Mills County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
7 proposed energy projects from ERCOT's September 2026 report, plus who to call in Mills County and in TCEQ Region 9 before signing a solar, wind, or battery storage lease.
Check land in Mills CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Mills County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Mills County?
ERCOT's September 2026 interconnection report lists 7 proposed energy projects in Mills County (2 solar, 1 wind and 4 battery storage), about 1,410 MW in all. 3 of the 7 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.
What stands out in Mills County
By capacity, battery storage leads in Mills County with 776 MW across 4 projects, followed by solar (2 projects, 332 MW) and wind (1 project, 302 MW). The largest single project is Priddy Wind, a 302 MW wind project listed under ENGIE North America, approved for synchronization, and its target online date is Dec 2026. Of the 7, 4 are still in ERCOT's study process, 2 have a signed interconnection agreement but no security posted yet and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (3 projects) and 138 kV (3 projects) (why the voltage matters). Mills Tx Solar LLC is listed on the most projects here (2 of 7); 6 different companies appear in all. Target online dates for the projects not yet running span Aug 2028 to May 2030. All of them fall in ERCOT's North load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Priddy Windtap 345kV 1444 Brown – 3422 Killeen | ENGIE North America | Wind | 302.4 | Dec 2026 | Approved for synchronization |
| Starlight Solartap the 138 kV Goldthwaite (#7070) – San Saba Switch (#77074) | Mills Tx Solar LLC | Solar | 130.7 | May 2030 | Signed Dec 2025 |
| Starlight StorageTap 138kV 7070 Goldthwaite – 77074 San Saba Switch | Mills Tx Solar LLC | Battery storage (stand-alone) | 209.0 | May 2030 | Signed Dec 2025 |
| Clapton SolarTap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch · shared with 1 other request | Clapton Solar | Solar | 201.0 | Aug 2028 | In study |
| Clapton StorageTap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch · shared with 1 other request | Clapton BESS | Battery storage (paired with solar) | 208.9 | Aug 2028 | In study |
| Cash Mills Storage CenterTap Line between Evant (bus#7068) and Goldthwaite (Bus# 7070) | Mills Storage Center | Battery storage (stand-alone) | 200.7 | Jun 2029 | In study |
| Moss Rock Storage#7070 Goldthwaite 138kV | Invenergy Storage Development LLC | Battery storage (stand-alone) | 157.1 | Dec 2029 | In study |
Crowded connection points in Mills County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Goldthwaite (7070) 138 kV 4 requests · 697 MW2 signed, 2 in study
- Starlight Storage 27INR0107 · Battery storage · 209 MW · Signed Dec 2025
- Starlight Solar 27INR0105 · Solar · 131 MW · Signed Dec 2025
- Cash Mills Storage Center 29INR0065 · Battery storage · 201 MW · In study
- Moss Rock Storage 28INR0438 · Battery storage · 157 MW · In study
Brown (1444) 345 kV 19 requests · 4,694 MW · 3 in Mills County, 16 in Brown, Coleman, Runnels15 in study, 3 signed; security posted, 1 approved for synchronization
- Priddy Wind 16INR0085 · Wind · 302 MW · Approved for synchronization
- Hanson Solar 23INR0086 · Solar · 399 MW · Signed; security posted · Coleman
- Chisme Storage 24INR0331 · Battery storage · 151 MW · Signed; security posted · Brown
- Chisme Solar 24INR0333 · Solar · 147 MW · Signed; security posted · Brown
- Brookesmith Storage 28INR0166 · Battery storage · 351 MW · In study · Brown
- Mountaineer Solar 21INR0294 · Solar · 329 MW · In study · Brown
- Soluce Bravo Storage 28INR0270 · Battery storage · 303 MW · In study · Brown
- Winters Glow Solar 28INR0198 · Solar · 302 MW · In study · Runnels
- Horseshoe Bend Solar 19INR0075 · Solar · 301 MW · In study · Brown
- Nouveau BESS 27INR0291 · Battery storage · 256 MW · In study · Brown
- Paintbrush PV1 28INR0469 · Solar · 252 MW · In study · Coleman
- Paintbrush PV2 28INR0470 · Solar · 252 MW · In study · Coleman
- Paintbrush PV3 29INR0220 · Solar · 252 MW · In study · Coleman
- Paintbrush PV4 29INR0221 · Solar · 252 MW · In study · Coleman
- Clapton Storage 26INR0430 · Battery storage · 209 MW · In study
- Paintbrush BESS1 29INR0222 · Battery storage · 201 MW · In study · Coleman
- Clapton Solar 26INR0238 · Solar · 201 MW · In study
- Winters Glow Storage 28INR0199 · Battery storage · 155 MW · In study · Runnels
- Soluce Bravo Solar 28INR0269 · Solar · 81 MW · In study · Brown
Buckhorn (3424) 345 kV 6 requests · 1,219 MW · 2 in Mills County, 4 in Brown, Lampasas3 signed; security posted, 3 in study
- Thomas Cameron BESS 24INR0543 · Battery storage · 206 MW · Signed; security posted · Lampasas
- Chisme Storage 24INR0331 · Battery storage · 151 MW · Signed; security posted · Brown
- Chisme Solar 24INR0333 · Solar · 147 MW · Signed; security posted · Brown
- Aurora Energy Storage 28INR0277 · Battery storage · 306 MW · In study · Lampasas
- Clapton Storage 26INR0430 · Battery storage · 209 MW · In study
- Clapton Solar 26INR0238 · Solar · 201 MW · In study
San Saba (77074) 138 kV 2 requests · 340 MW2 signed
- Starlight Storage 27INR0107 · Battery storage · 209 MW · Signed Dec 2025
- Starlight Solar 27INR0105 · Solar · 131 MW · Signed Dec 2025
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Mills County
- Mills County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 9, Waco: 6801 Sanger Ave, Ste 2500, Waco TX 76710-7826, 254-751-0335; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Mills County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Mills County.
Permits and reviews for Mills County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Mills County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Mills County connects to the grid
Mills County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Mills County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Mills County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 9
Bell · Bosque · Brazos · Burleson · Coryell · Falls · Freestone · Grimes · Hamilton · Hill · Lampasas · Leon · Limestone · Madison · McLennan · Milam · Robertson · San Saba · Washington