Grayson County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
4 proposed energy projects from ERCOT's September 2026 report, plus who to call in Grayson County and in TCEQ Region 4 before signing a solar, wind, or battery storage lease.
Check land in Grayson CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Grayson County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Grayson County?
ERCOT's September 2026 interconnection report lists 4 proposed energy projects in Grayson County (2 solar, 1 battery storage and 1 gas), about 1,287 MW in all. 2 of the 4 have a signed interconnection agreement.
What stands out in Grayson County
By capacity, gas leads in Grayson County with 570 MW across 1 project, followed by solar (2 projects, 403 MW) and battery storage (1 project, 314 MW). The largest single project is RAYBURN ENERGY STATION II Gas (TEF-Due Diligence), a 570 MW gas turbine project listed under Rayburn Country Electric Cooperative, Inc., with its agreement signed and security posted, and its target online date is Feb 2028. Of the 4, 2 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 1 has posted security or started construction. Connection points are mostly at 345 kV (2 projects) and 138 kV (2 projects) (why the voltage matters). Each of the 4 projects is listed under a different company. Target online dates for the projects not yet running span Feb 2028 to Apr 2029. All of them fall in ERCOT's North load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| RAYBURN ENERGY STATION II Gas (TEF-Due Diligence)Double Tap 138 kV Haggerty (12677) - Progress Park (#12678) & Hagge... | Rayburn Country Electric Cooperative, Inc. | Gas turbine | 570.0 | Feb 2028 | Signed; security posted |
| Lima Solar ProjectTap 138 kV Haggerty Switch (12677) to Van Al (1754) 138kV | Industrial Lima Project, LLC | Solar | 101.3 | Mar 2029 | Signed Sep 2026 |
| Whitewright Solar 2Tap 345kV 1729 Valley South – Anna Switch 2373 · shared with 2 other requests | SunWR, LLC | Solar | 301.7 | May 2028 | In study |
| White Bright BESSTap 345kV 1729 Valley South – Anna Switch 2373 · shared with 2 other requests | VLN, LLC | Battery storage (stand-alone) | 313.7 | Apr 2029 | In study |
Crowded connection points in Grayson County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Valley South (1729) 345 kV 7 requests · 2,365 MW · 2 in Grayson County, 5 in Lamar, Fannin6 in study, 1 signed
- Bug Tussle Wind Project 23INR0441 · Wind · 397 MW · Signed Jul 2024 · Lamar
- Black Mountain Fannin Gas 29INR0191 · Gas combined cycle · 991 MW · In study · Fannin
- White Bright BESS 26INR0605 · Battery storage · 314 MW · In study
- Whitewright Solar 2 26INR0300 · Solar · 302 MW · In study
- Lan Solar SLF 22INR0314 · Solar · 182 MW · In study · Lamar
- 2 Cedar Wind 28INR0286 · Wind · 180 MW · In study · Fannin
- Lan Battery SLF 24INR0262 · Battery storage · 0 MW · In study · Lamar
Anna (2373) 345 kV 5 requests · 1,131 MW · 2 in Grayson County, 3 in Cooke, Collin, Fannin3 in study, 1 approved for synchronization, 1 signed; security posted
- WILDWIND 20INR0033 · Wind · 180 MW · Approved for synchronization · Cooke
- Purple Sage BESS 2 25INR0392 · Battery storage · 156 MW · Signed; security posted · Collin
- White Bright BESS 26INR0605 · Battery storage · 314 MW · In study
- Whitewright Solar 2 26INR0300 · Solar · 302 MW · In study
- 2 Cedar Wind 28INR0286 · Wind · 180 MW · In study · Fannin
Bus 12677 (12677) 138 kV 2 requests · 671 MW1 signed, 1 signed; security posted
- RAYBURN ENERGY STATION II Gas (TEF-Due Diligence) 28INR0108 · Gas turbine · 570 MW · Signed; security posted
- Lima Solar Project 27INR0234 · Solar · 101 MW · Signed Sep 2026
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Grayson County
- Grayson County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 4, Dallas/Fort Worth: 2309 Gravel Dr, Fort Worth TX 76118-6951, 817-588-5800; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Grayson County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Grayson County.
Permits and reviews for Grayson County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Grayson County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Grayson County connects to the grid
Grayson County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Grayson County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Grayson County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 4
Collin · Cooke · Dallas · Denton · Ellis · Erath · Fannin · Hood · Hunt · Johnson · Kaufman · Navarro · Palo Pinto · Parker · Rockwall · Somervell · Tarrant · Wise