Energy land, checked. Solar, wind, battery, and data-center projects, the permits they need, and the grid they plug into. Start here →
Parcel & Grid

Home › Texas › McLennan County

McLennan County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects17
Total capacity3,383MW
Signed agreements9of 17
New since August0requests

17 proposed energy projects from ERCOT's September 2026 report, plus who to call in McLennan County and in TCEQ Region 9 before signing a solar, wind, or battery storage lease.

Check land in McLennan CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for McLennan County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in McLennan County?

ERCOT's September 2026 interconnection report lists 17 proposed energy projects in McLennan County (5 solar, 2 wind, 8 battery storage and 2 gas), about 3,383 MW in all. 9 of the 17 have a signed interconnection agreement, and 1 has been approved for energization or synchronization. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.

What stands out in McLennan County

By capacity, battery storage leads in McLennan County with 1,679 MW across 8 projects, followed by solar (5 projects, 887 MW) and wind (2 projects, 594 MW). The largest single project is Axtell BESS, a 307 MW stand-alone battery storage project listed under PP Axtell BESS LLC, still in study, and its target online date is Apr 2029. Of the 17, 8 are still in ERCOT's study process, 8 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 345 kV (9 projects), 138 kV (4 projects) and 69 kV (1 project) (why the voltage matters). Albatross Solar, LLC and Ferrovial Energy US 1 are each listed on 2 projects; 15 different companies appear in all. Target online dates for the projects not yet running span Feb 2027 to Jun 2030. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Prairie Hill Windtap 345kV 3405 Tradinghouse - 3402 Lake CreekPrairie Hill LLCWind297.2Sep 2027Approved for synchronization
Graphic Packaging GasTap 138kV 3446 Peppervine Switch - 3544 Castleman SubstationGraphic Packaging InternationalGas turbine43.4Feb 2027Signed; security posted
Tokio SolarTap 138kV 3592 Waco Atco - 170 Cotton BeltGransolar Texas Eight, LLCSolar170.4Aug 2027Signed; security posted
Pepper Solar FarmTap 345kV 3405 THOUSE__5 - 3406 ELM_MOTT_5Pepper Solar Farm LLCSolar120.7Sep 2027Signed; security posted
Jaguar SolarTap 345kV 13405 Tradinghouse SES - 68090 Sam SwitchPP Jaguar Solar LLCSolar300.9Dec 2027Signed; security posted
Neutron StorageTap 345kV 13405 Trading House - 68090 Sam SwitchElawan Neutron Storage, LLCBattery storage (stand-alone)104.5Apr 2028Signed; security posted
Cibeles Solar3379 Tiger Creek Switch (TIGERCREEK_5) 345 kV SubstationElawan Cibeles Solar, LLCSolar252.3Aug 2028Signed; security posted
Albatross BESSFrom Bus #165 Windsor Switch To Bus #161 McGregorAlbatross Solar, LLCBattery storage (stand-alone)50.4Dec 2028Signed; security posted
Albatross BESS 2Tap 138kV 165 Windsor Switch - 161 McGregorAlbatross Solar, LLCBattery storage (stand-alone)159.6Dec 2028Signed; security posted
Braswell SolarTap 69kV 147 Lorena - 3580 Eddy Substation (Will be converted to 13...Gransolar Texas Nine, LLCSolar42.6Mar 2028In study
PowerVault BESSTap 345kV 3406 Elm Mott - 3405 Tradinghouse SesSMT Elm Mott BESSBattery storage (stand-alone)254.8Jul 2028In study
Prairie Phoenix Wind3403 Lake Hall 345kVPrairie Hill Wind Project LLCWind297.2Aug 2028In study
Finch Storage165 WINDSORSW 138kVFinch Storage, LLCBattery storage (stand-alone)201.3Sep 2028In study
Axtell BESS345 kV Tiger Creek Switch (#3379)PP Axtell BESS LLCBattery storage (stand-alone)306.9Apr 2029In study
Brazos Energy Center 1Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5> · shared with 1 other requestFerrovial Energy US 1Battery storage (stand-alone)300.6Sep 2029In study
Brazos Energy Center 2Tap <345><3791><POSSUMTROT_5 >-<3403> <LAKE_HALL_5> · shared with 1 other requestFerrovial Energy US 1Battery storage (stand-alone)300.6Sep 2029In study
Infrakey Waco Data Park Gas 1Tap 345kV 246 BOSQUESW5 – 3406 ELM_MOTT__5Infrakey Capital LLCGas turbine180.0Jun 2030In study
Infrakey Waco Data Park Gas 2252 BOSQUESW8 138kVInfrakey Capital LLCGas turbine0 no capacity changeJun 2030In study

Crowded connection points in McLennan County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Tradinghouse (3405) 345 kV 5 requests · 974 MW · 3 in McLennan County, 2 in Falls3 in study, 1 approved for synchronization, 1 signed; security posted
  • Prairie Hill Wind 19INR0100 · Wind · 297 MW · Approved for synchronization
  • Pepper Solar Farm 26INR0380 · Solar · 121 MW · Signed; security posted
  • RIVERBEND SOLAR SLF 25INR0297 · Solar · 302 MW · In study · Falls
  • PowerVault BESS 26INR0422 · Battery storage · 255 MW · In study
  • RIVERBEND STORAGE SLF 25INR0311 · Battery storage · 0 MW · In study · Falls
Windsor (165) 138 kV 3 requests · 411 MW2 signed; security posted, 1 in study
  • Albatross BESS 2 25INR0579 · Battery storage · 160 MW · Signed; security posted
  • Albatross BESS 25INR0071 · Battery storage · 50 MW · Signed; security posted
  • Finch Storage 28INR0363 · Battery storage · 201 MW · In study
ELM_MOTT_5 (3406) 345 kV 3 requests · 556 MW2 in study, 1 signed; security posted
  • Pepper Solar Farm 26INR0380 · Solar · 121 MW · Signed; security posted
  • PowerVault BESS 26INR0422 · Battery storage · 255 MW · In study
  • Infrakey Waco Data Park Gas 1 28INR0294 · Gas turbine · 180 MW · In study
LAKE_HALL_5 (3403) 345 kV 3 requests · 898 MW3 in study
  • Brazos Energy Center 1 29INR0229 · Battery storage · 301 MW · In study
  • Brazos Energy Center 2 29INR0230 · Battery storage · 301 MW · In study
  • Prairie Phoenix Wind 27INR0607 · Wind · 297 MW · In study
Tradinghouse Ses (13405) 345 kV 2 requests · 405 MW2 signed; security posted
  • Jaguar Solar 24INR0038 · Solar · 301 MW · Signed; security posted
  • Neutron Storage 26INR0252 · Battery storage · 104 MW · Signed; security posted
SAM (68090) 345 kV 9 requests · 2,751 MW · 2 in McLennan County, 7 in Hill5 signed; security posted, 2 approved for synchronization, 2 in study
  • Compadre Solar 24INR0023 · Solar · 406 MW · Approved for synchronization · Hill
  • Compadre Solar II 25INR0166 · Solar · 201 MW · Approved for synchronization · Hill
  • Blue Skies BESS 25INR0046 · Battery storage · 306 MW · Signed; security posted · Hill
  • Jaguar Solar 24INR0038 · Solar · 301 MW · Signed; security posted
  • OCI Cobb Creek Solar 25INR0229 · Solar · 203 MW · Signed; security posted · Hill
  • OCI Cobb Creek ESS 25INR0233 · Battery storage · 202 MW · Signed; security posted · Hill
  • Neutron Storage 26INR0252 · Battery storage · 104 MW · Signed; security posted
  • Seven Angels Energy Storage I 28INR0472 · Battery storage · 514 MW · In study · Hill
  • Seven Angels Energy Storage II 28INR0473 · Battery storage · 514 MW · In study · Hill
Tiger Creek (3379) 345 kV 2 requests · 559 MW1 signed; security posted, 1 in study
  • Cibeles Solar 24INR0356 · Solar · 252 MW · Signed; security posted
  • Axtell BESS 28INR0157 · Battery storage · 307 MW · In study
Mcgregor (161) 138 kV 2 requests · 210 MW2 signed; security posted
  • Albatross BESS 2 25INR0579 · Battery storage · 160 MW · Signed; security posted
  • Albatross BESS 25INR0071 · Battery storage · 50 MW · Signed; security posted
POSSUMTROT_5 (3791) 2 requests · 601 MW2 in study
  • Brazos Energy Center 1 29INR0229 · Battery storage · 301 MW · In study
  • Brazos Energy Center 2 29INR0230 · Battery storage · 301 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in McLennan County

  • McLennan County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 9, Waco: 6801 Sanger Ave, Ste 2500, Waco TX 76710-7826, 254-751-0335; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • McLennan County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for McLennan County.

Permits and reviews for McLennan County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in McLennan County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on McLennan County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.

How a project in McLennan County connects to the grid

McLennan County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in McLennan County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in McLennan County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 9

Bell · Bosque · Brazos · Burleson · Coryell · Falls · Freestone · Grimes · Hamilton · Hill · Lampasas · Leon · Limestone · Madison · Milam · Mills · Robertson · San Saba · Washington

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources