Proposed projects5
Total capacity276MW
Signed agreements1of 5
New since August0requests

5 proposed energy projects from ERCOT's September 2026 report, plus who to call in Jim Wells County and in TCEQ Region 14 before signing a solar, wind, or battery storage lease.

Check land in Jim Wells CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Jim Wells County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Jim Wells County?

ERCOT's September 2026 interconnection report lists 5 proposed energy projects in Jim Wells County (2 solar and 3 battery storage), about 276 MW in all. 1 of the 5 has a signed interconnection agreement.

What stands out in Jim Wells County

By capacity, solar leads in Jim Wells County with 153 MW across 2 projects, followed by battery storage (3 projects, 123 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Raghorn Solar SLF, a 92 MW solar project listed under Raghorn Solar LLC, still in study, and its target online date is May 2028. Of the 5, 4 are still in ERCOT's study process and 1 has posted security or started construction. Connection points are mostly at 69 kV (4 projects) and 138 kV (1 project) (why the voltage matters). Beaverhead Solar, LLC is listed on the most projects here (2 of 5); 4 different companies appear in all. Target online dates for the projects not yet running span Apr 2027 to May 2029. All of them fall in ERCOT's South load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Orange Grove BESS5660 Orange Grove Switching Station 138 kVTalitha Energy Project, LLCBattery storage (paired with solar)61.4Apr 2027Signed; security posted
Raghorn Solar SLFTap 69kV #5654 San Diego - #5658 Orange Grove · shared with 1 other requestRaghorn Solar LLCSolar91.9May 2028In study
Raghorn Storage SLFTap 69kV #5654 San Diego - #5658 Orange Grove · shared with 1 other requestRaghorn Storage LLCBattery storage (paired with solar)Self-limitingMay 2028In study
Beaverhead Solar SLFDirect to Sub 69kv #5653 Ben Bolt. · shared with 1 other requestBeaverhead Solar, LLCSolar61.5May 2029In study
Beaverhead Storage SLFDirect to Sub 69kv #5653 Ben Bolt. · shared with 1 other requestBeaverhead Solar, LLCBattery storage (paired with solar)61.5May 2029In study

Crowded connection points in Jim Wells County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

San Diego (5654) 69 kV 2 requests · 92 MW2 in study
  • Raghorn Solar SLF 27INR0249 · Solar · 92 MW · In study
  • Raghorn Storage SLF 27INR0259 · Battery storage · 0 MW · In study
Orange Grove (5658) 69 kV 2 requests · 92 MW2 in study
  • Raghorn Solar SLF 27INR0249 · Solar · 92 MW · In study
  • Raghorn Storage SLF 27INR0259 · Battery storage · 0 MW · In study
Ben Bolt (5653) 69 kV 2 requests · 123 MW2 in study
  • Beaverhead Solar SLF 27INR0307 · Solar · 62 MW · In study
  • Beaverhead Storage SLF 27INR0308 · Battery storage · 62 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Jim Wells County

  • Jim Wells County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 14, Corpus Christi: 500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318, 361-881-6900; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Jim Wells County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Jim Wells County.

Permits and reviews for Jim Wells County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Jim Wells County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Jim Wells County connects to the grid

Jim Wells County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Jim Wells County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Jim Wells County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 14

Aransas · Bee · Calhoun · DeWitt · Goliad · Gonzales · Jackson · Kleberg · Lavaca · Live Oak · Nueces · Refugio · San Patricio · Victoria

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.