Harris County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
33 proposed energy projects from ERCOT's September 2026 report, plus who to call in Harris County and in TCEQ Region 12 before signing a solar, wind, or battery storage lease.
Check land in Harris CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Harris County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Harris County?
ERCOT's September 2026 interconnection report lists 33 proposed energy projects in Harris County (1 solar, 28 battery storage, 3 gas and 1 other), about 6,843 MW in all. 11 of the 33 have a signed interconnection agreement, and 2 have been approved for energization or synchronization. 2 are new since August.
What stands out in Harris County
By capacity, battery storage leads in Harris County with 6,243 MW across 28 projects, followed by gas (3 projects, 500 MW) and solar (1 project, 50 MW). The largest single project is Hobby BESS I, a 603 MW stand-alone battery storage project listed under Airport Storage II LLC, still in study, and its target online date is Oct 2027. Of the 33, 22 are still in ERCOT's study process, 4 have a signed interconnection agreement but no security posted yet, 5 have posted security or started construction and 2 are approved for energization or synchronization. Connection points are mostly at 138 kV (29 projects) and 345 kV (3 projects) (why the voltage matters). AES Distributed Energy, Inc is listed on the most projects here (2 of 33); 32 different companies appear in all. Target online dates for the projects not yet running span Feb 2026 to Dec 2030. All of them fall in ERCOT's Houston load zone. 2 are new since August.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Kegans BESS (Houston IV BESS)44140 CLODINE 138kV | SMT Houston IV LLC | Battery storage (stand-alone) | 164.6 | Sep 2026 | Approved for synchronization |
| Little York BESSStation Name (TDSP Station Code): Little York (LK) | ESTX-PLD-HOUSTON5, LLC | Battery storage (stand-alone) | 10.0 | Nov 2026 | Approved for synchronization |
| Enchanted Rock NEWPP40475 Deusen 138kV | Generate ER-NG, LLC | Gas engines | 30.0 | Feb 2026 date passed; status per ERCOT | Signed; security posted |
| Callisto II Energy Center47150 HO Clarke 138kV | Callisto II Energy Center LLC | Battery storage (stand-alone) | 203.2 | Dec 2026 | Signed; security posted |
| Pamela Heights I#47150 HOC 138kV | Pamela heights I Energy Center LLC | Battery storage (stand-alone) | 101.7 | Dec 2026 | Signed; security posted |
| Hockley BESS New30.021619, -95.846315 | Regis Hockley LLC | Battery storage | 10.0 | Mar 2027 | Signed; security posted |
| NRG Greens Bayou 6 (TEF-Due Diligence)Position 1/0 PSSE 40710, Greens Bayou Substation, 138 kV | NRG Greens Bayou 6 LLC | Gas turbine | 445.0 | May 2028 | Signed; security posted |
| Dori BQ BESS138kV line Holmes (#47210) - Garden Villas (#42680); CNP | Sunnyside Energy LLC | Battery storage (paired with solar) | 154.0 | Aug 2027 | Signed May 2023 |
| Dori BQ Solartap 138kV 47210 Holmes – 42680 Garden Villas | Sunnyside Energy, LLC | Solar | 50.4 | Aug 2027 | Signed Dec 2022 |
| Megamouth Energy Storage New42750 Mykawa 138 kV | GCI Megamouth, LLC | Battery storage | 101.3 | Dec 2028 | Signed Nov 2025 |
| Pez Rojo BESSTap 138 kV #40260 Chamon - #40912 King | Pez Rojo BESS, LLC | Battery storage (stand-alone) | 217.2 | Feb 2029 | Signed May 2026 |
| SANJAC BESS40270 Riverside 138kV | Castleman Power | Battery storage (stand-alone) | 202.4 | Apr 2027 | In study |
| NET Power Demonstration plant42360 Mirage POI 8 138kV | NET Power LLC | Gas turbine | 25.5 | Aug 2027 | In study |
| Hobby BESS IDouble Tap 138kV 42680 Garden Villas – 48250 Hall & 42680 Garden Vi... | Airport Storage II LLC | Battery storage (stand-alone) | 602.6 | Oct 2027 | In study |
| Knight Airport BESS ITap 138kV 48126 Gulfgate - 48199 Knight 06 and 42680 Garden Villas... | Airport Storage I LLC | Battery storage (stand-alone) | 522.5 | Oct 2027 | In study |
| Outer Loop BESS40700 Greens Bayou 345kV | Black Mountain Energy Storage II | Battery storage (stand-alone) | 201.2 | Dec 2027 | In study |
| Claire BESS40011 Cedar Bayou 138kV | BRP Blue Topaz 3, LLC | Battery storage (stand-alone) | 406.0 | Dec 2027 | In study |
| Houston BESSTap 138 kV LAUDER (#46002) - RITTENHOUSE (#46282) ckt 95 | SMT Houston | Battery storage (stand-alone) | 227.9 | Jan 2028 | In study |
| Massey StorageTap 138kV Chevron_NewSub(#99300) and Cedar Bayou Tap(#48065) circu... | Massey Storage, LLC | Battery storage (stand-alone) | 102.9 | Jan 2028 | In study |
| Stinger Energy StorageTap Atascocita 138kV Substation (Bus # 40130) - Lake Houston (Bus #... | Stinger Energy Storage LLC | Battery storage (stand-alone) | 200.8 | Mar 2028 | In study |
| High Plains Storage45880 Hockley 138kV | ROBP Holdings, LLC | Battery storage (stand-alone) | 157.7 | May 2028 | In study |
| Callisto ID Energy Center47170 (H_O_C__B138) 138kV | Tempus Power management LLC | Battery storage (stand-alone) | 100.0 | Jun 2028 | In study |
| Barcelona TxHSR TPSS HN-4tap 138kV 45885 HocklyC - 46220 Peters | Texas Central Rail Holdings, LLC | Other | 50.0 | Jul 2028 | In study |
| Furay Battery Energy Storage SystemTap 138kV 45660 Jonte substation – 46332 Scenic Woods | Blue Topaz 1, LLC | Battery storage (stand-alone) | 304.0 | Sep 2028 | In study |
| Rex StorageTap 138 kV 48096 El Dorado - 43610 Scarsdale CKT 92 | Rex BESS, LLC | Battery storage (stand-alone) | 256.4 | Oct 2028 | In study |
| Bluegill BESSTap 138 kV 40130 Atascocita - 40690 East Gate | Bluegill BESS, LLC | Battery storage (stand-alone) | 251.0 | Oct 2028 | In study |
| Texas Deepwater BESS#40881 Parkes Substation 138 kV | TDWP Partners LLC | Battery storage (stand-alone) | 313.3 | Mar 2029 | In study |
| Burnet Bay Storagetap 138kV 40390 Crosby - 40790 Haney | TOCE TX BESS 4, LLC | Battery storage (stand-alone) | 207.8 | Jun 2029 | In study |
| Coati Energy StorageBus # 40830, Humble, 138 kV | PowerPulse LLC | Battery storage (stand-alone) | 202.8 | Jun 2029 | In study |
| Pinnacle Point Energy StorageTap Highlands (Bus # 40812) - HANEY ( BUS # 40790) 138 kV | GCI Pinnacle Point, LLC | Battery storage (stand-alone) | 101.3 | Jul 2029 | In study |
| Beacon Storage40450 Deepwater 345kV | AES Distributed Energy, Inc | Battery storage (stand-alone) | 408.7 | Oct 2029 | In study |
| Sigma Storage40460 Deepwater 138kV | AES Distributed Energy, Inc | Battery storage (stand-alone) | 408.4 | Oct 2029 | In study |
| Hyacinth Storage46500 Tomball 345 kV | Hyacinth Storage, LLC | Battery storage (stand-alone) | 103.0 | Dec 2030 | In study |
Crowded connection points in Harris County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Garden Villas (42680) 138 kV 3 requests · 807 MW2 signed, 1 in study
- Dori BQ BESS 24INR0196 · Battery storage · 154 MW · Signed May 2023
- Dori BQ Solar 23INR0040 · Solar · 50 MW · Signed Dec 2022
- Hobby BESS I 26INR0546 · Battery storage · 603 MW · In study
Ho Clarke (47150) 138 kV 2 requests · 305 MW2 signed; security posted
- Callisto II Energy Center 22INR0558 · Battery storage · 203 MW · Signed; security posted
- Pamela Heights I 28INR0154 · Battery storage · 102 MW · Signed; security posted
Holmes (47210) 138 kV 2 requests · 204 MW2 signed
- Dori BQ BESS 24INR0196 · Battery storage · 154 MW · Signed May 2023
- Dori BQ Solar 23INR0040 · Solar · 50 MW · Signed Dec 2022
Atascocita (40130) 138 kV 2 requests · 452 MW2 in study
- Bluegill BESS 25INR0434 · Battery storage · 251 MW · In study
- Stinger Energy Storage 26INR0343 · Battery storage · 201 MW · In study
Haney (40790) 138 kV 2 requests · 309 MW2 in study
- Burnet Bay Storage 26INR0548 · Battery storage · 208 MW · In study
- Pinnacle Point Energy Storage 26INR0317 · Battery storage · 101 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Harris County
- Harris County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 12, Houston: 5425 Polk St, Ste H, Houston TX 77023-1452, 713-767-3500; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Harris County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Harris County.
Permits and reviews for Harris County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Harris County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
Recent local action: On March 19, 2026, Harris County Commissioners Court authorized county staff to execute solar power and battery energy storage projects under the county's Solar for All initiative, at roughly six to 10 locations. The $88.3 million upfront investment comes from the county's CIP fund. (Community Impact; checked October 17, 2026).
How a project in Harris County connects to the grid
Harris County is on the ERCOT grid. The projects listed above are in ERCOT's Houston load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Harris County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Harris County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 12
Austin · Brazoria · Chambers · Colorado · Fort Bend · Galveston · Liberty · Matagorda · Montgomery · Walker · Waller · Wharton