Proposed projects10
Total capacity3,953MW
Signed agreements0of 10
New since August0requests

10 proposed energy projects from ERCOT's September 2026 report, plus who to call in Wise County and in TCEQ Region 4 before signing a solar, wind, or battery storage lease.

Check land in Wise CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Wise County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Wise County?

ERCOT's September 2026 interconnection report lists 10 proposed energy projects in Wise County (1 solar and 9 battery storage), about 3,953 MW in all. None has a signed interconnection agreement yet. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.

What stands out in Wise County

By capacity, battery storage leads in Wise County with 3,826 MW across 9 projects, followed by solar (1 project, 126 MW). The largest single project is Prairie Point Energy Storage I, a 1,000 MW stand-alone battery storage project listed under Prairie Point LLC, still in study, and its target online date is Dec 2027. Of the 10, 10 are still in ERCOT's study process. Connection points are mostly at 138 kV (4 projects) and 345 kV (4 projects) (why the voltage matters). BT Sandford Solar, LLC and Prairie Point LLC are each listed on 2 projects; 8 different companies appear in all. Target online dates for the projects not yet running span Dec 2027 to Sep 2029. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Wise County Power Repower (CT1, CT2)1421 Willow Creek 345kVWise County Power Company LLCGas combined cycle21.0Dec 2026Signed; security posted
Pianissimo BESS IITap 138kV 685 LEO - 587 GREENWOODPianissimo Storage, LLCBattery storage (stand-alone)202.0Dec 2027In study
Prairie Point Energy Storage IRAMHORNH 5 - 31875 · shared with 1 other requestPrairie Point LLCBattery storage (stand-alone)1,000.0Dec 2027In study
Prairie Point Energy Storage IIRAMHORNH 5 - 31875 · shared with 1 other requestPrairie Point LLCBattery storage (stand-alone)1,000.0Dec 2027In study
Gilleys Energy StorageTap 345 kV 1730 West Krum - 6111 Riley CKT 2Gilleys Energy Storage, LLCBattery storage (stand-alone)306.4Apr 2028In study
Legato BESS138kV #608 Crafton Substation - #620 Bowie SubstationLegato Storage, LLCBattery storage (stand-alone)202.7Apr 2028In study
Yooperlite StorageTap 138 kV 580 Westbrook Switch - 588 WillowBT Yooperlite Storage, LLCBattery storage (stand-alone)175.7May 2028In study
Sandford SolarTap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429) · shared with 1 other requestBT Sandford Solar, LLCSolar126.2Jan 2029In study
Sandford StorageTap 345kV Bird Dog (Bus #11736) - Jacksboro (Bus #1429) · shared with 1 other requestBT Sandford Solar, LLCBattery storage (paired with solar)100.9Jan 2029In study
Spur Energy StorageTap 345kV (1429) JACKSBRO_5 - (11736) BIRDDOG_5Spur Energy Storage, LLCBattery storage (stand-alone)612.6Sep 2029In study
Solar Star Rhome Storage576 RHOME 138kVSolar Star Rhome StorageBattery storage (stand-alone)226.2Sep 2029In study

Crowded connection points in Wise County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Bus 11736 (11736) 345 kV 3 requests · 840 MW3 in study
  • Spur Energy Storage 28INR0278 · Battery storage · 613 MW · In study
  • Sandford Solar 26INR0318 · Solar · 126 MW · In study
  • Sandford Storage 26INR0319 · Battery storage · 101 MW · In study
Jacksboro (1429) 345 kV 9 requests · 4,324 MW · 3 in Wise County, 6 in Jack8 in study, 1 signed
  • Fortuna Wind 22INR0301 · Wind · 295 MW · Signed Aug 2024 · Jack
  • Thunder Bird 2 Gas 28INR0509 · Gas combined cycle · 1,273 MW · In study · Jack
  • Thunder Bird 1 Gas 30INR0110 · Gas combined cycle · 1,273 MW · In study · Jack
  • Spur Energy Storage 28INR0278 · Battery storage · 613 MW · In study
  • Campsey Wind 23INR0174 · Wind · 238 MW · In study · Jack
  • Lightning Ridge Energy Storage 26INR0460 · Battery storage · 205 MW · In study · Jack
  • JackGard BESS 26INR0215 · Battery storage · 201 MW · In study · Jack
  • Sandford Solar 26INR0318 · Solar · 126 MW · In study
  • Sandford Storage 26INR0319 · Battery storage · 101 MW · In study
Bus 31875 (31875) 2 requests · 2,000 MW2 in study
  • Prairie Point Energy Storage I 27INR0618 · Battery storage · 1,000 MW · In study
  • Prairie Point Energy Storage II 27INR0619 · Battery storage · 1,000 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Wise County

  • Wise County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 4, Dallas/Fort Worth: 2309 Gravel Dr, Fort Worth TX 76118-6951, 817-588-5800; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Wise County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Wise County.

Permits and reviews for Wise County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Wise County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Wise County connects to the grid

Wise County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Wise County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Wise County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 4

Collin · Cooke · Dallas · Denton · Ellis · Erath · Fannin · Grayson · Hood · Hunt · Johnson · Kaufman · Navarro · Palo Pinto · Parker · Rockwall · Somervell · Tarrant

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources