Dickens County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
9 proposed energy projects from ERCOT's September 2026 report, plus who to call in Dickens County and in TCEQ Region 2 before signing a solar, wind, or battery storage lease.
Check land in Dickens CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Dickens County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Dickens County?
ERCOT's September 2026 interconnection report lists 9 proposed energy projects in Dickens County (5 solar, 1 wind and 3 battery storage), about 2,317 MW in all. 7 of the 9 have a signed interconnection agreement.
What stands out in Dickens County
By capacity, solar leads in Dickens County with 1,102 MW across 5 projects, followed by battery storage (3 projects, 922 MW) and wind (1 project, 293 MW). The largest single project is CORUSCANT BESS, a 418 MW stand-alone battery storage project listed under AEU Battery Project III LLC, still in study, and its target online date is Apr 2027. Of the 9, 2 are still in ERCOT's study process, 5 have a signed interconnection agreement but no security posted yet and 2 have posted security or started construction. Every listed connection point is on the 345 kV system (why the voltage matters). Sanders Hollow Energy Center, LLC and Wolf Spring Solar, LLC are each listed on 2 projects; 7 different companies appear in all. Target online dates for the projects not yet running span Apr 2027 to Jun 2029. All of them fall in ERCOT's Panhandle load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Donegal Solar59904 Cottonwood 345kV · shared with 1 other request | HE-Cottonwood Solar LLC | Solar | 201.6 | Nov 2028 | Signed; security posted |
| Spurland Solar I59908 Nova Prime 345 345kV · shared with 1 other request | Spurland Solar I | Solar | 302.1 | Dec 2028 | Signed; security posted |
| Wolf Spring SolarTap 345kV 59904 Cotton Wood - 23922 White River Ckt 1 · shared with 1 other request | Wolf Spring Solar, LLC | Solar | 195.8 | Aug 2028 | Signed Aug 2024 |
| Wolf Spring StorageTap 345kV 59904 Cotton Wood - 23922 White River Ckt 1 · shared with 1 other request | Wolf Spring Solar, LLC | Battery storage (paired with solar) | 202.7 | Aug 2028 | Signed Aug 2024 |
| Spurland Solar II59908 Nova Prime 345 345kV · shared with 1 other request | Spurland Solar II | Solar | 201.6 | Dec 2028 | Signed Aug 2026 |
| Sanders Hollow Energy CenterTap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHC... | Sanders Hollow Energy Center, LLC | Wind | 292.6 | Jun 2029 | Signed Jun 2026 |
| Outrider BESSTap 345 kV 59904 Cottonwood (W_CW_345) - 60500 Edith Clarke (EDITHC... | Sanders Hollow Energy Center, LLC | Battery storage (stand-alone) | 302.0 | Jun 2029 | Signed Jun 2026 |
| CORUSCANT BESSTap 345kV 59904 COTTONWOOD - 60500 EDITHCLA7A | AEU Battery Project III LLC | Battery storage (stand-alone) | 417.8 | Apr 2027 | In study |
| Timberlakes Solar59904 Cottonwood 345kV · shared with 1 other request | Donegalsol | Solar | 200.7 | Nov 2028 | In study |
Crowded connection points in Dickens County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Cottonwood (59904) 345 kV 16 requests · 3,924 MW · 7 in Dickens County, 9 in Motley, King, Cottle7 in study, 5 signed, 3 signed; security posted, 1 approved for synchronization
- Buzios Solar 24INR0399 · Solar · 252 MW · Approved for synchronization · Motley
- Bigway Solar II 27INR0128 · Solar · 206 MW · Signed; security posted · King
- Donegal Solar 23INR0089 · Solar · 202 MW · Signed; security posted
- Bigway Solar I 27INR0127 · Solar · 195 MW · Signed; security posted · King
- Outrider BESS 28INR0288 · Battery storage · 302 MW · Signed Jun 2026
- Sanders Hollow Energy Center 28INR0169 · Wind · 293 MW · Signed Jun 2026
- Wake Wind Energy Repower 26INR0647 · Wind · 252 MW · Signed Feb 2014 · Crosby
- Wolf Spring Storage 25INR0173 · Battery storage · 203 MW · Signed Aug 2024
- Wolf Spring Solar 25INR0172 · Solar · 196 MW · Signed Aug 2024
- Sitges Wind 28INR0017 · Wind · 600 MW · In study · Motley
- CORUSCANT BESS 27INR0195 · Battery storage · 418 MW · In study
- Soluce Cotton Solar 28INR0267 · Solar · 203 MW · In study · Cottle
- Soluce Cotton Storage 28INR0268 · Battery storage · 202 MW · In study · Cottle
- Timberlakes Solar 25INR0165 · Solar · 201 MW · In study
- TEXAS SOLAR NOVA 3 22INR0215 · Solar · 200 MW · In study · Kent
- Buzios BESS SLF 29INR0021 · Battery storage · 0 MW · In study · Motley
Edith Clarke (60500) 345 kV 11 requests · 3,229 MW · 3 in Dickens County, 8 in Cottle, King, Foard6 in study, 3 signed; security posted, 2 signed
- Seine BESS 23INR0140 · Battery storage · 309 MW · Signed; security posted · Foard
- Bigway Solar II 27INR0128 · Solar · 206 MW · Signed; security posted · King
- Bigway Solar I 27INR0127 · Solar · 195 MW · Signed; security posted · King
- Outrider BESS 28INR0288 · Battery storage · 302 MW · Signed Jun 2026
- Sanders Hollow Energy Center 28INR0169 · Wind · 293 MW · Signed Jun 2026
- Sitges Wind 28INR0017 · Wind · 600 MW · In study · Motley
- CORUSCANT BESS 27INR0195 · Battery storage · 418 MW · In study
- Triangle Ranch Alpha 25INR0177 · Wind · 302 MW · In study · Cottle
- Soluce Cotton Solar 28INR0267 · Solar · 203 MW · In study · Cottle
- Soluce Cotton Storage 28INR0268 · Battery storage · 202 MW · In study · Cottle
- Triangle Ranch Bravo 25INR0178 · Wind · 200 MW · In study · Cottle
White River (23922) 345 kV 4 requests · 650 MW · 2 in Dickens County, 2 in Motley2 signed, 1 approved for synchronization, 1 in study
Novaprime (59908) 345 kV 6 requests · 1,500 MW · 2 in Dickens County, 4 in Kent3 in study, 2 signed; security posted, 1 signed
- Spurland Solar I 29INR0192 · Solar · 302 MW · Signed; security posted
- Clairemont Solar 1 27INR0435 · Solar · 252 MW · Signed; security posted · Kent
- Spurland Solar II 29INR0195 · Solar · 202 MW · Signed Aug 2026
- Jay Flat BESS 27INR0447 · Battery storage · 259 MW · In study · Kent
- Buzzer Butte Solar 29INR0394 · Solar · 243 MW · In study · Kent
- Buzzer Butte 2 Solar 30INR0164 · Solar · 243 MW · In study · Kent
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Dickens County
- Dickens County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 2, Lubbock: 5012 50th St, Ste 100, Lubbock TX 79414-3426, 806-796-7092; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Dickens County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Dickens County.
Permits and reviews for Dickens County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Dickens County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Dickens County connects to the grid
Dickens County is on the ERCOT grid. The projects listed above are in ERCOT's Panhandle load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Dickens County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Dickens County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.