Kleberg County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
2 proposed energy projects from ERCOT's September 2026 report, plus who to call in Kleberg County and in TCEQ Region 14 before signing a solar, wind, or battery storage lease.
Check land in Kleberg CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Kleberg County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Kleberg County?
ERCOT's September 2026 interconnection report lists 2 proposed energy projects in Kleberg County (1 solar and 1 battery storage), about 340 MW in all. 1 of the 2 has a signed interconnection agreement.
What stands out in Kleberg County
By capacity, solar leads in Kleberg County with 265 MW across 1 project, followed by battery storage (1 project, 75 MW). The largest single project is Santa Garcias Solar, a 265 MW solar project listed under Oxy Renewable Energy LLC, with an interconnection agreement signed in Dec 2025, and its target online date is May 2029. Of the 2, 1 is still in ERCOT's study process and 1 has a signed interconnection agreement but no security posted yet. Connection points are mostly at 69 kV (1 project) and 138 kV (1 project) (why the voltage matters). Target online dates for the projects not yet running span May 2028 to May 2029. All of them fall in ERCOT's Coastal load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Santa Garcias SolarTap 138kV 8515 Alazan - 8458 Barney Davis | Oxy Renewable Energy LLC | Solar | 265.0 | May 2029 | Signed Dec 2025 |
| French Riviera Storage5646 Riviera Substation 69kV | Arana Creek Battery Storage LLC | Battery storage (stand-alone) | 75.0 | May 2028 | In study |
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Kleberg County
- Kleberg County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 14, Corpus Christi: 500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318, 361-881-6900; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Kleberg County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Kleberg County.
Permits and reviews for Kleberg County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Kleberg County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Kleberg County connects to the grid
Kleberg County is on the ERCOT grid. The projects listed above are in ERCOT's Coastal load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Kleberg County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Kleberg County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 14
Aransas · Bee · Calhoun · DeWitt · Goliad · Gonzales · Jackson · Jim Wells · Lavaca · Live Oak · Nueces · Refugio · San Patricio · Victoria