Falls County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects13
Total capacity1,509MW
Signed agreements2of 13
New since August0requests

13 proposed energy projects from ERCOT's September 2026 report, plus who to call in Falls County and in TCEQ Region 9 before signing a solar, wind, or battery storage lease.

Check land in Falls CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Falls County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Falls County?

ERCOT's September 2026 interconnection report lists 13 proposed energy projects in Falls County (7 solar, 1 wind and 5 battery storage), about 1,509 MW in all. 2 of the 13 have a signed interconnection agreement, and 2 have been approved for energization or synchronization.

What stands out in Falls County

By capacity, solar leads in Falls County with 1,250 MW across 7 projects, followed by wind (1 project, 199 MW) and battery storage (5 projects, 60 MW); 4 self-limiting projects (reported at 0 MW because the resource limits its own output) are listed without a capacity. The largest single project is RIVERBEND SOLAR SLF, a 302 MW solar project listed under Riverbend Renewables, LLC, still in study, and its target online date is Dec 2027. Of the 13, 11 are still in ERCOT's study process and 2 are approved for energization or synchronization. Connection points are mostly at 345 kV (8 projects), 69 kV (4 projects) and 138 kV (1 project) (why the voltage matters). BT Yixin Solar, LLC, Enel Green Power Roseland Solar, LLC and Fallstone Solar, LLC are each listed on 2 projects; 9 different companies appear in all. Target online dates for the projects not yet running span Dec 2027 to Oct 2029. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Roseland Solartap 345kV 3390 Jewett - 3399 Ratsnake · shared with 1 other requestEnel Green Power Roseland Solar, LLCSolar254.0Oct 2026Approved for synchronization
Roseland Solar IItap 345kV 3390 Jewett - 3399 Ratsnake · shared with 1 other requestEnel Green Power Roseland Solar, LLCSolar254.0Oct 2026Approved for synchronization
RIVERBEND SOLAR SLFTAP 345 KV LINE FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (... · shared with 1 other requestRiverbend Renewables, LLCSolar301.6Dec 2027In study
RIVERBEND STORAGE SLFTAP 345 KV LINE FROM TRADINGHOUSE (#3405) TO TEMPLE PECAN CREEK (#3... · shared with 1 other requestRiverbend Renewables, LLCBattery storage (paired with solar)Self-limitingDec 2027In study
Rosebud Solar SLFTap 69kV 67 BAGGINS - 69 BARCLAYRosebud Solar, LLCSolar130.0Jan 2028In study
Rosebud Storage SLFTap 69 kV 67 BAGGINS - 69 BARCLAYRosebud Storage, LLCBattery storage (paired with solar)Self-limitingJan 2028In study
Fallstone Solar SLFTap 69kV 3588 Groesbeck - 3637 Otto Junction · shared with 1 other requestFallstone Solar, LLCSolar60.5Sep 2028In study
Fallstone Storage SLFTap 69kV 3588 Groesbeck - 3637 Otto Junction · shared with 1 other requestFallstone Solar, LLCBattery storage (paired with solar)Self-limitingSep 2028In study
Wang Solar SLFtap 345kV 3409 LakeCr1 - 3414 TempSS · shared with 1 other requestBT Yixin Solar, LLCSolar144.6Jan 2029In study
Wang Storage SLFtap 345kV 3409 LakeCr1 - 3414 TempSS · shared with 1 other requestBT Yixin Solar, LLCBattery storage (paired with solar)Self-limitingJan 2029In study
Bronc Rodeo Solar ProjectTap 138 kV Line from Temple Pecan Creek (#3420) to the Cow Bayou Sw...Energiekontor US Texas SP 16 LLCSolar105.7Apr 2029In study
Pasture Rose WindTAP 345KV BUS 3721 STRANGER SW - 3711 BALE_S5Pasture Rose, LLCWind198.7Jun 2029In study
Falls County Storage3711 BALSW 345kVAurora Solar LLCBattery storage (stand-alone)60.0Oct 2029In study

Crowded connection points in Falls County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

LAKECR1 (3409) 345 kV 2 requests · 145 MW2 in study
  • Wang Solar SLF 20INR0106 · Solar · 145 MW · In study
  • Wang Storage SLF 22INR0514 · Battery storage · 0 MW · In study
Tempss (3414) 345 kV 4 requests · 1,388 MW · 2 in Falls County, 2 in Bell4 in study
  • Riviera Gas 29INR0206 · Gas combined cycle · 637 MW · In study · Bell
  • Lavita BESS 26INR0465 · Battery storage · 606 MW · In study · Bell
  • Wang Solar SLF 20INR0106 · Solar · 145 MW · In study
  • Wang Storage SLF 22INR0514 · Battery storage · 0 MW · In study
Jewett (3390) 345 kV 7 requests · 1,862 MW · 2 in Falls County, 5 in Grimes, Leon, Madison3 in study, 2 approved for synchronization, 1 signed; security posted, 1 signed
  • Roseland Solar 20INR0205 · Solar · 254 MW · Approved for synchronization
  • Roseland Solar II 22INR0506 · Solar · 254 MW · Approved for synchronization
  • Hollow Branch Creek Solar 24INR0422 · Solar · 460 MW · Signed; security posted · Leon
  • Tex-Bar ESS 26INR0411 · Battery storage · 202 MW · Signed Dec 2025 · Madison
  • Treehouse Solar 28INR0394 · Solar · 282 MW · In study · Grimes
  • Treehouse Storage 28INR0395 · Battery storage · 209 MW · In study · Grimes
  • Avant Prairie BESS 27INR0316 · Battery storage · 202 MW · In study · Freestone
Ratsnake (3399) 345 kV 2 requests · 508 MW2 approved for synchronization
  • Roseland Solar 20INR0205 · Solar · 254 MW · Approved for synchronization
  • Roseland Solar II 22INR0506 · Solar · 254 MW · Approved for synchronization
Tradinghouse (3405) 345 kV 5 requests · 974 MW · 2 in Falls County, 3 in McLennan3 in study, 1 approved for synchronization, 1 signed; security posted
  • Prairie Hill Wind 19INR0100 · Wind · 297 MW · Approved for synchronization · McLennan
  • Pepper Solar Farm 26INR0380 · Solar · 121 MW · Signed; security posted · McLennan
  • RIVERBEND SOLAR SLF 25INR0297 · Solar · 302 MW · In study
  • PowerVault BESS 26INR0422 · Battery storage · 255 MW · In study · McLennan
  • RIVERBEND STORAGE SLF 25INR0311 · Battery storage · 0 MW · In study
Bus 3412 (3412) 345 kV 3 requests · 908 MW · 2 in Falls County, 1 in Bell3 in study
  • Lavita BESS 26INR0465 · Battery storage · 606 MW · In study · Bell
  • RIVERBEND SOLAR SLF 25INR0297 · Solar · 302 MW · In study
  • RIVERBEND STORAGE SLF 25INR0311 · Battery storage · 0 MW · In study
Groesbeck (3588) 69 kV 2 requests · 61 MW2 in study
  • Fallstone Solar SLF 28INR0147 · Solar · 61 MW · In study
  • Fallstone Storage SLF 28INR0149 · Battery storage · 0 MW · In study
Otto Junction (3637) 69 kV 2 requests · 61 MW2 in study
  • Fallstone Solar SLF 28INR0147 · Solar · 61 MW · In study
  • Fallstone Storage SLF 28INR0149 · Battery storage · 0 MW · In study
BALE_S5 (3711) 345 kV 2 requests · 259 MW2 in study
  • Pasture Rose Wind 28INR0262 · Wind · 199 MW · In study
  • Falls County Storage 29INR0105 · Battery storage · 60 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Falls County

  • Falls County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 9, Waco: 6801 Sanger Ave, Ste 2500, Waco TX 76710-7826, 254-751-0335; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Falls County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Falls County.

Permits and reviews for Falls County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Falls County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Falls County connects to the grid

Falls County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Falls County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Falls County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 9

Bell · Bosque · Brazos · Burleson · Coryell · Freestone · Grimes · Hamilton · Hill · Lampasas · Leon · Limestone · Madison · McLennan · Milam · Mills · Robertson · San Saba · Washington

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.