Karnes County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects13
Total capacity1,876MW
Signed agreements0of 13
New since August0requests

13 proposed energy projects from ERCOT's September 2026 report, plus who to call in Karnes County and in TCEQ Region 13 before signing a solar, wind, or battery storage lease.

Check land in Karnes CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Karnes County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Karnes County?

ERCOT's September 2026 interconnection report lists 13 proposed energy projects in Karnes County (6 solar and 7 battery storage), about 1,876 MW in all. None has a signed interconnection agreement yet.

What stands out in Karnes County

By capacity, solar leads in Karnes County with 1,111 MW across 6 projects, followed by battery storage (7 projects, 766 MW); 3 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is Zunkerville BESS, a 207 MW battery storage paired with solar project listed under Zunkerville Energy, LLC, still in study, and its target online date is Dec 2029. Of the 13, 13 are still in ERCOT's study process. Connection points are mostly at 345 kV (7 projects) and 138 kV (2 projects) (why the voltage matters). The single most-used connection point is Tap 345kV 5725 PAWNEESW5 - 8164 COLETO7A, shared by 5 projects. Charro Creek Solar LLC is listed on the most projects here (6 of 13); 7 different companies appear in all. Target online dates for the projects not yet running span Dec 2027 to Sep 2030. All of them fall in ERCOT's South load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Tarim BESS5727 Pawnee Switching Substation 138kVBRP Tarim BESS LLCBattery storage (stand-alone)201.0Dec 2027In study
Daystar Solar5728 Choate 138kVChoate Solar, LLCSolar150.0Sep 2028In study
Zunkerville BESS345kV BUS #5725 PAWNEE SWITCHING STATIONZunkerville Energy, LLCBattery storage (paired with solar)206.7Dec 2029In study
Zunkerville Solar#5725 PAWNEE SWITCHING STATION 345kVZunkerville Energy, LLCSolar200.7Dec 2029In study
Charro Creek Solar 1 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7A · shared with 4 other requestsCharro Creek Solar LLCSolar203.0Dec 2029In study
Charro Creek Solar 2 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7A · shared with 4 other requestsCharro Creek Solar LLCSolar203.0Dec 2029In study
Charro Creek Solar 3 SLFTap on PAWNEESW5 (#5725) - COLETO7A (#8164) LineCharro Creek Solar LLCSolar203.0Dec 2029In study
Charro Creek Storage 1 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7A · shared with 4 other requestsCharro Creek Solar LLCBattery storage (paired with solar)Self-limitingDec 2029In study
Charro Creek Storage 2 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7A · shared with 4 other requestsCharro Creek Solar LLCBattery storage (paired with solar)Self-limitingDec 2029In study
Charro Creek Storage 3 SLFTap 345kV 5725 PAWNEESW5 - 8164 COLETO7A · shared with 4 other requestsCharro Creek Solar LLCBattery storage (paired with solar)Self-limitingDec 2029In study
White Star Energy StorageMilton Substation 78583 L_MILTON8_1YWhite Star Energy Storage, LLCBattery storage (stand-alone)201.2Dec 2029In study
Coyote Den StorageThe Kenedy Switching Station #2 (#8186) to Rosata POD (#8153) Line...Coyote Den Energy Center, LLCBattery storage (stand-alone)156.9Sep 2030In study
New Shepherd Solarthe Kenedy Switching Station #2 (#8186) – Rosata POD (#8153) line,...New Shepherd Energy Center, LLCSolar150.8Sep 2030In study

Crowded connection points in Karnes County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

PAWNEESW5 (5725) 345 kV 11 requests · 1,752 MW · 8 in Karnes County, 3 in Goliad, Bee11 in study
  • Diablo Campo Storage 27INR0149 · Battery storage · 314 MW · In study · Goliad
  • Angel City Solar 27INR0144 · Solar · 221 MW · In study · Goliad
  • Zunkerville BESS 28INR0442 · Battery storage · 207 MW · In study
  • Charro Creek Solar 1 SLF 26INR0068 · Solar · 203 MW · In study
  • Charro Creek Solar 2 SLF 26INR0070 · Solar · 203 MW · In study
  • Charro Creek Solar 3 SLF 26INR0072 · Solar · 203 MW · In study
  • BumbleBee Solar 26INR0412 · Solar · 201 MW · In study · Bee
  • Zunkerville Solar 28INR0443 · Solar · 201 MW · In study
  • Charro Creek Storage 1 SLF 26INR0069 · Battery storage · 0 MW · In study
  • Charro Creek Storage 2 SLF 26INR0071 · Battery storage · 0 MW · In study
  • Charro Creek Storage 3 SLF 26INR0073 · Battery storage · 0 MW · In study
COLETO7A (8164) 345 kV 12 requests · 1,545 MW · 6 in Karnes County, 6 in Goliad8 in study, 4 signed; security posted
  • Keys Hollow Solar Phase II SLF 24INR0065 · Solar · 201 MW · Signed; security posted · Goliad
  • KEYS HOLLOW SOLAR SLF 24INR0067 · Solar · 201 MW · Signed; security posted · Goliad
  • Keys Hollow Storage Phase II SLF 24INR0066 · Battery storage · 0 MW · Signed; security posted · Goliad
  • KEYS HOLLOW STORAGE SLF 24INR0068 · Battery storage · 0 MW · Signed; security posted · Goliad
  • Diablo Campo Storage 27INR0149 · Battery storage · 314 MW · In study · Goliad
  • Angel City Solar 27INR0144 · Solar · 221 MW · In study · Goliad
  • Charro Creek Solar 1 SLF 26INR0068 · Solar · 203 MW · In study
  • Charro Creek Solar 2 SLF 26INR0070 · Solar · 203 MW · In study
  • Charro Creek Solar 3 SLF 26INR0072 · Solar · 203 MW · In study
  • Charro Creek Storage 1 SLF 26INR0069 · Battery storage · 0 MW · In study
  • Charro Creek Storage 2 SLF 26INR0071 · Battery storage · 0 MW · In study
  • Charro Creek Storage 3 SLF 26INR0073 · Battery storage · 0 MW · In study
Bus 8186 (8186) 2 requests · 308 MW2 in study
  • Coyote Den Storage 27INR0151 · Battery storage · 157 MW · In study
  • New Shepherd Solar 27INR0152 · Solar · 151 MW · In study
Bus 8153 (8153) 2 requests · 308 MW2 in study
  • Coyote Den Storage 27INR0151 · Battery storage · 157 MW · In study
  • New Shepherd Solar 27INR0152 · Solar · 151 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Karnes County

  • Karnes County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 13, San Antonio: 14250 Judson Rd, San Antonio TX 78233-4480, 210-490-3096; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Karnes County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Karnes County.

Permits and reviews for Karnes County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Karnes County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Karnes County connects to the grid

Karnes County is on the ERCOT grid. The projects listed above are in ERCOT's South load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Karnes County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Karnes County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 13

Atascosa · Bandera · Bexar · Comal · Edwards · Frio · Gillespie · Guadalupe · Kendall · Kerr · Medina · Real · Uvalde · Wilson

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources