Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Parker County

Parker County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects4
Total capacity2,222MW
Signed agreements0of 4
New since August0requests

4 proposed energy projects from ERCOT's September 2026 report, plus who to call in Parker County and in TCEQ Region 4 before signing a solar, wind, or battery storage lease.

Check land in Parker CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Parker County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Parker County?

ERCOT's September 2026 interconnection report lists 4 proposed energy projects in Parker County (1 solar and 3 battery storage), about 2,222 MW in all. None has a signed interconnection agreement yet.

What stands out in Parker County

By capacity, battery storage leads in Parker County with 1,620 MW across 3 projects, followed by solar (1 project, 602 MW). The largest single project is Nabla Energy Storage I, a 750 MW stand-alone battery storage project listed under Nabla Park LLC, still in study, and its target online date is Sep 2029. Of the 4, 4 are still in ERCOT's study process. Connection points are mostly at 345 kV (3 projects) and 138 kV (1 project) (why the voltage matters). Nabla Park LLC is listed on the most projects here (2 of 4); 3 different companies appear in all. Target online dates for the projects not yet running span Sep 2027 to Sep 2029. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Rocking X SolarTap the 345 kV Parker Switch (bus#1436) – Comanche Peak SES (bus#19...7100 Tin Top LLCSolar602.2Sep 2027In study
Buckaroo BESSTap 138kV BROCK(487) – STHBROCKSW(489)Weatherford BESS LLCBattery storage (stand-alone)120.0Dec 2027In study
Nabla Energy Storage IDouble Tap 345kV Parker (1436) - Benbrook (1873 & 1869) DCKT · shared with 1 other requestNabla Park LLCBattery storage (stand-alone)750.0Sep 2029In study
Nabla Energy Storage IIDouble Tap 345kV Parker (1436) - Benbrook (1873 & 1869) DCKT · shared with 1 other requestNabla Park LLCBattery storage (stand-alone)750.0Sep 2029In study

Crowded connection points in Parker County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Parker (1436) 345 kV 4 requests · 2,605 MW · 3 in Parker County, 1 in Jack4 in study
  • Nabla Energy Storage I 27INR0571 · Battery storage · 750 MW · In study
  • Nabla Energy Storage II 28INR0466 · Battery storage · 750 MW · In study
  • Rocking X Solar 23INR0368 · Solar · 602 MW · In study
  • Pinnington Storage 24INR0011 · Battery storage · 503 MW · In study · Jack
Bus 1873 (1873) 345 kV 2 requests · 1,500 MW2 in study
  • Nabla Energy Storage I 27INR0571 · Battery storage · 750 MW · In study
  • Nabla Energy Storage II 28INR0466 · Battery storage · 750 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Parker County

  • Parker County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 4, Dallas/Fort Worth: 2309 Gravel Dr, Fort Worth TX 76118-6951, 817-588-5800; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Parker County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Parker County.

Permits and reviews for Parker County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Parker County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Parker County connects to the grid

Parker County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Parker County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Parker County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 4

Collin · Cooke · Dallas · Denton · Ellis · Erath · Fannin · Grayson · Hood · Hunt · Johnson · Kaufman · Navarro · Palo Pinto · Rockwall · Somervell · Tarrant · Wise

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources