Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Refugio County

Refugio County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects4
Total capacity2,034MW
Signed agreements3of 4
New since August0requests

4 proposed energy projects from ERCOT's September 2026 report, plus who to call in Refugio County and in TCEQ Region 14 before signing a solar, wind, or battery storage lease.

Check land in Refugio CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Refugio County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Refugio County?

ERCOT's September 2026 interconnection report lists 4 proposed energy projects in Refugio County (2 solar and 2 battery storage), about 2,034 MW in all. 3 of the 4 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.

What stands out in Refugio County

By capacity, solar leads in Refugio County with 1,423 MW across 2 projects, followed by battery storage (2 projects, 612 MW). The largest single project is Ross Solar, a 1,026 MW solar project listed under S&S Renewables, LLC, with an interconnection agreement signed in Jun 2024, and its target online date is Jul 2027. Of the 4, 1 is still in ERCOT's study process, 2 have a signed interconnection agreement but no security posted yet and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (3 projects) and 69 kV (1 project) (why the voltage matters). S&S Renewables, LLC is listed on the most projects here (2 of 4); 3 different companies appear in all. Target online dates for the projects not yet running span Jul 2027 to Mar 2028. All of them fall in ERCOT's Coastal load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Charger Solartap 345kV 8249 Angstrom – 5915 STPAP Solar 4, LLCSolar397.1Sep 2026Approved for synchronization
Ross Solartap 345kV 8249 Angstrom – 8676 StaticS&S Renewables, LLCSolar1,025.6Jul 2027Signed Jun 2024
Ross Storagetap the 345 kV Angstrom (#8249) – Static (#8676) line; AEPS&S Renewables, LLCBattery storage (paired with solar)511.0Jul 2027Signed Jun 2024
Mobee Springs BESS#8805 BONIVIEW2A 69kVMobee Springs, LLCBattery storage (stand-alone)100.6Mar 2028In study

Crowded connection points in Refugio County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Angstrom (8249) 345 kV 10 requests · 3,749 MW · 3 in Refugio County, 7 in San Patricio3 signed; security posted, 3 signed, 3 in study, 1 approved for synchronization
  • Charger Solar 23INR0047 · Solar · 397 MW · Approved for synchronization
  • SanPat Solar I 25INR0081 · Solar · 309 MW · Signed; security posted · San Patricio
  • SanPat Solar II 25INR0052 · Solar · 256 MW · Signed; security posted · San Patricio
  • Diamond Cowboy Storage 26INR0428 · Battery storage · 104 MW · Signed; security posted · San Patricio
  • Ross Solar 26INR0155 · Solar · 1,026 MW · Signed Jun 2024
  • Ross Storage 26INR0156 · Battery storage · 511 MW · Signed Jun 2024
  • Titus Low Carbon Ventures Solar 1 26INR0211 · Solar · 338 MW · Signed May 2026 · San Patricio
  • Gulf Gateway Solar One 27INR0492 · Solar · 301 MW · In study · San Patricio
  • Gulf Gateway Storage One 27INR0556 · Battery storage · 301 MW · In study · San Patricio
  • Alila BESS II 29INR0207 · Battery storage · 206 MW · In study · San Patricio
STATIC7A (8676) 345 kV 6 requests · 4,217 MW · 2 in Refugio County, 4 in Victoria3 signed, 3 in study
  • Ross Solar 26INR0155 · Solar · 1,026 MW · Signed Jun 2024
  • Ross Storage 26INR0156 · Battery storage · 511 MW · Signed Jun 2024
  • Iguala Solar 23INR0090 · Solar · 250 MW · Signed Jul 2025 · Victoria
  • Blue Energy Center - Phase 3 – Steam Stage 2 33INR0007 · Nuclear · 1,320 MW · In study · Victoria
  • Blue Energy Center- Phase 1a - Gas 30INR0150 · Gas turbine · 780 MW · In study · Victoria
  • Blue Energy Center - Phase 1b – Steam 29INR0248 · Gas combined cycle · 330 MW · In study · Victoria

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Refugio County

  • Refugio County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 14, Corpus Christi: 500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318, 361-881-6900; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Refugio County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Refugio County.

Permits and reviews for Refugio County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Refugio County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Refugio County connects to the grid

Refugio County is on the ERCOT grid. The projects listed above are in ERCOT's Coastal load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Refugio County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Refugio County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 14

Aransas · Bee · Calhoun · DeWitt · Goliad · Gonzales · Jackson · Jim Wells · Kleberg · Lavaca · Live Oak · Nueces · San Patricio · Victoria

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources