12 proposed energy projects from ERCOT's September 2026 report, plus who to call in Bee County and in TCEQ Region 14 before signing a solar, wind, or battery storage lease.
Check land in Bee CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Bee County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Bee County?
ERCOT's September 2026 interconnection report lists 12 proposed energy projects in Bee County (5 solar, 1 wind and 6 battery storage), about 1,839 MW in all. 6 of the 12 have a signed interconnection agreement, and 1 has been approved for energization or synchronization.
What stands out in Bee County
By capacity, solar leads in Bee County with 875 MW across 5 projects, followed by battery storage (6 projects, 696 MW) and wind (1 project, 268 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Argenta Solar, a 310 MW solar project listed under Charter Oak Solar, LLC, with its agreement signed and security posted, and its target online date is Jun 2028. Of the 12, 6 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet, 4 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (6 projects), 69 kV (4 projects) and 138 kV (2 projects) (why the voltage matters). BT Myers Solar, LLC is listed on the most projects here (2 of 12); 11 different companies appear in all. Target online dates for the projects not yet running span Feb 2027 to Mar 2031. All of them fall in ERCOT's South load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Foxtrot WindAEP 88689 Tango 345kV station | Lincoln Clean | Wind | 268.2 | Dec 2026 | Approved for synchronization |
| Honeycomb Solar SLF69 kV Tynan Substation (#8107) · shared with 1 other request | Honeycomb Solar, LLC | Solar | 61.4 | Feb 2027 | Signed; security posted |
| Honeycomb Storage SLF69 kV Tynan Substation (#8107) · shared with 1 other request | Honeycomb BESS, LLC | Battery storage (paired with solar) | Self-limiting | May 2027 | Signed; security posted |
| Argenta SolarTap 345kV 8689 Tango - 8606 Goddard · shared with 1 other request | Charter Oak Solar, LLC | Solar | 310.0 | Jun 2028 | Signed; security posted |
| Argenta StorageTap 345kV 8689 Tango - 8606 Goddard · shared with 1 other request | Charter Oak Storage, LLC | Battery storage (paired with solar) | 192.0 | Jun 2028 | Signed; security posted |
| Abeja Solar FarmTap 345kV 8012 PALADIO7A - 8689 TANGO7A | Abeja Solar Farm LLC | Solar | 200.8 | Jun 2029 | Signed Dec 2025 |
| Orchard Ray BESS8590 Tuleta 138kV | Pettus BESS | Battery storage (stand-alone) | 51.9 | May 2027 | In study |
| Myers Solar8629 Baez 69 kV · shared with 1 other request | BT Myers Solar, LLC | Solar | 101.6 | May 2028 | In study |
| Myers Storage8629 Baez 69 kV · shared with 1 other request | BT Myers Solar, LLC | Battery storage (paired with solar) | 76.0 | May 2028 | In study |
| Spinner Energy Storage8196 Poesta Substation 138kV | GCI Wolf Energy Storage, LLC | Battery storage (stand-alone) | 125.6 | Jul 2029 | In study |
| Sparta BESS88690 SPTPOI7A 345kV | Sparta Storage Center | Battery storage (stand-alone) | 250.9 | Dec 2029 | In study |
| BumbleBee SolarTap 345kV 5725 PawneeSW5 - 8689 Tango | BumbleBee Solar Farm LLC | Solar | 200.9 | Mar 2031 | In study |
Crowded connection points in Bee County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Tango (8689) 345 kV 4 requests · 904 MW2 signed; security posted, 1 in study, 1 signed
- Argenta Solar 25INR0060 · Solar · 310 MW · Signed; security posted
- Argenta Storage 25INR0061 · Battery storage · 192 MW · Signed; security posted
- Abeja Solar Farm 27INR0372 · Solar · 201 MW · Signed Dec 2025
- BumbleBee Solar 26INR0412 · Solar · 201 MW · In study
Bus 8107 (8107) 69 kV 2 requests · 61 MW2 signed; security posted
- Honeycomb Solar SLF 22INR0559 · Solar · 61 MW · Signed; security posted
- Honeycomb Storage SLF 23INR0392 · Battery storage · 0 MW · Signed; security posted
Goddard (8606) 345 kV 6 requests · 1,284 MW · 2 in Bee County, 4 in San Patricio3 in study, 3 signed; security posted
- Argenta Solar 25INR0060 · Solar · 310 MW · Signed; security posted
- Bayou Creek Solar 28INR0223 · Solar · 257 MW · Signed; security posted · San Patricio
- Argenta Storage 25INR0061 · Battery storage · 192 MW · Signed; security posted
- San Patricio Energy Center BESS 29INR0227 · Battery storage · 301 MW · In study · San Patricio
- Kalina Solar 22INR0392 · Solar · 120 MW · In study · San Patricio
- Kalina Storage 29INR0106 · Battery storage · 105 MW · In study · San Patricio
Baez (8629) 69 kV 2 requests · 178 MW2 in study
- Myers Solar 26INR0134 · Solar · 102 MW · In study
- Myers Storage 26INR0135 · Battery storage · 76 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Bee County
- Bee County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 14, Corpus Christi: 500 North Shoreline Blvd, Ste 500, Corpus Christi TX 78401-0318, 361-881-6900; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Bee County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Bee County.
Permits and reviews for Bee County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Bee County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Bee County connects to the grid
Bee County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Bee County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Bee County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 14
Aransas · Calhoun · DeWitt · Goliad · Gonzales · Jackson · Jim Wells · Kleberg · Lavaca · Live Oak · Nueces · Refugio · San Patricio · Victoria