Proposed projects26
Total capacity6,650MW
Signed agreements11of 26
New since August0requests

26 proposed energy projects from ERCOT's September 2026 report, plus who to call in San Patricio County and in TCEQ Region 14 before signing a solar, wind, or battery storage lease.

Check land in San Patricio CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for San Patricio County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in San Patricio County?

ERCOT's September 2026 interconnection report lists 26 proposed energy projects in San Patricio County (9 solar, 2 wind, 13 battery storage and 2 gas), about 6,650 MW in all. 11 of the 26 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.

What stands out in San Patricio County

By capacity, battery storage leads in San Patricio County with 2,300 MW across 13 projects, followed by solar (9 projects, 2,183 MW) and wind (2 projects, 1,327 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Hecate Energy Arkansas Wind, a 1,029 MW wind project listed under Hecate Energy Gulf Wind LLC, still in study, and its target online date is Jun 2030. Of the 26, 15 are still in ERCOT's study process, 3 have a signed interconnection agreement but no security posted yet, 7 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (15 projects) and 138 kV (9 projects) (why the voltage matters). The single most-used connection point is 8606 Goddard 345kV, shared by 3 projects. RWE Clean Energy Development, LLC is listed on the most projects here (3 of 26); 22 different companies appear in all. Target online dates for the projects not yet running span Jul 2027 to Aug 2030. All of them fall in ERCOT's Coastal load zone. 1 that was listed in August has since dropped off.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Jackalope Solar8173 Gibbs 138kVPeacock Energy Project, LLCSolar155.7Feb 2026Approved for synchronization
SanPat Solar ITap 345kV 8249 Angstrom – 8659 Naismith · shared with 1 other requestPadre Solar LLCSolar308.9Jul 2027Signed; security posted
SanPat Solar IITap 345kV 8249 Angstrom – 8659 Naismith · shared with 1 other requestCGRP 04, LLCSolar256.2Jul 2027Signed; security posted
Bowstring BESS138kV 8961 WHITEPT4A - 8418 RINCON4ALongbow Energy Storage, LLCBattery storage (stand-alone)155.0Sep 2028Signed; security posted
Bayou Creek Solar8606 Goddard 345kV · shared with 3 other requestsBayou Creek Solar LLCSolar256.9Sep 2028Signed; security posted
Diamond Cowboy StorageTap 345kV 8249 Angstrom - 8624 Grissom · shared with 1 other requestDiamond B Storage, LLCBattery storage (stand-alone)103.5Oct 2028Signed; security posted
Iron Cowboy SolarBus #8920 Haisley 4A 138 kV · shared with 1 other requestVaquero II Solar LLCSolar144.6Jul 2029Signed; security posted
Iron Cowboy StorageBus #8920 Haisley 4A 138 kV · shared with 1 other requestVaquero II Storage LLCBattery storage (paired with solar)63.3Jul 2029Signed; security posted
Titus Low Carbon Ventures Solar 1Tap 345kV 8249 Angstrom - 8624 Grissom · shared with 1 other requestVaquero Solar, LLCSolar338.0Oct 2028Signed May 2026
Gregory Power Development SLF8580 Resnick 138kVGregory Power Partners LLCGas combined cycle469.9Dec 2028Signed Jul 2026
Palo Verde WindTap 345kV 8624 Grissom – 8455 Lon C Hill · shared with 1 other requestRWE Clean Energy Development, LLCWind297.5Jul 2029Signed Dec 2025
Portland Storage SLF8566 HOT IRON 4A 138 kVConvergent Energy Solutions LLCBattery storage (stand-alone)Self-limitingJan 2028In study
Coda BESS(#80258) Mayo 138kVCoda BESS, LLCBattery storage (stand-alone)202.0Jul 2028In study
Alila BESS II8249 Angstrom 345kVElectra Energy Project, LLCBattery storage (stand-alone)205.7Jan 2029In study
Sunburst BESSKATOEN (Bus#8579) · shared with 1 other requestIndigo Solar, LLCBattery storage (paired with solar)256.3Mar 2029In study
Sunburst SolarKATOEN (Bus#8579) · shared with 1 other requestIndigo Solar, LLCSolar301.6Mar 2029In study
San Patricio Energy Center BESS8606 Goddard 345kV · shared with 3 other requestsFerrovial Energy US 1Battery storage (stand-alone)300.8Mar 2029In study
Kalina Solar8606 Goddard 345kV · shared with 3 other requestsAurora Solar LLCSolar120.0May 2029In study
PALO VERDE BESSTap 345kV 8624 Grissom – 8455 Lon C Hill · shared with 1 other requestRWE Clean Energy Development, LLCBattery storage (paired with wind)150.0Jul 2029In study
Gulf Gateway Solar OneTap 345 kV 8249 Angstrom - 8624 Grissom · shared with 1 other requestGulf Gateway Solar, LLCSolar301.4Dec 2029In study
Gulf Gateway Storage OneTap 345 kV 8249 Angstrom - 8624 Grissom · shared with 1 other requestGulf Gateway Storage, LLCBattery storage (paired with solar)301.4Dec 2029In study
Kalina Storage8606 GODDARD 345kV · shared with 3 other requestsAurora Solar LLCBattery storage (paired with solar)104.6Dec 2029In study
Pathfinder Energy Storage, LLC8437 Rincon 138kVPathfinder Energy Storage, LLCBattery storage (stand-alone)201.2Dec 2029In study
Nautilus Heavy Storage8422 Dupont 138kVNautilus Heavy Storage, LLCBattery storage (stand-alone)256.2Jan 2030In study
Hecate Energy Arkansas Wind8659 Naismith 345kVHecate Energy Gulf Wind LLCWind1,029.4Jun 2030In study
Blue Kite<Bus#8956> <WHITEPOINT> <345KV>RWE Clean Energy Development, LLCGas turbine370.1Aug 2030In study

No longer listed since August

These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.

  • Pintail Pass BESS, battery storage, 207 MW (Pintail Pass BESS, LLC)

Crowded connection points in San Patricio County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Angstrom (8249) 345 kV 10 requests · 3,749 MW · 7 in San Patricio County, 3 in Refugio3 signed; security posted, 3 signed, 3 in study, 1 approved for synchronization
  • Charger Solar 23INR0047 · Solar · 397 MW · Approved for synchronization · Refugio
  • SanPat Solar I 25INR0081 · Solar · 309 MW · Signed; security posted
  • SanPat Solar II 25INR0052 · Solar · 256 MW · Signed; security posted
  • Diamond Cowboy Storage 26INR0428 · Battery storage · 104 MW · Signed; security posted
  • Ross Solar 26INR0155 · Solar · 1,026 MW · Signed Jun 2024 · Refugio
  • Ross Storage 26INR0156 · Battery storage · 511 MW · Signed Jun 2024 · Refugio
  • Titus Low Carbon Ventures Solar 1 26INR0211 · Solar · 338 MW · Signed May 2026
  • Gulf Gateway Solar One 27INR0492 · Solar · 301 MW · In study
  • Gulf Gateway Storage One 27INR0556 · Battery storage · 301 MW · In study
  • Alila BESS II 29INR0207 · Battery storage · 206 MW · In study
Grissom (8624) 345 kV 6 requests · 1,492 MW3 in study, 2 signed, 1 signed; security posted
  • Diamond Cowboy Storage 26INR0428 · Battery storage · 104 MW · Signed; security posted
  • Titus Low Carbon Ventures Solar 1 26INR0211 · Solar · 338 MW · Signed May 2026
  • Palo Verde Wind 27INR0132 · Wind · 298 MW · Signed Dec 2025
  • Gulf Gateway Solar One 27INR0492 · Solar · 301 MW · In study
  • Gulf Gateway Storage One 27INR0556 · Battery storage · 301 MW · In study
  • PALO VERDE BESS 27INR0227 · Battery storage · 150 MW · In study
Goddard (8606) 345 kV 6 requests · 1,284 MW · 4 in San Patricio County, 2 in Bee3 in study, 3 signed; security posted
  • Argenta Solar 25INR0060 · Solar · 310 MW · Signed; security posted · Bee
  • Bayou Creek Solar 28INR0223 · Solar · 257 MW · Signed; security posted
  • Argenta Storage 25INR0061 · Battery storage · 192 MW · Signed; security posted · Bee
  • San Patricio Energy Center BESS 29INR0227 · Battery storage · 301 MW · In study
  • Kalina Solar 22INR0392 · Solar · 120 MW · In study
  • Kalina Storage 29INR0106 · Battery storage · 105 MW · In study
Naismith (8659) 345 kV 3 requests · 1,594 MW2 signed; security posted, 1 in study
  • SanPat Solar I 25INR0081 · Solar · 309 MW · Signed; security posted
  • SanPat Solar II 25INR0052 · Solar · 256 MW · Signed; security posted
  • Hecate Energy Arkansas Wind 30INR0004 · Wind · 1,029 MW · In study
Lon Hill (8455) 345 kV 6 requests · 1,573 MW · 2 in San Patricio County, 4 in Nueces, Zapata, Brooks3 in study, 2 signed; security posted, 1 signed
  • Sunscape Renewable Energy Solar SLF 27INR0047 · Solar · 523 MW · Signed; security posted · Nueces
  • Sunscape Renewable Energy Storage SLF 27INR0048 · Battery storage · 0 MW · Signed; security posted · Nueces
  • Palo Verde Wind 27INR0132 · Wind · 298 MW · Signed Dec 2025
  • Vaquero 1 Wind 17INR0043 · Wind · 400 MW · In study · Zapata
  • Kinenos Solar 23INR0087 · Solar · 203 MW · In study · Brooks
  • PALO VERDE BESS 27INR0227 · Battery storage · 150 MW · In study
Bus 8579 (8579) 2 requests · 558 MW2 in study
  • Sunburst Solar 28INR0179 · Solar · 302 MW · In study
  • Sunburst BESS 28INR0181 · Battery storage · 256 MW · In study
Haisley (8920) 138 kV 2 requests · 208 MW2 signed; security posted
  • Iron Cowboy Solar 28INR0305 · Solar · 145 MW · Signed; security posted
  • Iron Cowboy Storage 28INR0306 · Battery storage · 63 MW · Signed; security posted

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in San Patricio County

  • San Patricio County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 14, Corpus Christi: 500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318, 361-881-6900; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • San Patricio County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for San Patricio County.

Permits and reviews for San Patricio County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in San Patricio County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in San Patricio County connects to the grid

San Patricio County is on the ERCOT grid. The projects listed above are in ERCOT's Coastal load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in San Patricio County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in San Patricio County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 14

Aransas · Bee · Calhoun · DeWitt · Goliad · Gonzales · Jackson · Jim Wells · Kleberg · Lavaca · Live Oak · Nueces · Refugio · Victoria

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.