (1 project) (why the voltage matters). Mustang Creek Solar, LLC is listed on the most projects here (2 of 8); 7 different companies appear in all. Target online dates for the projects not yet running span Sep 2027 to Mar 2030. All of them fall in ERCOT's North load zone. 2 that were listed in August have since dropped off.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Darkwood SolarTap 345KV 1900 Comanche Peak to 1440 Comanche SSMustang Creek Solar, LLCSolar152.0Sep 2027Signed; security posted
Lamkin Solartap 69kV 258 Hamilton - 273 GustineCommanche Solar, LLCSolar101.5Nov 2027Signed; security posted
Darkwood BESSTap 345KV 1900 Comanche Peak - 1440 Comanche SwitchMustang Creek Solar, LLCBattery storage (paired with solar)150.5Jul 2028Signed; security posted
Comanche BESS#1440 Comanche Switching Station 345kVENERGOS BESSBattery storage (stand-alone)614.4May 2029Signed Mar 2026
Dragan Solar1440 Comanche 345kV · shared with 1 other requestHecate Comanche Solar LLCSolar411.0Sep 2027In study
Crios BESSTap 138 kV 1649 HASSE_P8 - 1684 SABANA_8BRP Crios BESS LLCBattery storage (stand-alone)205.5Mar 2028In study
Merope BESS345 kV Corn Trail Switch Substation (#11441)BRP Merope BESS LLCBattery storage (stand-alone)402.4Mar 2028In study
Dragan Storage1440 Comanche 345kV · shared with 1 other requestHecate Grid Dragan Storage LLCBattery storage (paired with solar)408.3Mar 2030In study

No longer listed since August

These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.

  • Saddle Horn Station BESS SLF, battery storage, 177 MW (Saddle Horn Station BESS LLC)
  • Saddle Horn Station Solar SLF, solar, 175 MW (Saddle Horn Station LLC)

Crowded connection points in Comanche County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Comanche (1440) 345 kV 6 requests · 2,043 MW · 5 in Comanche County, 1 in Erath2 in study, 2 signed, 2 signed; security posted
  • Darkwood Solar 27INR0049 · Solar · 152 MW · Signed; security posted
  • Darkwood BESS 27INR0050 · Battery storage · 150 MW · Signed; security posted
  • Comanche BESS 27INR0365 · Battery storage · 614 MW · Signed Mar 2026
  • McCrae Energy Storage 25INR0661 · Battery storage · 306 MW · Signed Dec 2025 · Erath
  • Dragan Solar 22INR0237 · Solar · 411 MW · In study
  • Dragan Storage 22INR0400 · Battery storage · 408 MW · In study
Comanche Peak (1900) 345 kV 5 requests · 1,382 MW · 2 in Comanche County, 3 in Somervell, Parker, Erath3 signed; security posted, 1 in study, 1 signed
  • Yellow Viking Solar 21INR0520 · Solar · 171 MW · Signed; security posted · Somervell
  • Darkwood Solar 27INR0049 · Solar · 152 MW · Signed; security posted
  • Darkwood BESS 27INR0050 · Battery storage · 150 MW · Signed; security posted
  • McCrae Energy Storage 25INR0661 · Battery storage · 306 MW · Signed Dec 2025 · Erath
  • Rocking X Solar 23INR0368 · Solar · 602 MW · In study · Parker

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Comanche County

  • Comanche County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Comanche County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Comanche County.

Permits and reviews for Comanche County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Comanche County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Comanche County connects to the grid

Comanche County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Comanche County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Comanche County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.