Calhoun County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects4
Total capacity850MW
Signed agreements1of 4
New since August0requests

4 proposed energy projects from ERCOT's September 2026 report, plus who to call in Calhoun County and in TCEQ Region 14 before signing a solar, wind, or battery storage lease.

Check land in Calhoun CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Calhoun County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Calhoun County?

ERCOT's September 2026 interconnection report lists 4 proposed energy projects in Calhoun County (2 solar and 2 battery storage), about 850 MW in all. 1 of the 4 has a signed interconnection agreement, and 1 has been approved for energization or synchronization.

What stands out in Calhoun County

By capacity, solar leads in Calhoun County with 542 MW across 2 projects, followed by battery storage (2 projects, 308 MW). The largest single project is HyFuels Green Lake Solar, a 347 MW solar project listed under HyFuels Green Lake Solar LLC, still in study, and its target online date is Dec 2027. Of the 4, 3 are still in ERCOT's study process and 1 is approved for energization or synchronization. Every listed connection point is on the 138 kV system (why the voltage matters). Each of the 4 projects is listed under a different company. Target online dates for the projects not yet running span Dec 2027 to Jul 2029. All of them fall in ERCOT's Coastal load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Tres Bahias Solar8140 Joslin 138kVTres Bahias Solar Power LLCSolar195.0Aug 2026Approved for synchronization
HyFuels Green Lake SolarDokmai 138kV Substation (bus #80090) · shared with 1 other requestHyFuels Green Lake Solar LLCSolar347.0Dec 2027In study
Wolfram StorageDokmai 138kV Substation (bus #80090) · shared with 1 other requestNova Clean Energy, LLCBattery storage (stand-alone)206.6Dec 2027In study
Vaca Storage138kV 8723 CangrejoLong Mount Storage, LLCBattery storage (stand-alone)101.0Jul 2029In study

Crowded connection points in Calhoun County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Dokmai (80090) 138 kV 3 requests · 831 MW · 2 in Calhoun County, 1 in Victoria2 in study, 1 signed; security posted
  • Crossroads Wind 26INR0021 · Wind · 277 MW · Signed; security posted · Victoria
  • HyFuels Green Lake Solar 26INR0019 · Solar · 347 MW · In study
  • Wolfram Storage 27INR0466 · Battery storage · 207 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Calhoun County

  • Calhoun County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 14, Corpus Christi: 500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318, 361-881-6900; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Calhoun County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Calhoun County.

Permits and reviews for Calhoun County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Calhoun County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Calhoun County connects to the grid

Calhoun County is on the ERCOT grid. The projects listed above are in ERCOT's Coastal load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Calhoun County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Calhoun County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 14

Aransas · Bee · DeWitt · Goliad · Gonzales · Jackson · Jim Wells · Kleberg · Lavaca · Live Oak · Nueces · Refugio · San Patricio · Victoria

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.