Texas: every permit portal for solar, wind, and storage

Links checked October 24, 2026 · Official sites only · Pick another state

The quick find: which office handles each approval a utility-scale project touches in Texas, with the agency's own page. Counties and cities add their own land-use approvals; the state table is the part that is the same across the state.

County-by-county detail for Texas: proposed projects and contacts by county · Texas permits by county · the twelve Texas approvals, stage by stage.

State and grid

ApprovalWhere to go
State siting or certificateWhether the state itself approves where a generating facility goes, or leaves it to counties and cities.No state siting permit; counties cannot zone outside cities — see the Texas permit hubTexas county governments (no state siting permit)
Grid interconnectionThe queue the project enters to connect: the regional grid operator, or the utility and public utility commission outside an RTO.Resource IntegrationElectric Reliability Council of TexasERCOT resource integration/generator interconnection process page (search returned this path rather than /services/rq/re/ri).
Construction stormwater permitNPDES coverage for land disturbance of one acre or more, before earthwork starts.Stormwater General Permit for Construction ActivitiesTexas Commission on Environmental QualityTPDES Construction General Permit TXR150000 program page (NOI, SWPPP requirements).
Historic preservation reviewSection 106 consultation through the State Historic Preservation Office when a federal permit, federal funding or federal land is involved; many states add their own review on state land.How the THC Reviews ProjectsTexas Historical CommissionSHPO Section 106 and Antiquities Code project review consultation process.
Wildlife and habitat reviewThe state wildlife agency's project screening or natural-heritage data request; federal species go through USFWS IPaC.Environmental Review Team (Wildlife Habitat Assessment)Texas Parks and Wildlife DepartmentTPWD environmental review and TXNDD rare-resources data requests for project screening.
State road access and utility permitsA driveway onto a state highway, and a gen-tie or cable in state right of way.Access Management Manual: Driveway PermitsTexas Department of TransportationTxDOT access/driveway permit requirements for connections to state highways.
Floodplain (state NFIP coordinator)Local floodplain development permits are county or city; the state coordinator lists who administers them.Flood Community Assistance Program (NFIP)Texas Water Development BoardTWDB is the NFIP state coordinating agency for Texas.
Water rights and wellsConstruction water, dust control and O&M wells: the state engineer, water board or environmental agency.Surface Water Rights and AvailabilityTexas Commission on Environmental QualitySurface water rights permitting; groundwater wells are permitted by local groundwater conservation districts and drillers licensed by TDLR.
Property-tax incentive programState abatement or exemption programs for renewable generation, where one exists.Chapter 312 Property Tax Abatements FAQTexas Comptroller of Public AccountsLocal Tax Code Chapter 312 abatement agreements registered with the Comptroller; Chapter 313 expired in 2022.

Federal portals (the same in every state)

ApprovalWhere to go
Clean Water Act Section 404 / Rivers and Harbors Act Section 10U.S. Army Corps of EngineersRegulatory Request System: applications, pre-application meetings and jurisdictional determinations; the district office is by watershed.
Endangered species and critical habitatU.S. Fish and Wildlife ServiceIPaC: official species list and the Section 7 consultation path for the project footprint.
Tall structures (wind turbines, met towers)Federal Aviation AdministrationForm 7460-1 notice through OE/AAA before construction above the 14 CFR 77.9 heights.
Construction stormwater where EPA is the permitting authorityU.S. EPAEPA's Construction General Permit (NeT eNOI) in New Mexico, Massachusetts, New Hampshire, D.C., Indian country and the territories.
Projects on federal landBureau of Land ManagementRight-of-way applications and NEPA documents for BLM-managed land.
Transmission and wholesale market rulesFederal Energy Regulatory CommissionOrder No. 2023 cluster-study reforms, followed by every FERC-jurisdictional transmission provider, RTO or utility; ERCOT has its own process.

County and city pages for Texas

From the nationwide permit finder; counties and cities issue most land-use approvals, so start with the jurisdiction that covers the parcel.

Other states

How this list is made. Each link was found on the agency's own site and is re-checked by a script that loads it and records the date; a link that stops answering is shown without a link rather than dropped. Programs change with each legislative session: confirm fees, forms and thresholds on the agency page before filing. General information, not legal advice. How we check our data · Report an error.

Browse resources