Hunt County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects10
Total capacity1,476MW
Signed agreements3of 10
New since August0requests

10 proposed energy projects from ERCOT's September 2026 report, plus who to call in Hunt County and in TCEQ Region 4 before signing a solar, wind, or battery storage lease.

Check land in Hunt CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Hunt County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Hunt County?

ERCOT's September 2026 interconnection report lists 10 proposed energy projects in Hunt County (3 solar, 5 battery storage and 2 gas), about 1,476 MW in all. 3 of the 10 have a signed interconnection agreement.

What stands out in Hunt County

By capacity, battery storage leads in Hunt County with 990 MW across 5 projects, followed by solar (3 projects, 277 MW) and gas (2 projects, 209 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is 18-BRAVO BESS, a 407 MW stand-alone battery storage project listed under Scout Energy Management, LLC, still in study, and its target online date is Feb 2028. Of the 10, 7 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 2 have posted security or started construction. Connection points are mostly at 138 kV (8 projects) and 345 kV (1 project) (why the voltage matters). GEUS and Pink Solar, LLC are each listed on 2 projects; 8 different companies appear in all. Target online dates for the projects not yet running span Jun 2027 to Jul 2029. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
McMurtre Storagetap 138kV 1819 Commerce South - 1815 Cumby TapBT McMurtre Storage, LLCBattery storage (stand-alone)176.1Dec 2027Signed; security posted
VALDIVIAN SOLAR138kV 1816 Commerce Switch - 1809 Wolf CityAbei Energy Green III LLCSolar74.9Sep 2028Signed; security posted
Pink Solar SLF971 Pruitt 138kV · shared with 1 other requestPink Solar, LLCSolar152.4Jul 2029Signed Aug 2022
Power Lane II Gas - AlternateTap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818)...GEUSGas engines104.4Jun 2027In study
Power Lane II - GasGREENV_IN_8 (977) via (future) GEUS_STM SubstationGEUSGas engines104.5Aug 2027In study
18-BRAVO BESS138 kV Commerce Switch Substation. Bus no. #1816Scout Energy Management, LLCBattery storage (stand-alone)407.0Feb 2028In study
Fermata BESSTap 345kV 2464# CASHSW_T5 – 2461# ROYSE_N5Fermata BESS, LLCBattery storage (stand-alone)204.0Jul 2028In study
MAKALU SOLARTap 138kV 977 Pruitt - 971 GreenvilleAbei Energy Green X LLCSolar50.2Jul 2028In study
Ceres BESSTap 138 kV 6883 QUINLAN NORTH SS - 6860 UNION VALLEY SSCeres BESS, LLCBattery storage (stand-alone)202.7Aug 2028In study
Pink Storage SLF971 Pruitt 138kV · shared with 1 other requestPink Solar, LLCBattery storage (paired with solar)Self-limitingJul 2029In study

Crowded connection points in Hunt County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Pruitt (971) 138 kV 3 requests · 203 MW2 in study, 1 signed
  • Pink Solar SLF 22INR0281 · Solar · 152 MW · Signed Aug 2022
  • MAKALU SOLAR 22INR0425 · Solar · 50 MW · In study
  • Pink Storage SLF 29INR0293 · Battery storage · 0 MW · In study
Pruitt (977) 138 kV 2 requests · 155 MW2 in study
  • Power Lane II - Gas 27INR0631 · Gas engines · 104 MW · In study
  • MAKALU SOLAR 22INR0425 · Solar · 50 MW · In study
Commerce (1816) 138 kV 2 requests · 482 MW1 signed; security posted, 1 in study
  • VALDIVIAN SOLAR 25INR0246 · Solar · 75 MW · Signed; security posted
  • 18-BRAVO BESS 28INR0327 · Battery storage · 407 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Hunt County

  • Hunt County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 4, Dallas/Fort Worth: 2309 Gravel Dr, Fort Worth TX 76118-6951, 817-588-5800; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Hunt County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Hunt County.

Permits and reviews for Hunt County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Hunt County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Hunt County connects to the grid

Hunt County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Hunt County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Hunt County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 4

Collin · Cooke · Dallas · Denton · Ellis · Erath · Fannin · Grayson · Hood · Johnson · Kaufman · Navarro · Palo Pinto · Parker · Rockwall · Somervell · Tarrant · Wise

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.