Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
26 proposed energy projects from ERCOT's September 2026 report, plus who to call in San Patricio County and in TCEQ Region 14 before signing a solar, wind, or battery storage lease.
Check land in San Patricio CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for San Patricio County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in San Patricio County?
ERCOT's September 2026 interconnection report lists 26 proposed energy projects in San Patricio County (9 solar, 2 wind, 13 battery storage and 2 gas), about 6,650 MW in all. 11 of the 26 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.
What stands out in San Patricio County
By capacity, battery storage leads in San Patricio County with 2,300 MW across 13 projects, followed by solar (9 projects, 2,183 MW) and wind (2 projects, 1,327 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Hecate Energy Arkansas Wind, a 1,029 MW wind project listed under Hecate Energy Gulf Wind LLC, still in study, and its target online date is Jun 2030. Of the 26, 15 are still in ERCOT's study process, 3 have a signed interconnection agreement but no security posted yet, 7 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (15 projects) and 138 kV (9 projects) (why the voltage matters). The single most-used connection point is 8606 Goddard 345kV, shared by 3 projects. RWE Clean Energy Development, LLC is listed on the most projects here (3 of 26); 22 different companies appear in all. Target online dates for the projects not yet running span Jul 2027 to Aug 2030. All of them fall in ERCOT's Coastal load zone. 1 that was listed in August has since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Jackalope Solar8173 Gibbs 138kV | Peacock Energy Project, LLC | Solar | 155.7 | Feb 2026 | Approved for synchronization |
| SanPat Solar ITap 345kV 8249 Angstrom – 8659 Naismith · shared with 1 other request | Padre Solar LLC | Solar | 308.9 | Jul 2027 | Signed; security posted |
| SanPat Solar IITap 345kV 8249 Angstrom – 8659 Naismith · shared with 1 other request | CGRP 04, LLC | Solar | 256.2 | Jul 2027 | Signed; security posted |
| Bowstring BESS138kV 8961 WHITEPT4A - 8418 RINCON4A | Longbow Energy Storage, LLC | Battery storage (stand-alone) | 155.0 | Sep 2028 | Signed; security posted |
| Bayou Creek Solar8606 Goddard 345kV · shared with 3 other requests | Bayou Creek Solar LLC | Solar | 256.9 | Sep 2028 | Signed; security posted |
| Diamond Cowboy StorageTap 345kV 8249 Angstrom - 8624 Grissom · shared with 1 other request | Diamond B Storage, LLC | Battery storage (stand-alone) | 103.5 | Oct 2028 | Signed; security posted |
| Iron Cowboy SolarBus #8920 Haisley 4A 138 kV · shared with 1 other request | Vaquero II Solar LLC | Solar | 144.6 | Jul 2029 | Signed; security posted |
| Iron Cowboy StorageBus #8920 Haisley 4A 138 kV · shared with 1 other request | Vaquero II Storage LLC | Battery storage (paired with solar) | 63.3 | Jul 2029 | Signed; security posted |
| Titus Low Carbon Ventures Solar 1Tap 345kV 8249 Angstrom - 8624 Grissom · shared with 1 other request | Vaquero Solar, LLC | Solar | 338.0 | Oct 2028 | Signed May 2026 |
| Gregory Power Development SLF8580 Resnick 138kV | Gregory Power Partners LLC | Gas combined cycle | 469.9 | Dec 2028 | Signed Jul 2026 |
| Palo Verde WindTap 345kV 8624 Grissom – 8455 Lon C Hill · shared with 1 other request | RWE Clean Energy Development, LLC | Wind | 297.5 | Jul 2029 | Signed Dec 2025 |
| Portland Storage SLF8566 HOT IRON 4A 138 kV | Convergent Energy Solutions LLC | Battery storage (stand-alone) | Self-limiting | Jan 2028 | In study |
| Coda BESS(#80258) Mayo 138kV | Coda BESS, LLC | Battery storage (stand-alone) | 202.0 | Jul 2028 | In study |
| Alila BESS II8249 Angstrom 345kV | Electra Energy Project, LLC | Battery storage (stand-alone) | 205.7 | Jan 2029 | In study |
| Sunburst BESSKATOEN (Bus#8579) · shared with 1 other request | Indigo Solar, LLC | Battery storage (paired with solar) | 256.3 | Mar 2029 | In study |
| Sunburst SolarKATOEN (Bus#8579) · shared with 1 other request | Indigo Solar, LLC | Solar | 301.6 | Mar 2029 | In study |
| San Patricio Energy Center BESS8606 Goddard 345kV · shared with 3 other requests | Ferrovial Energy US 1 | Battery storage (stand-alone) | 300.8 | Mar 2029 | In study |
| Kalina Solar8606 Goddard 345kV · shared with 3 other requests | Aurora Solar LLC | Solar | 120.0 | May 2029 | In study |
| PALO VERDE BESSTap 345kV 8624 Grissom – 8455 Lon C Hill · shared with 1 other request | RWE Clean Energy Development, LLC | Battery storage (paired with wind) | 150.0 | Jul 2029 | In study |
| Gulf Gateway Solar OneTap 345 kV 8249 Angstrom - 8624 Grissom · shared with 1 other request | Gulf Gateway Solar, LLC | Solar | 301.4 | Dec 2029 | In study |
| Gulf Gateway Storage OneTap 345 kV 8249 Angstrom - 8624 Grissom · shared with 1 other request | Gulf Gateway Storage, LLC | Battery storage (paired with solar) | 301.4 | Dec 2029 | In study |
| Kalina Storage8606 GODDARD 345kV · shared with 3 other requests | Aurora Solar LLC | Battery storage (paired with solar) | 104.6 | Dec 2029 | In study |
| Pathfinder Energy Storage, LLC8437 Rincon 138kV | Pathfinder Energy Storage, LLC | Battery storage (stand-alone) | 201.2 | Dec 2029 | In study |
| Nautilus Heavy Storage8422 Dupont 138kV | Nautilus Heavy Storage, LLC | Battery storage (stand-alone) | 256.2 | Jan 2030 | In study |
| Hecate Energy Arkansas Wind8659 Naismith 345kV | Hecate Energy Gulf Wind LLC | Wind | 1,029.4 | Jun 2030 | In study |
| Blue Kite<Bus#8956> <WHITEPOINT> <345KV> | RWE Clean Energy Development, LLC | Gas turbine | 370.1 | Aug 2030 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- Pintail Pass BESS, battery storage, 207 MW (Pintail Pass BESS, LLC)
Crowded connection points in San Patricio County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Angstrom (8249) 345 kV 10 requests · 3,749 MW · 7 in San Patricio County, 3 in Refugio3 signed; security posted, 3 signed, 3 in study, 1 approved for synchronization
- Charger Solar 23INR0047 · Solar · 397 MW · Approved for synchronization · Refugio
- SanPat Solar I 25INR0081 · Solar · 309 MW · Signed; security posted
- SanPat Solar II 25INR0052 · Solar · 256 MW · Signed; security posted
- Diamond Cowboy Storage 26INR0428 · Battery storage · 104 MW · Signed; security posted
- Ross Solar 26INR0155 · Solar · 1,026 MW · Signed Jun 2024 · Refugio
- Ross Storage 26INR0156 · Battery storage · 511 MW · Signed Jun 2024 · Refugio
- Titus Low Carbon Ventures Solar 1 26INR0211 · Solar · 338 MW · Signed May 2026
- Gulf Gateway Solar One 27INR0492 · Solar · 301 MW · In study
- Gulf Gateway Storage One 27INR0556 · Battery storage · 301 MW · In study
- Alila BESS II 29INR0207 · Battery storage · 206 MW · In study
Grissom (8624) 345 kV 6 requests · 1,492 MW3 in study, 2 signed, 1 signed; security posted
- Diamond Cowboy Storage 26INR0428 · Battery storage · 104 MW · Signed; security posted
- Titus Low Carbon Ventures Solar 1 26INR0211 · Solar · 338 MW · Signed May 2026
- Palo Verde Wind 27INR0132 · Wind · 298 MW · Signed Dec 2025
- Gulf Gateway Solar One 27INR0492 · Solar · 301 MW · In study
- Gulf Gateway Storage One 27INR0556 · Battery storage · 301 MW · In study
- PALO VERDE BESS 27INR0227 · Battery storage · 150 MW · In study
Goddard (8606) 345 kV 6 requests · 1,284 MW · 4 in San Patricio County, 2 in Bee3 in study, 3 signed; security posted
- Argenta Solar 25INR0060 · Solar · 310 MW · Signed; security posted · Bee
- Bayou Creek Solar 28INR0223 · Solar · 257 MW · Signed; security posted
- Argenta Storage 25INR0061 · Battery storage · 192 MW · Signed; security posted · Bee
- San Patricio Energy Center BESS 29INR0227 · Battery storage · 301 MW · In study
- Kalina Solar 22INR0392 · Solar · 120 MW · In study
- Kalina Storage 29INR0106 · Battery storage · 105 MW · In study
Naismith (8659) 345 kV 3 requests · 1,594 MW2 signed; security posted, 1 in study
- SanPat Solar I 25INR0081 · Solar · 309 MW · Signed; security posted
- SanPat Solar II 25INR0052 · Solar · 256 MW · Signed; security posted
- Hecate Energy Arkansas Wind 30INR0004 · Wind · 1,029 MW · In study
Lon Hill (8455) 345 kV 6 requests · 1,573 MW · 2 in San Patricio County, 4 in Nueces, Zapata, Brooks3 in study, 2 signed; security posted, 1 signed
- Sunscape Renewable Energy Solar SLF 27INR0047 · Solar · 523 MW · Signed; security posted · Nueces
- Sunscape Renewable Energy Storage SLF 27INR0048 · Battery storage · 0 MW · Signed; security posted · Nueces
- Palo Verde Wind 27INR0132 · Wind · 298 MW · Signed Dec 2025
- Vaquero 1 Wind 17INR0043 · Wind · 400 MW · In study · Zapata
- Kinenos Solar 23INR0087 · Solar · 203 MW · In study · Brooks
- PALO VERDE BESS 27INR0227 · Battery storage · 150 MW · In study
Bus 8579 (8579) 2 requests · 558 MW2 in study
- Sunburst Solar 28INR0179 · Solar · 302 MW · In study
- Sunburst BESS 28INR0181 · Battery storage · 256 MW · In study
Haisley (8920) 138 kV 2 requests · 208 MW2 signed; security posted
- Iron Cowboy Solar 28INR0305 · Solar · 145 MW · Signed; security posted
- Iron Cowboy Storage 28INR0306 · Battery storage · 63 MW · Signed; security posted
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in San Patricio County
- San Patricio County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 14, Corpus Christi: 500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318, 361-881-6900; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- San Patricio County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for San Patricio County.
Permits and reviews for San Patricio County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in San Patricio County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in San Patricio County connects to the grid
San Patricio County is on the ERCOT grid. The projects listed above are in ERCOT's Coastal load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in San Patricio County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in San Patricio County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 14
Aransas · Bee · Calhoun · DeWitt · Goliad · Gonzales · Jackson · Jim Wells · Kleberg · Lavaca · Live Oak · Nueces · Refugio · Victoria