Live Oak County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
5 proposed energy projects from ERCOT's September 2026 report, plus who to call in Live Oak County and in TCEQ Region 14 before signing a solar, wind, or battery storage lease.
Check land in Live Oak CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Live Oak County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Live Oak County?
ERCOT's September 2026 interconnection report lists 5 proposed energy projects in Live Oak County (3 solar and 2 battery storage), about 323 MW in all. 2 of the 5 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.
What stands out in Live Oak County
By capacity, solar leads in Live Oak County with 221 MW across 3 projects, followed by battery storage (2 projects, 101 MW). The largest single project is Anagram Solar, a 131 MW solar project listed under Anagram Solar, still in study, and its target online date is Dec 2027. Of the 5, 3 are still in ERCOT's study process, 1 has posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 69 kV (3 projects) and 138 kV (2 projects) (why the voltage matters). Buck Ranch Solar, LLC is listed on the most projects here (2 of 5); 4 different companies appear in all. Target online dates for the projects not yet running span Aug 2026 to Aug 2028. All of them fall in ERCOT's South load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Bird Dog Energy Storage5669 Argenta 69kV | VESI 37 LLC | Battery storage (stand-alone) | 60.4 | Oct 2026 | Approved for synchronization |
| Brightside Solar Alt POI8156 Charter Substation 138kV | Brightside Solar, LLC | Solar | 50.0 | Aug 2026 date passed; status per ERCOT | Signed; security posted |
| Anagram Solar8156 Charter 138 kV | Anagram Solar | Solar | 130.6 | Dec 2027 | In study |
| Buck Ranch Solar SLF5690 WEST GEORGE WEST SUB 69kV · shared with 1 other request | Buck Ranch Solar, LLC | Solar | 40.8 | Aug 2028 | In study |
| Buck Ranch Storage SLF5690 WEST GEORGE WEST SUB 69kV · shared with 1 other request | Buck Ranch Solar, LLC | Battery storage (paired with solar) | 40.8 | Aug 2028 | In study |
Crowded connection points in Live Oak County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Charter (8156) 138 kV 2 requests · 181 MW1 signed; security posted, 1 in study
- Brightside Solar Alt POI 23INR0487 · Solar · 50 MW · Signed; security posted
- Anagram Solar 25INR0621 · Solar · 131 MW · In study
West George (5690) 69 kV 2 requests · 82 MW2 in study
- Buck Ranch Solar SLF 27INR0375 · Solar · 41 MW · In study
- Buck Ranch Storage SLF 27INR0376 · Battery storage · 41 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Live Oak County
- Live Oak County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 14, Corpus Christi: 500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318, 361-881-6900; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Live Oak County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Live Oak County.
Permits and reviews for Live Oak County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Live Oak County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Live Oak County connects to the grid
Live Oak County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Live Oak County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Live Oak County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 14
Aransas · Bee · Calhoun · DeWitt · Goliad · Gonzales · Jackson · Jim Wells · Kleberg · Lavaca · Nueces · Refugio · San Patricio · Victoria