Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
11 proposed energy projects from ERCOT's September 2026 report, plus who to call in Goliad County and in TCEQ Region 14 before signing a solar, wind, or battery storage lease.
Check land in Goliad CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Goliad County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Goliad County?
ERCOT's September 2026 interconnection report lists 11 proposed energy projects in Goliad County (6 solar and 5 battery storage), about 1,711 MW in all. 5 of the 11 have a signed interconnection agreement, and 1 has been approved for energization or synchronization. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.
What stands out in Goliad County
By capacity, solar leads in Goliad County with 1,246 MW across 6 projects, followed by battery storage (5 projects, 465 MW); 3 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is Diablo Campo Storage, a 314 MW stand-alone battery storage project listed under Diablo Campo Energy Center, LLC, still in study, and its target online date is Sep 2029. Of the 11, 6 are still in ERCOT's study process, 4 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (4 projects), 138 kV (3 projects) and 69 kV (2 projects) (why the voltage matters). Keys Hollow Solar, LLC is listed on the most projects here (4 of 11); 8 different companies appear in all. Target online dates for the projects not yet running span Mar 2028 to Sep 2029. All of them fall in ERCOT's South load zone. 2 that were listed in August have since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Tulsita SolarTap 138kV 8590 Tuleta - 8595 Euler | Ray Ranch Solar LLC | Solar | 256.2 | Sep 2026 | Approved for synchronization |
| KEYS HOLLOW SOLAR SLFTAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673 · shared with 1 other request | Keys Hollow Solar, LLC | Solar | 200.8 | Mar 2028 | Signed; security posted |
| KEYS HOLLOW STORAGE SLFTAP 345 KV LINE FROM COLETO 8164 - RAPTOR7A 8673 · shared with 1 other request | Keys Hollow Solar, LLC | Battery storage (paired with solar) | Self-limiting | Mar 2028 | Signed; security posted |
| Keys Hollow Solar Phase II SLF345kV Tap 8164 Coleto Creek - 8673 RAPTOR7A · shared with 1 other request | Keys Hollow Solar, LLC | Solar | 200.8 | Mar 2028 | Signed; security posted |
| Keys Hollow Storage Phase II SLF345kV Tap 8164 Coleto Creek - 8673 RAPTOR7A · shared with 1 other request | Keys Hollow Solar, LLC | Battery storage (paired with solar) | Self-limiting | Mar 2028 | Signed; security posted |
| Coleto Creek - Fuel Change Only8162 Coleto Creek 138kV | COLETO CREEK POWER LLC | Gas steam turbine | 655.0 | Dec 2026 | In study |
| Double A Solar SLFTap 69kV 5678 Schroeder - 5675 Big Oak · shared with 1 other request | Double A Solar, LLC | Solar | 132.6 | May 2028 | In study |
| Double A Storage SLFTap 69kV 5678 Schroeder - 5675 Big Oak · shared with 1 other request | Double A Storage, LLC | Battery storage (paired with solar) | Self-limiting | May 2028 | In study |
| Kuy Creek Solar 1 SLFTap Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1 | Kuy Creek Solar 1 LLC | Solar | 234.9 | Mar 2029 | In study |
| Kuy Creek Storage 1 SLFTap - Coleto Creek (Bus # 8162) - Victoria (Bus# 8172) 138 kV CKT 1 | Kuy Creek Storage 1 LLC | Battery storage (paired with solar) | 151.5 | Mar 2029 | In study |
| Angel City SolarColeto Creek (# 8164) AEP – Pawnee (#5725) STEC, 25.9 miles from Co... | Angel City Energy Center, LLC | Solar | 221.0 | Sep 2029 | In study |
| Diablo Campo StorageThe Coleto Greek (#8164) to Pawnee Switching Station (#5725) ; LCRA | Diablo Campo Energy Center, LLC | Battery storage (stand-alone) | 313.5 | Sep 2029 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- PEREGRINE BESS, battery storage, 150 MW (CED Development Inc.)
- Peregrine BESS 2, battery storage, 150 MW (CED Development Inc.)
Crowded connection points in Goliad County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
COLETO7A (8164) 345 kV 12 requests · 1,545 MW · 6 in Goliad County, 6 in Karnes8 in study, 4 signed; security posted
- Keys Hollow Solar Phase II SLF 24INR0065 · Solar · 201 MW · Signed; security posted
- KEYS HOLLOW SOLAR SLF 24INR0067 · Solar · 201 MW · Signed; security posted
- Keys Hollow Storage Phase II SLF 24INR0066 · Battery storage · 0 MW · Signed; security posted
- KEYS HOLLOW STORAGE SLF 24INR0068 · Battery storage · 0 MW · Signed; security posted
- Diablo Campo Storage 27INR0149 · Battery storage · 314 MW · In study
- Angel City Solar 27INR0144 · Solar · 221 MW · In study
- Charro Creek Solar 1 SLF 26INR0068 · Solar · 203 MW · In study · Karnes
- Charro Creek Solar 2 SLF 26INR0070 · Solar · 203 MW · In study · Karnes
- Charro Creek Solar 3 SLF 26INR0072 · Solar · 203 MW · In study · Karnes
- Charro Creek Storage 1 SLF 26INR0069 · Battery storage · 0 MW · In study · Karnes
- Charro Creek Storage 2 SLF 26INR0071 · Battery storage · 0 MW · In study · Karnes
- Charro Creek Storage 3 SLF 26INR0073 · Battery storage · 0 MW · In study · Karnes
RAPTOR7A (8673) 345 kV 4 requests · 402 MW4 signed; security posted
- Keys Hollow Solar Phase II SLF 24INR0065 · Solar · 201 MW · Signed; security posted
- KEYS HOLLOW SOLAR SLF 24INR0067 · Solar · 201 MW · Signed; security posted
- Keys Hollow Storage Phase II SLF 24INR0066 · Battery storage · 0 MW · Signed; security posted
- KEYS HOLLOW STORAGE SLF 24INR0068 · Battery storage · 0 MW · Signed; security posted
PAWNEESW5 (5725) 345 kV 11 requests · 1,752 MW · 2 in Goliad County, 9 in Karnes, Bee11 in study
- Diablo Campo Storage 27INR0149 · Battery storage · 314 MW · In study
- Angel City Solar 27INR0144 · Solar · 221 MW · In study
- Zunkerville BESS 28INR0442 · Battery storage · 207 MW · In study · Karnes
- Charro Creek Solar 1 SLF 26INR0068 · Solar · 203 MW · In study · Karnes
- Charro Creek Solar 2 SLF 26INR0070 · Solar · 203 MW · In study · Karnes
- Charro Creek Solar 3 SLF 26INR0072 · Solar · 203 MW · In study · Karnes
- BumbleBee Solar 26INR0412 · Solar · 201 MW · In study · Bee
- Zunkerville Solar 28INR0443 · Solar · 201 MW · In study · Karnes
- Charro Creek Storage 1 SLF 26INR0069 · Battery storage · 0 MW · In study · Karnes
- Charro Creek Storage 2 SLF 26INR0071 · Battery storage · 0 MW · In study · Karnes
- Charro Creek Storage 3 SLF 26INR0073 · Battery storage · 0 MW · In study · Karnes
Schroeder (5678) 69 kV 2 requests · 133 MW2 in study
- Double A Solar SLF 27INR0248 · Solar · 133 MW · In study
- Double A Storage SLF 27INR0257 · Battery storage · 0 MW · In study
Big Oak (5675) 69 kV 2 requests · 133 MW2 in study
- Double A Solar SLF 27INR0248 · Solar · 133 MW · In study
- Double A Storage SLF 27INR0257 · Battery storage · 0 MW · In study
Coleto Creek (8162) 138 kV 3 requests · 1,041 MW3 in study
- Coleto Creek - Fuel Change Only 26INR0664 · Gas steam turbine · 655 MW · In study
- Kuy Creek Solar 1 SLF 28INR0303 · Solar · 235 MW · In study
- Kuy Creek Storage 1 SLF 28INR0304 · Battery storage · 151 MW · In study
Victoria (8172) 138 kV 5 requests · 871 MW · 2 in Goliad County, 3 in Victoria5 in study
- Kuy Creek Solar 1 SLF 28INR0303 · Solar · 235 MW · In study
- Marcos Solar SLF 27INR0169 · Solar · 216 MW · In study · Victoria
- Tejano Storage 24INR0168 · Battery storage · 152 MW · In study · Victoria
- Kuy Creek Storage 1 SLF 28INR0304 · Battery storage · 151 MW · In study
- Marcos BESS 27INR0170 · Battery storage · 116 MW · In study · Victoria
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Goliad County
- Goliad County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 14, Corpus Christi: 500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318, 361-881-6900; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Goliad County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Goliad County.
Permits and reviews for Goliad County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Goliad County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Goliad County connects to the grid
Goliad County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Goliad County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Goliad County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 14
Aransas · Bee · Calhoun · DeWitt · Gonzales · Jackson · Jim Wells · Kleberg · Lavaca · Live Oak · Nueces · Refugio · San Patricio · Victoria