Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
5 proposed energy projects from ERCOT's September 2026 report, plus who to call in Sterling County and in TCEQ Region 8 before signing a solar, wind, or battery storage lease.
Check land in Sterling CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Sterling County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Sterling County?
ERCOT's September 2026 interconnection report lists 5 proposed energy projects in Sterling County (2 solar, 1 wind and 2 battery storage), about 953 MW in all. 1 of the 5 has a signed interconnection agreement. The table also lists 2 changes to existing plants (repowers or capacity changes), not counted above.
What stands out in Sterling County
By capacity, solar leads in Sterling County with 412 MW across 2 projects, followed by battery storage (2 projects, 302 MW) and wind (1 project, 239 MW). The largest single project is Bob Creek Wind, a 239 MW wind project listed under NextEra Energy Interconnection Holdings, LLC, with its agreement signed and security posted, and its target online date is Jul 2028. Of the 5, 4 are still in ERCOT's study process and 1 has posted security or started construction. Every listed connection point is on the 345 kV system (why the voltage matters). Clearway Energy Group LLC and Roan Solar, LLC are each listed on 2 projects; 3 different companies appear in all. Target online dates for the projects not yet running span Jun 2028 to Dec 2029. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Capricorn I & III repower180757 Capricorn Ridge 3 138kV | Nextera | Wind | 32.0 | Jun 2026 | Approved for synchronization |
| Goat Mountain Wind-Repower76030 Gasconades Creek 345kV | Goat Wind LLC | Wind | 303.2 | Mar 2027 | Signed; security posted |
| Bob Creek Wind59902 Sand Bluff 345kV · shared with 2 other requests | NextEra Energy Interconnection Holdings, LLC | Wind | 239.5 | Jul 2028 | Signed; security posted |
| Goat Mountain BESS76030-Gasconades Creek 345 kV · shared with 1 other request | Clearway Energy Group LLC | Battery storage (paired with wind) | 201.1 | Jun 2028 | In study |
| Goat Mountain BESS 276030-Gasconades Creek 345 kV · shared with 1 other request | Clearway Energy Group LLC | Battery storage (paired with wind) | 100.7 | Jun 2028 | In study |
| Roan Solar Phase 1Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV · shared with 1 other request | Roan Solar, LLC | Solar | 205.9 | Apr 2029 | In study |
| Roan Solar Phase 2Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV · shared with 1 other request | Roan Solar, LLC | Solar | 205.9 | Dec 2029 | In study |
Crowded connection points in Sterling County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Sand Bluff (59902) 345 kV 10 requests · 2,197 MW · 3 in Sterling County, 7 in Glasscock5 signed; security posted, 4 in study, 1 approved for synchronization
- Honey Mesquite Wind Farm 26INR0447 · Wind · 174 MW · Approved for synchronization · Glasscock
- Gardner Draw Solar 27INR0355 · Solar · 310 MW · Signed; security posted · Glasscock
- Windjammer Windpower 27INR0383 · Wind · 244 MW · Signed; security posted · Glasscock
- Bob Creek Wind 27INR0076 · Wind · 239 MW · Signed; security posted
- Cannibal Draw Solar 26INR0452 · Solar · 150 MW · Signed; security posted · Glasscock
- Cannibal Draw Storage 26INR0453 · Battery storage · 99 MW · Signed; security posted · Glasscock
- Indigo Quill Gas 30INR0080 · Gas turbine · 370 MW · In study · Glasscock
- Roan Solar Phase 1 29INR0185 · Solar · 206 MW · In study
- Roan Solar Phase 2 29INR0187 · Solar · 206 MW · In study
- Feather Dalea BESS 27INR0371 · Battery storage · 200 MW · In study · Glasscock
Gasconades Creek (76030) 345 kV 7 requests · 2,798 MW · 2 in Sterling County, 4 in Mitchell6 in study, 1 signed; security posted
- Goat Mountain Wind-Repower 27INR0367 · Wind · 303 MW · Signed; security posted
- Zeus Spade Wind 26INR0386 · Wind · 987 MW · In study · Mitchell
- Rosenix Solar 29INR0212 · Solar · 502 MW · In study · Mitchell
- Zeus Spade BESS 26INR0387 · Battery storage · 446 MW · In study · Mitchell
- Rosenix Storage 29INR0213 · Battery storage · 258 MW · In study · Mitchell
- Goat Mountain BESS 26INR0589 · Battery storage · 201 MW · In study
- Goat Mountain BESS 2 26INR0611 · Battery storage · 101 MW · In study
Divide (76090) 345 kV 7 requests · 1,866 MW · 2 in Sterling County, 5 in Tom Green, Coke6 in study, 1 signed; security posted
- Water Valley Wind Energy 20INR0247 · Wind · 180 MW · Signed; security posted · Tom Green
- Moon Chapel Solar 29INR0328 · Solar · 402 MW · In study · Tom Green
- Moon Chapel Wind 27INR0445 · Wind · 379 MW · In study · Tom Green
- Roboman Solar 27INR0453 · Solar · 273 MW · In study · Coke
- Coke BESS 28INR0155 · Battery storage · 220 MW · In study · Coke
- Roan Solar Phase 1 29INR0185 · Solar · 206 MW · In study
- Roan Solar Phase 2 29INR0187 · Solar · 206 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Sterling County
- Sterling County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 8, San Angelo: 622 S Oakes, Ste K, San Angelo TX 76903-7035, 325-655-9479; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Sterling County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Sterling County.
Permits and reviews for Sterling County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Sterling County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Sterling County connects to the grid
Sterling County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Sterling County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Sterling County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 8
Coke · Concho · Crockett · Irion · Kimble · Mason · McCulloch · Menard · Reagan · Schleicher · Sutton · Tom Green