Home › Texas › Brazoria County
Brazoria County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
53 proposed energy projects from ERCOT's September 2026 report, plus who to call in Brazoria County and in TCEQ Region 12 before signing a solar, wind, or battery storage lease.
Check land in Brazoria CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Brazoria County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Brazoria County?
ERCOT's September 2026 interconnection report lists 53 proposed energy projects in Brazoria County (12 solar, 2 wind, 36 battery storage and 3 gas), about 11,167 MW in all. 30 of the 53 have a signed interconnection agreement, and 5 have been approved for energization or synchronization. The table also lists 3 changes to existing plants (repowers or capacity changes), not counted above. 2 are new since August.
What stands out in Brazoria County
By capacity, battery storage leads in Brazoria County with 5,741 MW across 36 projects, followed by solar (12 projects, 2,855 MW) and wind (2 projects, 1,744 MW); 4 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is Hecate Energy Orem Wind, a 1,542 MW wind project listed under Hecate Energy LLC, still in study, and its target online date is Jun 2030. Of the 53, 23 are still in ERCOT's study process, 14 have a signed interconnection agreement but no security posted yet, 11 have posted security or started construction and 5 are approved for energization or synchronization. Connection points are mostly at 138 kV (39 projects), 345 kV (11 projects) and 47 kV (1 project) (why the voltage matters). The single most-used connection point is tap 138kV 44600 Rosharon - 44531 Winmil, shared by 3 projects. Austin Bayou Solar, LLC is listed on the most projects here (4 of 53); 46 different companies appear in all. Target online dates for the projects not yet running span Dec 2025 to Sep 2030. All of them fall in ERCOT's Coastal load zone. 1 is new since August and 3 that were listed in August have since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| DAMON BESS3Station Name: DAMON | BarBar Storage LLC | Battery storage (stand-alone) | 10.0 | Dec 2025 | Approved for synchronization |
| DAMAZO (Second Division) SOLARTap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380)... · shared with 1 other request | TX Gulf Solar 1 LLC | Solar | 100.2 | Dec 2025 | Approved for synchronization |
| Tanglewood Solar345kV Seabreeze Substation | Brazoria Solar, LLC | Solar | 251.0 | Sep 2026 | Approved for synchronization |
| Cottonwood Bayou Solartap 138kV 42870 Liverpool - 43070 Petson | Cottonwood Bayou Solar, LLC | Solar | 351.4 | Oct 2026 | Approved for synchronization |
| Myrtle Solar42110 Angleton 138kV · shared with 1 other request | Myrtle Solar, LLC | Solar | 321.2 | Jun 2027 | Approved for synchronization |
| Austin Bayou SolarTap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27 · shared with 2 other requests | Austin Bayou Solar, LLC | Solar | 502.5 | Jun 2027 | Signed; security posted |
| Damon BESS 29.99 MW 50 MWh battery energy storage project connecting at 12.47kV... | PR DAMON, LLC | Battery storage (stand-alone) | 10.0 | Aug 2027 | Signed; security posted |
| Cradle Solartap 345kV 42500 Dow - 43035 Oasis ckt 18 | Cradle Solar LLC | Solar | 200.8 | Sep 2027 | Signed; security posted |
| First Capitol BESSTap 138kV West Columbia Main (39500) - Sweeny Cogen (110505) | First Capitol BESS, LLC | Battery storage (stand-alone) | 257.5 | Nov 2027 | Signed; security posted |
| Cascade Solar43180 SAVANAH 345 kV | Cascade Solar Energy, LLC | Solar | 171.0 | Jan 2028 | Signed; security posted |
| Skipjack Energy StorageTap 138 42980 Nash - 44010 W A Parish ckt #2 | Skipper Energy Storage LLC | Battery storage (stand-alone) | 150.6 | Feb 2028 | Signed; security posted |
| Aldrin 138 BESS(Bus: 39015) North Alvin TNMP 138kV | Aldrin Energy Storage LLC | Battery storage (stand-alone) | 207.0 | Mar 2028 | Signed; security posted |
| Aldrin 345 BESS(Bus: 43030) Meadow 345kV substation | Aldrin Energy Storage LLC | Battery storage (stand-alone) | 362.0 | Mar 2028 | Signed; security posted |
| Royal River BESSTap 138kV 42110 Angleton - 43381 West Columbia | Royal River LLC | Battery storage (stand-alone) | 310.7 | Jun 2028 | Signed; security posted |
| Elio BESS138 kV Weinbrenner Station (Bus #42990) | Elio Energy LLC | Battery storage (stand-alone) | 205.3 | Dec 2028 | Signed; security posted |
| Liatris Flexible GasTap 138 kV (42980) Nash - (44010) WA Parish CKT02 | Stone Creek Peaker LLC | Gas turbine | 204.7 | Feb 2029 | Signed; security posted |
| Byrd Ranch Repower39700 SWEENY 138kV | Byrd Ranch Storage LLC | Battery storage (stand-alone) | 5.5 | Jan 2027 | Signed Dec 2020 |
| Austin Bayou Storage ITap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27 · shared with 2 other requests | Austin Bayou Solar, LLC | Battery storage (paired with solar) | 150.7 | Jun 2027 | Signed Feb 2025 |
| Austin Bayou Storage IITap to CKT#27 from Savana (Bus# 43180) to Oasis (Bus# 43035) – 345... | Austin Bayou Solar, LLC | Battery storage (paired with solar) | 156.6 | Jun 2027 | Signed Feb 2025 |
| Austin Bayou Storage IIITap 345 kV Savana 43180 to Seabreeze 43020 - Ckt 27 · shared with 2 other requests | Austin Bayou Solar, LLC | Battery storage (paired with solar) | 156.6 | Jun 2027 | Signed Feb 2025 |
| Willow Beach WindTap 138 kV Bus# 42100 HUD_8 – Bus# 42960 MUSTNG_S04_8 138kV CKT# 4 | Capital Wind, LLC | Wind | 202.3 | Oct 2027 | Signed Jun 2025 |
| Bell Creek BESSTap 138kV 39500 West Colombia - 39703 FM524 | BELL CREEK BESS, LLC | Battery storage (stand-alone) | 200.9 | Oct 2027 | Signed Nov 2024 |
| Brazos River BESSTap 138kV 39530 West Colombia LOCAL TNP - 39560 ANGLETON TNP | Brazos River BESS LLC | Battery storage (stand-alone) | 180.4 | Oct 2027 | Signed May 2025 |
| Long Point Storage138 KV (CEHE Sub) Tap Burke (42410) - Eagle Nest (42430) ckt 02 | Long Point Storage, LLC | Battery storage (paired with solar) | 100.6 | Dec 2027 | Signed Aug 2023 |
| GAMAY ENERGY STORAGETap 138 kV Line from TNFM524 (39703) to West Columbia Main (39500),... | GAMAY ENERGY STORAGE LLC | Battery storage (stand-alone) | 418.6 | Jan 2028 | Signed May 2025 |
| Hastings Park BESS39010 138kV HASTINGS | Brazos Roots BESS, LLC | Battery storage (stand-alone) | 256.3 | Feb 2028 | Signed Aug 2025 |
| Pinewood Solar43020 Seabreeze 345kV | Brazoria Solar II, LLC | Solar | 150.7 | Feb 2028 | Signed May 2025 |
| Clutch City Solar Phase Itap 138kV 42960 Mustang Bayou – 42100 Hudson CKT #04 | HZ Solar I, LLC | Solar | 200.8 | Jul 2028 | Signed Sep 2022 |
| Clutch City Solar Phase IItap 138kV 42960 Mustang Bayou – 42100 Hudson CKT#04 | HZ SOLAR I, LLC | Solar | 251.3 | Jul 2028 | Signed Feb 2025 |
| Dan Kearney BESS39703 TNFM524 138kV | Dan Kearney BESS LLC | Battery storage (stand-alone) | 204.4 | Feb 2029 | Signed Oct 2024 |
| Margay Energy StorageTap 138kV 42750 Mykawa - 48353 Telephone Ckt 06 | PowerPulse LLC | Battery storage (stand-alone) | 101.3 | Apr 2029 | Signed Dec 2025 |
| Second Division StorageTap 138 kV SANBER_POI_8 (Bus# 43110) to WEST COLUMBIA (Bus# 43380)... · shared with 1 other request | Mound Creek Storage, LLC | Battery storage (stand-alone) | Self-limiting | Dec 2025 date passed; status per ERCOT | In study |
| Myrtle Solar Repower New42110 Angleton 138kV · shared with 1 other request | Myrtle Solar, LLC | Solar | 314.3 | Jun 2027 | In study |
| Rock N' Roll Solar SLFtap 138kV 44600 Rosharon - 44531 Winmil · shared with 2 other requests | Rock N’ Roll Solar, LLC | Solar | 152.0 | Aug 2027 | In study |
| Rock N' Roll Storage Twotap 138kV 44600 Rosharon - 44531 Winmil · shared with 2 other requests | Rock N’ Roll Solar, LLC | Battery storage (paired with solar) | 206.0 | Aug 2027 | In study |
| Marcus Energy StorageTap 138kV 39500 West Columbia Main - 110505 Sweeny Co-Gen LP Ckt 1 | Marcus Energy Storage, LLC | Battery storage (stand-alone) | 201.0 | Sep 2027 | In study |
| Pequin Energy Storage39500 TN West Columbia 138kV | Pequin Energy Storage, LLC | Battery storage (stand-alone) | 103.4 | Sep 2027 | In study |
| Cobra Clean Energy Centerlooped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42... | Cobra Clean Energy Center LLC | Battery storage (stand-alone) | 100.4 | Oct 2027 | In study |
| Bodkin BESS SLF NewThe 138kV Danbury Dab DANBUR_POI_8 (BUS#42875) Station | Bodkin BESS, LLC | Battery storage | Self-limiting | Dec 2027 | In study |
| Bulldog Power (TEF - Due Diligence)39703 TNMP FM524 Substation 138kV · shared with 1 other request | Bulldog Power LLC | Gas turbine | 311.0 | Dec 2027 | In study |
| Copano Bay Energy StorageTap 138kV 42980 Nash - 44010 WA Parish Ckt 2 | Copano Bay Energy Storage, LLC | Battery storage (stand-alone) | 201.0 | Dec 2027 | In study |
| Rubicon Power BESS39703 TNMP FM524 138kV | Rubicon Power LLC | Battery storage (stand-alone) | 301.4 | Dec 2027 | In study |
| Friendswood Energy StorageTAP 138kV 39010 HASTINGS - 38980 FRIENDSWOOD | Friendswood Energy Storage LLC | Battery storage (stand-alone) | 105.1 | Mar 2028 | In study |
| Cascade Storage345kV Oasis (43035) – Seabreeze circuit 27 | Oyster Creek LLC | Battery storage (paired with solar) | 250.0 | Jun 2028 | In study |
| Rosharon BESS138 kV 42570 Archer (ACH) | Rosharon BESS LLC | Battery storage (stand-alone) | 120.0 | Jun 2028 | In study |
| Rock N' Roll Storage SLFtap 138kV 44600 Rosharon - 44531 Winmil · shared with 2 other requests | Rock N’ Roll Solar, LLC | Battery storage (paired with solar) | Self-limiting | Aug 2028 | In study |
| Gulf Prairie BESS(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43... · shared with 1 other request | Gulf Prairie Energy LLC | Battery storage (paired with solar) | 207.8 | Dec 2028 | In study |
| Gulf Prairie Solar(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43... · shared with 1 other request | Gulf Prairie Energy LLC | Solar | 202.2 | Dec 2028 | In study |
| Southside EnergyTap 138kV 42960 Mustang Bayou - 42100 HUDSON ckt 4 | Southside Energy, LLC | Battery storage (stand-alone) | 101.2 | Dec 2028 | In study |
| Surfside Energy StorageTap 138kV 42110 Angleton – 43150 Riwood ckt 82 | Rocky Mountain Energy Holdings, LLC | Battery storage (stand-alone) | 50.3 | Dec 2028 | In study |
| Oyster Creek Solar I SLFTap 138kV 42110 Angleton - 42050 Clute · shared with 1 other request | Oyster Creek Solar 1, LLC | Solar | 0 no capacity change | Apr 2029 | In study |
| Oyster Creek Storage I SLFTap 138kV 42110 Angleton - 42050 Clute · shared with 1 other request | Oyster Creek Solar 1, LLC | Battery storage (paired with solar) | Self-limiting | Apr 2029 | In study |
| Goby Energy CenterTap 138kV line 44390 Karsten - 44721 Thompsons | Goby Energy Center | Battery storage (stand-alone) | 200.7 | Sep 2029 | In study |
| Palisade BESSHoffman (42810) - Lake Jackson (42880) 138 kV line | Flexen USA LLC | Battery storage (stand-alone) | 153.5 | Oct 2029 | In study |
| Hecate Energy Orem Wind42530 Jones Creek 345kV | Hecate Energy LLC | Wind | 1,542.0 | Jun 2030 | In study |
| Bulldog Power II39703 TNMP FM524 Substation 138kV · shared with 1 other request | Bulldog Power II LLC | Gas turbine | 311.0 | Sep 2030 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- Bocanova Power II, battery storage, 150 MW (Bocanova Power II LLC)
- Stargazer BESS, battery storage, 104 MW (Stargazer Solar LLC)
- Stargazer Solar, solar, 158 MW (Stargazer Solar LLC)
Crowded connection points in Brazoria County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Angleton (42110) 138 kV 8 requests · 1,406 MW6 in study, 1 approved for synchronization, 1 signed; security posted
- Myrtle Solar 19INR0041 · Solar · 321 MW · Approved for synchronization
- Royal River BESS 24INR0282 · Battery storage · 311 MW · Signed; security posted
- Myrtle Solar Repower 27INR0636 · Solar · 314 MW · In study
- Gulf Prairie BESS 28INR0448 · Battery storage · 208 MW · In study
- Gulf Prairie Solar 27INR0449 · Solar · 202 MW · In study
- Surfside Energy Storage 25INR0458 · Battery storage · 50 MW · In study
- Oyster Creek Solar I SLF 26INR0117 · Solar · 0 MW · In study
- Oyster Creek Storage I SLF 26INR0118 · Battery storage · 0 MW · In study
Tnmp Fm (39703) 138 kV 6 requests · 1,747 MW3 signed, 3 in study
- GAMAY ENERGY STORAGE 26INR0417 · Battery storage · 419 MW · Signed May 2025
- Dan Kearney BESS 25INR0554 · Battery storage · 204 MW · Signed Oct 2024
- Bell Creek BESS 25INR0480 · Battery storage · 201 MW · Signed Nov 2024
- Bulldog Power (TEF - Due Diligence) 27INR0095 · Gas turbine · 311 MW · In study
- Bulldog Power II 30INR0073 · Gas turbine · 311 MW · In study
- Rubicon Power BESS 27INR0096 · Battery storage · 301 MW · In study
Mustang Bayou (42960) 138 kV 5 requests · 856 MW3 signed, 2 in study
- Clutch City Solar Phase II 25INR0330 · Solar · 251 MW · Signed Feb 2025
- Willow Beach Wind 25INR0494 · Wind · 202 MW · Signed Jun 2025
- Clutch City Solar Phase I 22INR0279 · Solar · 201 MW · Signed Sep 2022
- Southside Energy 24INR0530 · Battery storage · 101 MW · In study
- Cobra Clean Energy Center 26INR0374 · Battery storage · 100 MW · In study
Hudson (42100) 138 kV 5 requests · 856 MW3 signed, 2 in study
- Clutch City Solar Phase II 25INR0330 · Solar · 251 MW · Signed Feb 2025
- Willow Beach Wind 25INR0494 · Wind · 202 MW · Signed Jun 2025
- Clutch City Solar Phase I 22INR0279 · Solar · 201 MW · Signed Sep 2022
- Southside Energy 24INR0530 · Battery storage · 101 MW · In study
- Cobra Clean Energy Center 26INR0374 · Battery storage · 100 MW · In study
Savana (43180) 345 kV 5 requests · 1,137 MW3 signed, 2 signed; security posted
- Austin Bayou Solar 25INR0102 · Solar · 502 MW · Signed; security posted
- Cascade Solar 23INR0091 · Solar · 171 MW · Signed; security posted
- Austin Bayou Storage II 25INR0236 · Battery storage · 157 MW · Signed Feb 2025
- Austin Bayou Storage III 25INR0237 · Battery storage · 157 MW · Signed Feb 2025
- Austin Bayou Storage I 25INR0235 · Battery storage · 151 MW · Signed Feb 2025
Tn West (39500) 138 kV 5 requests · 1,181 MW2 in study, 2 signed, 1 signed; security posted
- First Capitol BESS 26INR0226 · Battery storage · 257 MW · Signed; security posted
- GAMAY ENERGY STORAGE 26INR0417 · Battery storage · 419 MW · Signed May 2025
- Bell Creek BESS 25INR0480 · Battery storage · 201 MW · Signed Nov 2024
- Marcus Energy Storage 24INR0570 · Battery storage · 201 MW · In study
- Pequin Energy Storage 23INR0194 · Battery storage · 103 MW · In study
Seabreeze (43020) 345 kV 4 requests · 960 MW3 signed, 1 signed; security posted
- Austin Bayou Solar 25INR0102 · Solar · 502 MW · Signed; security posted
- Austin Bayou Storage III 25INR0237 · Battery storage · 157 MW · Signed Feb 2025
- Pinewood Solar 25INR0170 · Solar · 151 MW · Signed May 2025
- Austin Bayou Storage I 25INR0235 · Battery storage · 151 MW · Signed Feb 2025
Oasis (43035) 345 kV 3 requests · 607 MW1 signed; security posted, 1 in study, 1 signed
- Cradle Solar 23INR0150 · Solar · 201 MW · Signed; security posted
- Austin Bayou Storage II 25INR0236 · Battery storage · 157 MW · Signed Feb 2025
- Cascade Storage 23INR0376 · Battery storage · 250 MW · In study
Rosharon (44600) 138 kV 3 requests · 358 MW3 in study
- Rock N' Roll Storage Two 24INR0235 · Battery storage · 206 MW · In study
- Rock N' Roll Solar SLF 24INR0041 · Solar · 152 MW · In study
- Rock N' Roll Storage SLF 24INR0234 · Battery storage · 0 MW · In study
Winmil (44531) 138 kV 3 requests · 358 MW3 in study
- Rock N' Roll Storage Two 24INR0235 · Battery storage · 206 MW · In study
- Rock N' Roll Solar SLF 24INR0041 · Solar · 152 MW · In study
- Rock N' Roll Storage SLF 24INR0234 · Battery storage · 0 MW · In study
Riwood (43150) 138 kV 3 requests · 460 MW3 in study
- Gulf Prairie BESS 28INR0448 · Battery storage · 208 MW · In study
- Gulf Prairie Solar 27INR0449 · Solar · 202 MW · In study
- Surfside Energy Storage 25INR0458 · Battery storage · 50 MW · In study
Nash (42980) 138 kV 4 requests · 628 MW · 3 in Brazoria County, 1 in Fort Bend2 in study, 2 signed; security posted
- Liatris Flexible Gas 26INR0408 · Gas turbine · 205 MW · Signed; security posted
- Skipjack Energy Storage 26INR0189 · Battery storage · 151 MW · Signed; security posted
- Copano Bay Energy Storage 25INR0566 · Battery storage · 201 MW · In study
- Pato Blanco Storage 25INR0242 · Battery storage · 71 MW · In study · Fort Bend
Parish (44010) 138 kV 4 requests · 628 MW · 3 in Brazoria County, 1 in Fort Bend2 in study, 2 signed; security posted
- Liatris Flexible Gas 26INR0408 · Gas turbine · 205 MW · Signed; security posted
- Skipjack Energy Storage 26INR0189 · Battery storage · 151 MW · Signed; security posted
- Copano Bay Energy Storage 25INR0566 · Battery storage · 201 MW · In study
- Pato Blanco Storage 25INR0242 · Battery storage · 71 MW · In study · Fort Bend
Bus 43110 (43110) 138 kV 3 requests · 207 MW · 2 in Brazoria County, 1 in Wharton2 in study, 1 approved for synchronization
- DAMAZO (Second Division) SOLAR 20INR0248 · Solar · 100 MW · Approved for synchronization
- Wittig Solar 26INR0144 · Solar · 107 MW · In study · Wharton
- Second Division Storage 25INR0378 · Battery storage · 0 MW · In study
Bus 43380 (43380) 138 kV 2 requests · 100 MW1 approved for synchronization, 1 in study
- DAMAZO (Second Division) SOLAR 20INR0248 · Solar · 100 MW · Approved for synchronization
- Second Division Storage 25INR0378 · Battery storage · 0 MW · In study
Sweeny Co (110505) 138 kV 2 requests · 459 MW1 in study, 1 signed; security posted
- First Capitol BESS 26INR0226 · Battery storage · 257 MW · Signed; security posted
- Marcus Energy Storage 24INR0570 · Battery storage · 201 MW · In study
Hastings (39010) 138 kV 2 requests · 361 MW1 in study, 1 signed
- Hastings Park BESS 26INR0551 · Battery storage · 256 MW · Signed Aug 2025
- Friendswood Energy Storage 25INR0550 · Battery storage · 105 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Brazoria County
- Brazoria County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 12, Houston: 5425 Polk St, Ste H, Houston TX 77023-1452, 713-767-3500; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Brazoria County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Brazoria County.
Permits and reviews for Brazoria County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Brazoria County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Brazoria County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.
How a project in Brazoria County connects to the grid
Brazoria County is on the ERCOT grid. The projects listed above are in ERCOT's Coastal load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Brazoria County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Brazoria County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 12
Austin · Chambers · Colorado · Fort Bend · Galveston · Harris · Liberty · Matagorda · Montgomery · Walker · Waller · Wharton