Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Ellis County

Ellis County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects24
Total capacity5,833MW
Signed agreements4of 24
New since August1requests

24 proposed energy projects from ERCOT's September 2026 report, plus who to call in Ellis County and in TCEQ Region 4 before signing a solar, wind, or battery storage lease.

Check land in Ellis CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Ellis County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Ellis County?

ERCOT's September 2026 interconnection report lists 24 proposed energy projects in Ellis County (9 solar, 12 battery storage, 2 gas and 1 other), about 5,833 MW in all. 4 of the 24 have a signed interconnection agreement, and 1 has been approved for energization or synchronization. The table also lists 3 changes to existing plants (repowers or capacity changes), not counted above. 1 is new since August.

What stands out in Ellis County

By capacity, battery storage leads in Ellis County with 3,278 MW across 12 projects, followed by solar (9 projects, 1,661 MW) and gas (2 projects, 844 MW). The largest single project is Kickstart Energy Storage VI, a 1,026 MW stand-alone battery storage project listed under Kickstart Infrastructure LLC, still in study, and its target online date is Dec 2029. Of the 24, 20 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet, 2 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (17 projects), 138 kV (3 projects) and 69 kV (1 project) (why the voltage matters). The single most-used connection point is Stainback Switch (bus #2217) - Elrod Switch (bus #3159), shared by 3 projects. Kickstart Infrastructure LLC is listed on the most projects here (6 of 24); 15 different companies appear in all. Target online dates for the projects not yet running span Dec 2026 to Sep 2030. All of them fall in ERCOT's North load zone. 1 is new since August.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Oystercatcher Solartap 345kV 1906 Venus - 68091 Navarro · shared with 2 other requestsOystercatcher Solar, LLCSolar198.4Jan 2027Approved for energization
Sol Marina SLF Energy CenterTap 345kV Stainback Switch (bus# 2217) – Big Onion Switch (bus# 2466)Sol Marina Energy Center, LLCSolar171.1Oct 2027Signed; security posted
Cumulus Grid BESS1906 Venus Switch Substation 345kVCumulus Grid, LLCBattery storage (stand-alone)210.7Jan 2028Signed; security posted
Venus Mill Storage138 kV Tap #442 Rail Port - #1905 GriffithAIH Texas Acquisitions, LLCBattery storage (stand-alone)100.8Dec 2027Signed Dec 2025
Dolomite Storage218 Rockett 69kVBT Wilson Storage, LLCBattery storage (stand-alone)125.7Dec 2026In study
Midlothian 4 repower1940 Midlothian ANP 345kVMIDLOTHIAN ENERGY, LLCGas turbine18.0Jun 2028In study
Midlothian Unit 2 repower1939 Midlothian ELP 345kVMIDLOTHIAN ENERGY, LLCGas turbine18.0Jun 2028In study
Midlothian Unit 3 repower1940 Midlothian ELP 345kVMIDLOTHIAN ENERGY, LLCGas turbine18.0Jun 2028In study
Tokyo TxHSR TPSS EW-1tap 138kV 2241 Ennis W - 2321 WaxahachieTexas Central Rail Holdings, LLCOther50.0Jul 2028In study
Bluebonnet Trail SolarTap 345 kV (#2427) WATMLL_W5 - (#2466) BIGONION_5Bluebonnet trail solar LLCSolar150.9Sep 2028In study
Galaxy I SolarStainback Switch (bus #2217) - Elrod Switch (bus #3159) · shared with 2 other requestsGalaxy Solar, LLCSolar99.4Oct 2028In study
Galaxy SolarStainback Switch (bus #2217) - Elrod Switch (bus #3159) · shared with 2 other requestsGalaxy Solar, LLCSolar177.3Oct 2028In study
Galaxy StorageStainback Switch (bus #2217) - Elrod Switch (bus #3159) · shared with 2 other requestsGalaxy Solar, LLCBattery storage (paired with solar)155.0Oct 2028In study
Old Alma Road Solar New2326 ENNS_SE_8 138kVWildcat Renewables, LLCSolar20.1Oct 2028In study
Two Step SolarTap 345kV 1907 Venus - 68091 NavarroTwo Step Solar, LLCSolar401.6Sep 2029In study
Kickstart Energy Storage ITap 345 kV 1907 Venus Switch - 3383 BYNUM_5 · shared with 1 other requestKickstart Infrastructure LLCBattery storage (stand-alone)1.4Sep 2029In study
Kickstart Energy Storage IITap 345 kV 1907 Venus Switch - 3383 BYNUM_5 · shared with 1 other requestKickstart Infrastructure LLCBattery storage (stand-alone)1.4Sep 2029In study
Kickstart Energy Storage IIITap 345 kV #1906 VENUS_S5 to #68091 NAVARRO · shared with 1 other requestKickstart Infrastructure LLCBattery storage (stand-alone)1.4Sep 2029In study
Kickstart Energy Storage IVTap 345 kV #1906 VENUS_S5 to #68091 NAVARRO · shared with 1 other requestKickstart Infrastructure LLCBattery storage (stand-alone)1.4Sep 2029In study
Galaxy Solar 23/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navar... · shared with 1 other requestGalaxy Solar 2, LLCSolar301.6Oct 2029In study
Galaxy Storage 23/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navar... · shared with 1 other requestGalaxy Solar 2, LLCBattery storage (paired with solar)201.9Oct 2029In study
Kickstart Energy Storage V345 KV Venus 1906 to Fort Smith 3389Kickstart Infrastructure LLCBattery storage (stand-alone)999.0Dec 2029In study
Kickstart Energy Storage VI345 KV Venus 1907 to Navarro 68091Kickstart Infrastructure LLCBattery storage (stand-alone)1,026.2Dec 2029In study
Crape Myrtle SolarTap 345 kV 2255 OLDCNTRY_5 - 3376 NOTUS_5Crape Myrtle Solar LLCSolar140.7Apr 2030In study
Digital Ranch Gas#1906 Venus Switch 345 kVMCV 1 LLCGas engines378.0Apr 2030In study
Victory Ellis – GasTap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elr... · shared with 1 other requestVictory Ellis, LLCGas turbine465.9Sep 2030In study
Victory Ellis–BESSTap 345kV Nimbus (2249) – Big Onion (2466) & Stainback (2217) – Elr... · shared with 1 other requestVictory Ellis, LLCBattery storage (paired with gas)453.0Sep 2030In study

Crowded connection points in Ellis County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Venus (1906) 345 kV 8 requests · 2,408 MW · 6 in Ellis County, 2 in Navarro4 in study, 3 signed; security posted, 1 approved for energization
  • Oystercatcher Solar 21INR0362 · Solar · 198 MW · Approved for energization
  • TORMES SOLAR 22INR0437 · Solar · 357 MW · Signed; security posted · Navarro
  • Yellow Cat Wind 25INR0018 · Wind · 262 MW · Signed; security posted · Navarro
  • Cumulus Grid BESS 24INR0178 · Battery storage · 211 MW · Signed; security posted
  • Kickstart Energy Storage V 29INR0217 · Battery storage · 999 MW · In study
  • Digital Ranch Gas 28INR0100 · Gas engines · 378 MW · In study
  • Kickstart Energy Storage III 27INR0471 · Battery storage · 1 MW · In study
  • Kickstart Energy Storage IV 27INR0472 · Battery storage · 1 MW · In study
Venus (1907) 345 kV 10 requests · 3,998 MW · 6 in Ellis County, 4 in Hill7 in study, 2 signed; security posted, 1 approved for synchronization
  • Compadre Solar 24INR0023 · Solar · 406 MW · Approved for synchronization · Hill
  • OCI Cobb Creek Solar 25INR0229 · Solar · 203 MW · Signed; security posted · Hill
  • OCI Cobb Creek ESS 25INR0233 · Battery storage · 202 MW · Signed; security posted · Hill
  • NRG Prairie Energy Center 29INR0158 · Gas combined cycle · 1,253 MW · In study · Hill
  • Kickstart Energy Storage VI 29INR0218 · Battery storage · 1,026 MW · In study
  • Two Step Solar 29INR0196 · Solar · 402 MW · In study
  • Galaxy Solar 2 28INR0385 · Solar · 302 MW · In study
  • Galaxy Storage 2 28INR0387 · Battery storage · 202 MW · In study
  • Kickstart Energy Storage I 27INR0469 · Battery storage · 1 MW · In study
  • Kickstart Energy Storage II 27INR0470 · Battery storage · 1 MW · In study
Navarro (68091) 345 kV 22 requests · 5,873 MW · 5 in Ellis County, 17 in Navarro, Freestone, Hill13 in study, 6 signed; security posted, 2 approved for synchronization, 1 approved for energization
  • Aquilla Lake 3 Wind 22INR0499 · Wind · 297 MW · Approved for synchronization · Hill
  • Piedra Solar 25INR0168 · Solar · 282 MW · Approved for synchronization · Freestone
  • Oystercatcher Solar 21INR0362 · Solar · 198 MW · Approved for energization
  • Tehuacana Creek Solar 24INR0188 · Solar · 505 MW · Signed; security posted · Navarro
  • TORMES SOLAR 22INR0437 · Solar · 357 MW · Signed; security posted · Navarro
  • Yellow Cat Wind 25INR0018 · Wind · 262 MW · Signed; security posted · Navarro
  • Glasgow Solar 24INR0206 · Solar · 204 MW · Signed; security posted · Navarro
  • Piedra BESS 25INR0169 · Battery storage · 104 MW · Signed; security posted · Freestone
  • Glasgow Storage 24INR0207 · Battery storage · 101 MW · Signed; security posted · Navarro
  • Kickstart Energy Storage VI 29INR0218 · Battery storage · 1,026 MW · In study
  • BM Freestone Energy Center 29INR0298 · Gas combined cycle · 991 MW · In study · Freestone
  • Two Step Solar 29INR0196 · Solar · 402 MW · In study
  • Silver Dollar Solar 27INR0186 · Solar · 302 MW · In study · Freestone
  • Oak Valley Solar 28INR0335 · Solar · 251 MW · In study · Navarro
  • Silver Dollar Storage 27INR0187 · Battery storage · 153 MW · In study · Freestone
  • Santa Monica Solar 26INR0228 · Solar · 106 MW · In study · Navarro
  • Pisgah Ridge Solar 2 24INR0086 · Solar · 102 MW · In study · Navarro
  • Kennedy Solar 24INR0256 · Solar · 102 MW · In study · Navarro
  • Pisgah Ridge Storage 3 24INR0087 · Battery storage · 101 MW · In study · Navarro
  • Kennedy Storage 24INR0391 · Battery storage · 25 MW · In study · Navarro
  • Kickstart Energy Storage III 27INR0471 · Battery storage · 1 MW · In study
  • Kickstart Energy Storage IV 27INR0472 · Battery storage · 1 MW · In study
Bus 2217 (2217) 345 kV 4 requests · 603 MW3 in study, 1 signed; security posted
  • Sol Marina SLF Energy Center 26INR0241 · Solar · 171 MW · Signed; security posted
  • Galaxy Solar 27INR0219 · Solar · 177 MW · In study
  • Galaxy Storage 27INR0220 · Battery storage · 155 MW · In study
  • Galaxy I Solar 28INR0355 · Solar · 99 MW · In study
Big Onion (2466) 345 kV 6 requests · 1,545 MW · 4 in Ellis County, 2 in Navarro3 signed; security posted, 3 in study
  • Glasgow Solar 24INR0206 · Solar · 204 MW · Signed; security posted · Navarro
  • Sol Marina SLF Energy Center 26INR0241 · Solar · 171 MW · Signed; security posted
  • Glasgow Storage 24INR0207 · Battery storage · 101 MW · Signed; security posted · Navarro
  • Victory Ellis – Gas 29INR0264 · Gas turbine · 466 MW · In study
  • Victory Ellis–BESS 28INR0529 · Battery storage · 453 MW · In study
  • Bluebonnet Trail Solar 27INR0417 · Solar · 151 MW · In study
Bus 3159 (3159) 3 requests · 432 MW3 in study
  • Galaxy Solar 27INR0219 · Solar · 177 MW · In study
  • Galaxy Storage 27INR0220 · Battery storage · 155 MW · In study
  • Galaxy I Solar 28INR0355 · Solar · 99 MW · In study
BYNUM_5 (3383) 345 kV 2 requests · 3 MW2 in study
  • Kickstart Energy Storage I 27INR0469 · Battery storage · 1 MW · In study
  • Kickstart Energy Storage II 27INR0470 · Battery storage · 1 MW · In study
BKR (4920) 345 kV 2 requests · 504 MW2 in study
  • Galaxy Solar 2 28INR0385 · Solar · 302 MW · In study
  • Galaxy Storage 2 28INR0387 · Battery storage · 202 MW · In study
Bus 2249 (2249) 345 kV 2 requests · 919 MW2 in study
  • Victory Ellis – Gas 29INR0264 · Gas turbine · 466 MW · In study
  • Victory Ellis–BESS 28INR0529 · Battery storage · 453 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Ellis County

  • Ellis County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 4, Dallas/Fort Worth: 2309 Gravel Dr, Fort Worth TX 76118-6951, 817-588-5800; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Ellis County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Ellis County.

Permits and reviews for Ellis County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Ellis County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Ellis County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.

How a project in Ellis County connects to the grid

Ellis County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Ellis County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Ellis County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 4

Collin · Cooke · Dallas · Denton · Erath · Fannin · Grayson · Hood · Hunt · Johnson · Kaufman · Navarro · Palo Pinto · Parker · Rockwall · Somervell · Tarrant · Wise

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.