Wichita County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
12 proposed energy projects from ERCOT's September 2026 report, plus who to call in Wichita County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.
Check land in Wichita CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Wichita County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Wichita County?
ERCOT's September 2026 interconnection report lists 12 proposed energy projects in Wichita County (3 solar and 9 battery storage), about 2,448 MW in all. 4 of the 12 have a signed interconnection agreement.
What stands out in Wichita County
By capacity, battery storage leads in Wichita County with 1,696 MW across 9 projects, followed by solar (3 projects, 752 MW). The largest single project is Short Creek Solar, a 628 MW solar project listed under Wichita Solar I, LLC, with its agreement signed and security posted, and its target online date is Dec 2027. Of the 12, 8 are still in ERCOT's study process and 4 have posted security or started construction. Connection points are mostly at 345 kV (8 projects) and 138 kV (4 projects) (why the voltage matters). Nymphaea Solar, LLC, Wichita Solar I, LLC and Wichita Solar II, LLC are each listed on 2 projects; 9 different companies appear in all. Target online dates for the projects not yet running span Dec 2027 to May 2030. All of them fall in ERCOT's West load zone. 1 that was listed in August has since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Short Creek SolarTap 345kV 6101 Riley - 1425 Fisher Road Switch Ckt 1 · shared with 1 other request | Wichita Solar I, LLC | Solar | 627.8 | Dec 2027 | Signed; security posted |
| Nymphaea SolarTap 345kV 1730 Krum West Swtich - 6111 Riley7B · shared with 1 other request | Nymphaea Solar, LLC | Solar | 120.9 | Jul 2028 | Signed; security posted |
| Nymphaea StorageTap 345kV 1730 Krum West Swtich - 6111 Riley7B · shared with 1 other request | Nymphaea Solar, LLC | Battery storage (paired with solar) | 61.0 | Jul 2028 | Signed; security posted |
| Short Creek BESSTap 345kV 6101 Riley - 1425 Fisher Road Switch Ckt 1 · shared with 1 other request | Wichita Solar I, LLC | Battery storage (paired with solar) | 155.7 | Jul 2028 | Signed; security posted |
| Bologna BESSTap 138kV #1450 Pleasant Valley Switch - #1492 Wichita Falls Riverbend | MALONEY BESS LLC | Battery storage (stand-alone) | 202.6 | Apr 2028 | In study |
| Pethrus BESSTap Wichita Falls Switch (#1464) – North Star (#1467) 138 kV Line | Pethrus BESS, LLC | Battery storage (stand-alone) | 174.1 | Mar 2029 | In study |
| Wichita County Mawson StorageTap 345kV Fisher Road Switch (#1425) – Riley (#6101) Line | DM-WCM, LLC | Battery storage (stand-alone) | 153.6 | Apr 2029 | In study |
| Rio Star Energy StorageTap 1464 Wichita Falls South Switch – 1474 Scotland 138 kV | Rio Star Energy Storage, LLC | Battery storage (stand-alone) | 142.6 | Apr 2029 | In study |
| Copperleaf Energy StorageTap 345kV Fisher Road Switch (#1425) – Riley (#6101) | Copperleaf Energy Storage, LLC | Battery storage (stand-alone) | 305.6 | Sep 2029 | In study |
| Wichita Creek SolarTap 345 kV 6111 RILEY - 1730 KRUM WEST Ckt 1 · shared with 1 other request | Wichita Solar II, LLC | Solar | 3.4 | Apr 2030 | In study |
| Wichita Creek StorageTap 345 kV 6111 RILEY - 1730 KRUM WEST Ckt 1 · shared with 1 other request | Wichita Solar II, LLC | Battery storage (paired with solar) | 300.0 | Apr 2030 | In study |
| Spinosa BESSTap 138 kV Wichita Falls Cogen (#1498) – Pleasant Valley Switch (#1... | Spinosa Energy Center, LLC | Battery storage (stand-alone) | 201.2 | May 2030 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- Signal Hill BESS I, battery storage, 123 MW (Signal Hill Generating LLC)
Crowded connection points in Wichita County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
RILEY7A (6101) 345 kV 22 requests · 9,936 MW · 4 in Wichita County, 18 in Wilbarger, Foard, Baylor12 in study, 9 signed; security posted, 1 signed
- Limitless Energy Hub II 27INR0582 · Gas combined cycle · 1,238 MW · Signed; security posted · Wilbarger
- Short Creek Solar 24INR0201 · Solar · 628 MW · Signed; security posted
- Dundee East A Wind 27INR0005 · Wind · 524 MW · Signed; security posted · Baylor
- Dundee East B Wind 27INR0011 · Wind · 261 MW · Signed; security posted · Baylor
- Felix North Solar 22INR0209 · Solar · 201 MW · Signed; security posted · Wilbarger
- Felix West Solar 27INR0012 · Solar · 201 MW · Signed; security posted · Wilbarger
- Felix East Solar 27INR0007 · Solar · 201 MW · Signed; security posted · Wilbarger
- Short Creek BESS 27INR0029 · Battery storage · 156 MW · Signed; security posted
- Dundee West Wind 27INR0004 · Wind · 146 MW · Signed; security posted · Wilbarger
- Limitless Energy Hub I 27INR0581 · Gas combined cycle · 1,238 MW · Signed Dec 2025 · Wilbarger
- H&C WILBARGER POWER I 32INR0006 · Gas combined cycle · 1,026 MW · In study · Wilbarger
- H&C WILBARGER POWER II 32INR0008 · Gas combined cycle · 1,026 MW · In study · Wilbarger
- TEXPO 22INR0497 · Gas steam turbine · 680 MW · In study · Wilbarger
- Big Field Solar 29INR0148 · Solar · 506 MW · In study · Foard
- Poco Trail Solar 23INR0273 · Solar · 439 MW · In study · Wilbarger
- Copperleaf Energy Storage 28INR0118 · Battery storage · 306 MW · In study
- Pease River Solar 28INR0476 · Solar · 276 MW · In study · Foard
- Grayback Solar 28INR0464 · Solar · 222 MW · In study · Wilbarger
- Supra Wind 27INR0063 · Wind · 206 MW · In study · Hardeman
- Daisy Solar 28INR0535 · Solar · 201 MW · In study · Foard
- Wichita County Mawson Storage 26INR0613 · Battery storage · 154 MW · In study
- Felix Storage 27INR0009 · Battery storage · 101 MW · In study · Wilbarger
Fisher Road (1425) 345 kV 4 requests · 1,243 MW2 signed; security posted, 2 in study
- Short Creek Solar 24INR0201 · Solar · 628 MW · Signed; security posted
- Short Creek BESS 27INR0029 · Battery storage · 156 MW · Signed; security posted
- Copperleaf Energy Storage 28INR0118 · Battery storage · 306 MW · In study
- Wichita County Mawson Storage 26INR0613 · Battery storage · 154 MW · In study
Krum West (1730) 345 kV 13 requests · 3,688 MW · 4 in Wichita County, 9 in Clay, Montague, Cooke7 in study, 4 signed; security posted, 1 approved for synchronization, 1 signed
- WILDWIND 20INR0033 · Wind · 180 MW · Approved for synchronization · Cooke
- Soleil Solar 25INR0097 · Solar · 452 MW · Signed; security posted · Clay
- Adamstown Solar 21INR0210 · Solar · 251 MW · Signed; security posted · Wilbarger
- Nymphaea Solar 25INR0154 · Solar · 121 MW · Signed; security posted
- Nymphaea Storage 25INR0155 · Battery storage · 61 MW · Signed; security posted
- Fortuna Wind 22INR0301 · Wind · 295 MW · Signed Aug 2024 · Jack
- Hiru Solar 23INR0228 · Solar · 604 MW · In study · Clay
- Hiru Storage 24INR0444 · Battery storage · 504 MW · In study · Clay
- Prairie Branch BESS 28INR0423 · Battery storage · 310 MW · In study · Montague
- Gilleys Energy Storage 25INR0656 · Battery storage · 306 MW · In study · Wise
- Prairie Branch Solar 28INR0422 · Solar · 301 MW · In study · Montague
- Wichita Creek Storage 28INR0378 · Battery storage · 300 MW · In study
- Wichita Creek Solar 28INR0377 · Solar · 3 MW · In study
Riley (6111) 345 kV 15 requests · 4,272 MW · 4 in Wichita County, 11 in Wilbarger, Clay, Montague11 in study, 4 signed; security posted
- Soleil Solar 25INR0097 · Solar · 452 MW · Signed; security posted · Clay
- Adamstown Solar 21INR0210 · Solar · 251 MW · Signed; security posted · Wilbarger
- Nymphaea Solar 25INR0154 · Solar · 121 MW · Signed; security posted
- Nymphaea Storage 25INR0155 · Battery storage · 61 MW · Signed; security posted
- Hiru Solar 23INR0228 · Solar · 604 MW · In study · Clay
- Reunion Solar 28INR0332 · Solar · 601 MW · In study · Wilbarger
- Hiru Storage 24INR0444 · Battery storage · 504 MW · In study · Clay
- Prairie Branch BESS 28INR0423 · Battery storage · 310 MW · In study · Montague
- Gilleys Energy Storage 25INR0656 · Battery storage · 306 MW · In study · Wise
- Prairie Branch Solar 28INR0422 · Solar · 301 MW · In study · Montague
- Wichita Creek Storage 28INR0378 · Battery storage · 300 MW · In study
- Reunion Storage 28INR0333 · Battery storage · 200 MW · In study · Wilbarger
- White Wing Storage 27INR0333 · Battery storage · 130 MW · In study · Wilbarger
- White Wing Solar 27INR0332 · Solar · 127 MW · In study · Wilbarger
- Wichita Creek Solar 28INR0377 · Solar · 3 MW · In study
Wichita Falls (1464) 138 kV 2 requests · 317 MW2 in study
- Pethrus BESS 26INR0280 · Battery storage · 174 MW · In study
- Rio Star Energy Storage 28INR0221 · Battery storage · 143 MW · In study
Pleasant Valley (1450) 138 kV 2 requests · 404 MW2 in study
- Bologna BESS 26INR0472 · Battery storage · 203 MW · In study
- Spinosa BESS 27INR0412 · Battery storage · 201 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Wichita County
- Wichita County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Wichita County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Wichita County.
Permits and reviews for Wichita County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Wichita County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Wichita County connects to the grid
Wichita County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Wichita County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Wichita County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 3
Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Kent · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wilbarger · Young