Fannin County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects3
Total capacity1,363MW
Signed agreements0of 3
New since August0requests

3 proposed energy projects from ERCOT's September 2026 report, plus who to call in Fannin County and in TCEQ Region 4 before signing a solar, wind, or battery storage lease.

Check land in Fannin CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Fannin County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Fannin County?

ERCOT's September 2026 interconnection report lists 3 proposed energy projects in Fannin County (1 wind, 1 battery storage and 1 gas), about 1,363 MW in all. None has a signed interconnection agreement yet.

What stands out in Fannin County

By capacity, gas leads in Fannin County with 991 MW across 1 project, followed by battery storage (1 project, 192 MW) and wind (1 project, 180 MW). The largest single project is Black Mountain Fannin Gas, a 991 MW gas combined cycle project listed under Black Mountain Power LLC, still in study, and its target online date is Apr 2030. Of the 3, 3 are still in ERCOT's study process. Connection points are mostly at 345 kV (2 projects) and 138 kV (1 project) (why the voltage matters). Each of the 3 projects is listed under a different company. Target online dates for the projects not yet running span May 2028 to Apr 2030. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
2 Cedar WindTap 345kV 1729 Valley South – Anna Switch 2373 · shared with 2 other requestsSunWR, LLCWind180.0May 2028In study
Steelhead Energy StorageTap 1593 BONHAM_P8 to Allens Creek 1835 138kVGRS BESS TEXAS SEVEN, LLCBattery storage (stand-alone)192.1Apr 2029In study
Black Mountain Fannin Gas345 KV #1729 Valley SouthBlack Mountain Power LLCGas combined cycle990.6Apr 2030In study

Crowded connection points in Fannin County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Valley South (1729) 345 kV 7 requests · 2,365 MW · 2 in Fannin County, 5 in Lamar, Grayson6 in study, 1 signed
  • Bug Tussle Wind Project 23INR0441 · Wind · 397 MW · Signed Jul 2024 · Lamar
  • Black Mountain Fannin Gas 29INR0191 · Gas combined cycle · 991 MW · In study
  • White Bright BESS 26INR0605 · Battery storage · 314 MW · In study · Grayson
  • Whitewright Solar 2 26INR0300 · Solar · 302 MW · In study · Grayson
  • Lan Solar SLF 22INR0314 · Solar · 182 MW · In study · Lamar
  • 2 Cedar Wind 28INR0286 · Wind · 180 MW · In study
  • Lan Battery SLF 24INR0262 · Battery storage · 0 MW · In study · Lamar

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Fannin County

  • Fannin County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 4, Dallas/Fort Worth: 2309 Gravel Dr, Fort Worth TX 76118-6951, 817-588-5800; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Fannin County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Fannin County.

Permits and reviews for Fannin County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Fannin County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Fannin County connects to the grid

Fannin County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Fannin County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Fannin County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 4

Collin · Cooke · Dallas · Denton · Ellis · Erath · Grayson · Hood · Hunt · Johnson · Kaufman · Navarro · Palo Pinto · Parker · Rockwall · Somervell · Tarrant · Wise

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.