Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › ERCOT Queue Brief

The ERCOT Queue Brief

Once a month, when ERCOT publishes its Generator Interconnection Status report, this brief lists what changed: every new request, every withdrawal, every stage change, the points of interconnection that are filling up, the schedules that slipped, and the rules and dates that moved, each linked to the document. It is the county pages on this site, compressed into the twenty minutes a developer has for it.

Issues

Subscribing

Each issue is free on the web. A paid tier (the issue by email with the PDF and the county tables as a spreadsheet) is being set up; until it opens, the email edition is free too.

What the brief is not. It names projects, developers, and points of interconnection exactly as ERCOT lists them and reports changes between two public files. It does not rate projects, recommend companies, or carry anything that is not in a public document; the operator of this site works in the industry and keeps it that way on purpose (independence).

Browse resources