Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › Limestone County

Limestone County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects9
Total capacity1,064MW
Signed agreements5of 9
New since August0requests

9 proposed energy projects from ERCOT's September 2026 report, plus who to call in Limestone County and in TCEQ Region 9 before signing a solar, wind, or battery storage lease.

Check land in Limestone CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Limestone County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Limestone County?

ERCOT's September 2026 interconnection report lists 9 proposed energy projects in Limestone County (6 solar and 3 battery storage), about 1,064 MW in all. 5 of the 9 have a signed interconnection agreement.

What stands out in Limestone County

By capacity, solar leads in Limestone County with 857 MW across 6 projects, followed by battery storage (3 projects, 207 MW). The largest single project is Varadero Solar, a 206 MW solar project listed under NextEra Energy Interconnection Holdings, LLC, with its agreement signed and security posted, and its target online date is Apr 2029. Of the 9, 4 are still in ERCOT's study process and 5 have posted security or started construction. Connection points are mostly at 69 kV (4 projects), 138 kV (4 projects) and 345 kV (1 project) (why the voltage matters). Adon Texas Sixteen LLC and J&J Solar Ranch LLC are each listed on 2 projects; 7 different companies appear in all. Target online dates for the projects not yet running span Apr 2027 to Apr 2029. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Bonham Solar SLFTAP 138 kV MEXIA_2_1_8 3632 - GROES_SE1_8 3634J&J Solar Ranch LLCSolar138.4Apr 2027Signed; security posted
Bonham Storage SLFTap 138kV 3632 Mexia_Main - 3634 Groesbeck_MainJ&J Solar Ranch LLCBattery storage (paired with solar)104.9Jul 2027Signed; security posted
Leighton Solar98 Fernleaf 138 kVLavender Solar LLCSolar181.0Dec 2027Signed; security posted
Fewell SolarTap 138kV 3597 Groesbeck - 3634 Groesbeck MainFewell Solar LLCSolar203.5May 2028Signed; security posted
Varadero Solar#68092 Liberty Station 345kVNextEra Energy Interconnection Holdings, LLCSolar206.0Apr 2029Signed; security posted
Findley BESSTap 69kV #107 Prairie Hill - #99 Ben Hur · shared with 1 other requestAdon Texas Sixteen LLCBattery storage (paired with solar)51.7Jan 2028In study
Findley SolarTap 69kV #107 Prairie Hill - #99 Ben Hur · shared with 1 other requestAdon Texas Sixteen LLCSolar50.3Jan 2028In study
Chariot Storagetap 69kV 99 Ben Hur - 107 Prairie HillChariot Storage LLCBattery storage (stand-alone)50.0Feb 2028In study
Naduah SolarTap 69kV Ben Hur (99) - Prairie Hill (107)Gransolar Texas Fifteen, LLCSolar77.6Apr 2028In study

Crowded connection points in Limestone County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Prairie Hill (107) 69 kV 5 requests · 306 MW · 4 in Limestone County, 1 in Navarro5 in study
  • Naduah Solar 24INR0127 · Solar · 78 MW · In study
  • Eytcheson Ranches Solar 24INR0120 · Solar · 76 MW · In study · Navarro
  • Findley BESS 28INR0048 · Battery storage · 52 MW · In study
  • Findley Solar 25INR0021 · Solar · 50 MW · In study
  • Chariot Storage 21INR0260 · Battery storage · 50 MW · In study
Groesbeck Main (3634) 138 kV 3 requests · 447 MW3 signed; security posted
  • Fewell Solar 23INR0367 · Solar · 204 MW · Signed; security posted
  • Bonham Solar SLF 25INR0199 · Solar · 138 MW · Signed; security posted
  • Bonham Storage SLF 26INR0619 · Battery storage · 105 MW · Signed; security posted
MEXIA_2_1_8 (3632) 138 kV 2 requests · 243 MW2 signed; security posted
  • Bonham Solar SLF 25INR0199 · Solar · 138 MW · Signed; security posted
  • Bonham Storage SLF 26INR0619 · Battery storage · 105 MW · Signed; security posted

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Limestone County

  • Limestone County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 9, Waco: 6801 Sanger Ave, Ste 2500, Waco TX 76710-7826, 254-751-0335; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Limestone County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Limestone County.

Permits and reviews for Limestone County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Limestone County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Limestone County connects to the grid

Limestone County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Limestone County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Limestone County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 9

Bell · Bosque · Brazos · Burleson · Coryell · Falls · Freestone · Grimes · Hamilton · Hill · Lampasas · Leon · Madison · McLennan · Milam · Mills · Robertson · San Saba · Washington

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources