Energy land, checked. Solar, wind, and storage sites — the permits and the grid in one place. Start here →Queue data: ERCOT, September 2026 · Outage data: EIA-861, 2025
Parcel & Grid

Home › Guides › How to apply

How to get a TxDOT driveway permit and utility accommodation approval

Updated

General information, not a substitute for the advice of an attorney.

Who grants it: The TxDOT district office for the county (the report names the district).

When it applies: A new or changed driveway onto a state-maintained road, and any utility line crossing or running in state right of way. County roads are the county's; see the county road-use guide.

What the application asks for, and where to find it

The application asks forWhere you find itHow
Location of the proposed driveway (highway, reference marker, side)Your engineerFrom the site plan; the report's map shows the state road and the coordinates.
Description of the proposed workYour engineerDriveway geometrics, drainage, and any utility installation from the civil design.
Applicant name, mailing address, telephoneYou (the applicant)The property owner or an authorized representative applies (the manual says so); a lessee applies with the owner's authorization.
Owner authorizationThe landownerWritten authorization when the applicant is not the owner.
Drainage effect on the highwayYour engineerTxDOT must approve drainage impacts before any local approval.
Utility line details for a gen-tie or cableYour engineerRoute, depth or height, voltage, pole locations, from the electrical design.
What the "where you find it" column means
This site: the land report
Run the spot on the land report; the value is on the page named, with its agency source.
Appraisal district (tax assessor)
The county appraisal district record: property ID, legal description, acreage, owner of record, agricultural valuation. The report's Lease page links it; the Permits page lists the district's phone.
The landowner
Only the owner can supply it: signed authorization, deed reference, existing leases, access, their contact details.
Your engineer
From your civil or electrical engineer: site plan, disturbed acreage, drainage, the electrical one-line, nameplate and inverter data, structure heights.
Surveyor or title company
Boundary survey, legal description for recording, easements of record, title commitment.
The agency's website
The agency publishes it: forms, fee schedules, community numbers, district offices, portal accounts.
You (the applicant)
Your entity details: legal name, address, signatory, contacts, FEIN, insurance.

How to file it

  1. Find the district in the TxDOT district list and contact its permit office (the report lists the district phone).
  2. File Form 1058, the permit to construct access driveway facilities, with the description and location; see the Access Management Manual for what TxDOT reviews.
  3. For a utility installation in the right of way, file the district's utility installation request with the route drawings; TxDOT's Utility Accommodation Rules govern.
  4. No work in the right of way until the permit is fully executed and TxDOT has had 24 hours' notice; a TxDOT inspector accepts the work.

The pages you will use

Open: TxDOT districts →
TxDOT districts (screenshot captured monthly from the agency page)
Open: Access Management Manual: permits →
Access Management Manual: permits (screenshot captured monthly from the agency page)
Open: Form 1058 (PDF) →
Form 1058 (PDF) (screenshot captured monthly from the agency page)

Official pages cited

How-to guidance from the agency pages linked above, not legal advice; forms, fees and offices change, so confirm with the office before filing. The land report fills in the site facts; the rest comes from the sources named in each row.

General information from the sources linked above, not legal, tax, or financial advice.

Sources and helpful links

More official contacts and resources: Helpful links.

Browse resources