Home › Texas › Kent County

Kent County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects7
Total capacity1,629MW
Signed agreements1of 7
New since August2requests

7 proposed energy projects from ERCOT's September 2026 report, plus who to call in Kent County and in TCEQ Region 3 before signing a solar, wind, or battery storage lease.

Check land in Kent CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Kent County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Kent County?

ERCOT's September 2026 interconnection report lists 7 proposed energy projects in Kent County (6 solar and 1 battery storage), about 1,629 MW in all. 1 of the 7 has a signed interconnection agreement. 2 are new since August.

What stands out in Kent County

By capacity, solar leads in Kent County with 1,370 MW across 6 projects, followed by battery storage (1 project, 259 MW). The largest single project is Spurland Solar III, a 322 MW solar project listed under Spurland Solar III, LLC, still in study, and its target online date is Dec 2029. Of the 7, 6 are still in ERCOT's study process and 1 has posted security or started construction. Every listed connection point is on the 345 kV system (why the voltage matters). Origis Development, LLC is listed on the most projects here (2 of 7); 6 different companies appear in all. Target online dates for the projects not yet running span Jan 2026 to Sep 2030. All of them fall in ERCOT's West load zone. 2 are new since August.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Clairemont Solar 159908 Novaprime 345kV · shared with 1 other requestClairemont Solar LLCSolar251.8Feb 2029Signed; security posted
TEXAS SOLAR NOVA 3tap 345kV 11305 Dermott - 59904 CottonwoodTexas Solar Nova 1, LLCSolar200.2Jan 2026 date passed; status per ERCOTIn study
Jay Flat BESS59908 Novaprime 345kV · shared with 1 other requestJay Flat BESS LLCBattery storage (stand-alone)259.4Feb 2029In study
Carpet Tech Solar One#59911 MHOS 345 kVCT Solar OneSolar110.7Jun 2029In study
Spurland Solar IIINova Prime SubstationSpurland Solar III, LLCSolar321.9Dec 2029In study
Buzzer Butte 2 Solar NewTap 345 kV Nova prime (BUS# 59908) to Mhos (BUS# 59911) · shared with 1 other requestOrigis Development, LLCSolar242.8Sep 2030In study
Buzzer Butte Solar NewTap 345 kV Nova prime (BUS# 59908) to Mhos (BUS# 59911) · shared with 1 other requestOrigis Development, LLCSolar242.8Sep 2030In study

Crowded connection points in Kent County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Novaprime (59908) 345 kV 6 requests · 1,500 MW · 4 in Kent County, 2 in Dickens3 in study, 2 signed; security posted, 1 signed
  • Spurland Solar I 29INR0192 · Solar · 302 MW · Signed; security posted · Dickens
  • Clairemont Solar 1 27INR0435 · Solar · 252 MW · Signed; security posted
  • Spurland Solar II 29INR0195 · Solar · 202 MW · Signed Aug 2026 · Dickens
  • Jay Flat BESS 27INR0447 · Battery storage · 259 MW · In study
  • Buzzer Butte Solar 29INR0394 · Solar · 243 MW · In study
  • Buzzer Butte 2 Solar 30INR0164 · Solar · 243 MW · In study
Mhos (59911) 345 kV 5 requests · 2,143 MW · 3 in Kent County, 2 in Scurry5 in study
  • Zeus Scurry BESS 27INR0535 · Battery storage · 1,043 MW · In study · Scurry
  • Zeus Scurry Solar 27INR0529 · Solar · 504 MW · In study · Scurry
  • Buzzer Butte Solar 29INR0394 · Solar · 243 MW · In study
  • Buzzer Butte 2 Solar 30INR0164 · Solar · 243 MW · In study
  • Carpet Tech Solar One 28INR0301 · Solar · 111 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Kent County

  • Kent County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 3, Abilene: 1977 Industrial Blvd, Abilene TX 79602-7833, 325-698-9674; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Kent County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Kent County.

Permits and reviews for Kent County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Kent County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Kent County connects to the grid

Kent County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Kent County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Kent County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 3

Archer · Baylor · Brown · Callahan · Clay · Coleman · Comanche · Cottle · Eastland · Fisher · Foard · Hardeman · Haskell · Jack · Jones · Knox · Mitchell · Montague · Nolan · Runnels · Scurry · Shackelford · Stephens · Stonewall · Taylor · Throckmorton · Wichita · Wilbarger · Young

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.