Dallas County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects9
Total capacity867MW
Signed agreements0of 9
New since August0requests

9 proposed energy projects from ERCOT's September 2026 report, plus who to call in Dallas County and in TCEQ Region 4 before signing a solar, wind, or battery storage lease.

Check land in Dallas CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Dallas County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Dallas County?

ERCOT's September 2026 interconnection report lists 9 proposed energy projects in Dallas County (8 battery storage and 1 other), about 867 MW in all. None has a signed interconnection agreement yet.

What stands out in Dallas County

By capacity, battery storage leads in Dallas County with 817 MW across 8 projects, followed by other (1 project, 50 MW). The largest single project is watermelon 1 energy storage, a 102 MW stand-alone battery storage project listed under Tempus power management LLC, still in study, and its target online date is Mar 2029. Of the 9, 9 are still in ERCOT's study process. Connection points are mostly at 345 kV (8 projects) and 138 kV (1 project) (why the voltage matters). The single most-used connection point is Tap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1., shared by 6 projects. Tempus power management LLC is listed on the most projects here (8 of 9); 2 different companies appear in all. Target online dates for the projects not yet running span Jul 2028 to Mar 2029. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Atlanta TxHSR TPSS DS-1tap 138kV 2429 Watermill E - 3083 WilmerTexas Central Rail Holdings, LLCOther50.0Jul 2028In study
watermelon 1 energy storageTap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line... · shared with 6 other requestsTempus power management LLCBattery storage (stand-alone)102.1Mar 2029In study
watermelon 2 energy storageTap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. · shared with 6 other requestsTempus power management LLCBattery storage (stand-alone)102.1Mar 2029In study
watermelon 3 energy storageTap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt...Tempus power management LLCBattery storage (stand-alone)102.1Mar 2029In study
watermelon 4 energy storageTap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. · shared with 6 other requestsTempus power management LLCBattery storage (stand-alone)102.1Mar 2029In study
watermelon 5 energy storageTap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. · shared with 6 other requestsTempus power management LLCBattery storage (stand-alone)102.1Mar 2029In study
watermelon 6 energy storageTap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. · shared with 6 other requestsTempus power management LLCBattery storage (stand-alone)102.1Mar 2029In study
watermelon 7 energy storageTap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. · shared with 6 other requestsTempus power management LLCBattery storage (stand-alone)102.1Mar 2029In study
watermelon 8 energy storageTap on 2427 WATMLL_W5 345.00 - 2432 TRICRN1_5 345.00 345kV line ckt 1. · shared with 6 other requestsTempus power management LLCBattery storage (stand-alone)102.1Mar 2029In study

Crowded connection points in Dallas County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

WATMLL_W5 (2427) 345 kV 9 requests · 968 MW · 8 in Dallas County, 1 in Ellis9 in study
  • Bluebonnet Trail Solar 27INR0417 · Solar · 151 MW · In study · Ellis
  • watermelon 1 energy storage 27INR0457 · Battery storage · 102 MW · In study
  • watermelon 2 energy storage 27INR0458 · Battery storage · 102 MW · In study
  • watermelon 3 energy storage 27INR0459 · Battery storage · 102 MW · In study
  • watermelon 4 energy storage 27INR0460 · Battery storage · 102 MW · In study
  • watermelon 5 energy storage 28INR0255 · Battery storage · 102 MW · In study
  • watermelon 6 energy storage 28INR0256 · Battery storage · 102 MW · In study
  • watermelon 7 energy storage 28INR0257 · Battery storage · 102 MW · In study
  • watermelon 8 energy storage 28INR0258 · Battery storage · 102 MW · In study
TRICRN1_5 (2432) 345 kV 13 requests · 1,520 MW · 8 in Dallas County, 5 in Kaufman12 in study, 1 approved for synchronization
  • Erika Solar 24INR0303 · Solar · 200 MW · Approved for synchronization · Kaufman
  • Solarville Solar SLF 26INR0086 · Solar · 403 MW · In study · Kaufman
  • watermelon 1 energy storage 27INR0457 · Battery storage · 102 MW · In study
  • watermelon 2 energy storage 27INR0458 · Battery storage · 102 MW · In study
  • watermelon 3 energy storage 27INR0459 · Battery storage · 102 MW · In study
  • watermelon 4 energy storage 27INR0460 · Battery storage · 102 MW · In study
  • watermelon 5 energy storage 28INR0255 · Battery storage · 102 MW · In study
  • watermelon 6 energy storage 28INR0256 · Battery storage · 102 MW · In study
  • watermelon 7 energy storage 28INR0257 · Battery storage · 102 MW · In study
  • watermelon 8 energy storage 28INR0258 · Battery storage · 102 MW · In study
  • Erika BESS 27INR0531 · Battery storage · 100 MW · In study · Kaufman
  • Solarville Wind SLF 28INR0431 · Wind · 0 MW · In study · Kaufman
  • Solarville BESS SLF 28INR0432 · Battery storage · 0 MW · In study · Kaufman

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Dallas County

  • Dallas County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 4, Dallas/Fort Worth: 2309 Gravel Dr, Fort Worth TX 76118-6951, 817-588-5800; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Dallas County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Dallas County.

Permits and reviews for Dallas County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Dallas County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Dallas County connects to the grid

Dallas County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Dallas County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Dallas County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 4

Collin · Cooke · Denton · Ellis · Erath · Fannin · Grayson · Hood · Hunt · Johnson · Kaufman · Navarro · Palo Pinto · Parker · Rockwall · Somervell · Tarrant · Wise

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources