11 proposed energy projects from ERCOT's September 2026 report, plus who to call in Leon County and in TCEQ Region 9 before signing a solar, wind, or battery storage lease.
Check land in Leon CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Leon County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Leon County?
ERCOT's September 2026 interconnection report lists 11 proposed energy projects in Leon County (5 solar, 5 battery storage and 1 gas), about 4,106 MW in all. 4 of the 11 have a signed interconnection agreement.
What stands out in Leon County
By capacity, gas leads in Leon County with 1,981 MW across 1 project, followed by solar (5 projects, 1,312 MW) and battery storage (5 projects, 813 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is BM Great Rock Energy Center, a 1,981 MW gas combined cycle project listed under Black Mountain Energy Storage II, still in study, and its target online date is May 2029. Of the 11, 7 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 3 have posted security or started construction. Connection points are mostly at 138 kV (5 projects) and 345 kV (4 projects) (why the voltage matters). Each of the 11 projects is listed under a different company. Target online dates for the projects not yet running span May 2027 to May 2029. All of them fall in ERCOT's North load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Pecan Prairie NorthCTT Yellow Wolf, bus # 79007 · shared with 1 other request | CG Leon County II LLC | Solar | 324.1 | May 2027 | Signed; security posted |
| Pecan Prairie SouthCTT Yellow Wolf, bus # 79007 · shared with 1 other request | ConnectGen Operating LLC | Solar | 133.0 | May 2027 | Signed; security posted |
| Hollow Branch Creek SolarTap 345kV 3390 Jewett - 44645 Singleton | Hollow Branch Creek Solar LLC | Solar | 460.0 | Jun 2028 | Signed; security posted |
| Great Rock BESSTap 345kV 46020 Limestone - 967 Gibbon Creek Ckt 18 | Great Rock Storage LLC | Battery storage (stand-alone) | 300.9 | Dec 2027 | Signed Aug 2024 |
| Nickel Spruce SolarTap 138kV 6735 Pleasant Springs Switching Station - 6736 Middl | Nickel Spruce Solar LLC | Solar | 150.0 | Dec 2027 | In study |
| Leon BESSTab 138kv 3355 Grapeland_Magnolia - 3357 Pleasant_Springs. | Leon BESS | Battery storage (paired with solar) | 153.7 | Feb 2028 | In study |
| Dempsey Solar SLFTap 138 KV Ridge (#37)-Robertson (#32) line; BEPC | Dempsey Solar LLC | Solar | 245.3 | Sep 2028 | In study |
| Dempsey Storage SLFTap the 138 KV Ridge (#37)-Robertson (#32) line; BEPC | Dempsey Storage LLC | Battery storage (paired with solar) | Self-limiting | Sep 2028 | In study |
| Kahla StorageTap 345kV 46020 Limestone 967 Gibbons Creek Circuit 50 | BT Kahla Storage, LLC | Battery storage (stand-alone) | 200.9 | Dec 2028 | In study |
| Pecan BESS(PSSE BUS# 47) HILTOPLKS8 138kV | Gransolar Texas Three LLC | Battery storage (stand-alone) | 157.1 | Dec 2028 | In study |
| BM Great Rock Energy CenterTap <345kV> <967> <GIBN_CREK_5> - <46020> <LIMEST_POI_5> Ckt<18> an... | Black Mountain Energy Storage II | Gas combined cycle | 1,981.2 | May 2029 | In study |
Crowded connection points in Leon County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Yellow Wolf (79007) 345 kV 3 requests · 2,438 MW2 signed; security posted, 1 in study
- Pecan Prairie North 21INR0428 · Solar · 324 MW · Signed; security posted
- Pecan Prairie South 21INR0371 · Solar · 133 MW · Signed; security posted
- BM Great Rock Energy Center 30INR0091 · Gas combined cycle · 1,981 MW · In study
Limestone (46020) 345 kV 12 requests · 5,105 MW · 3 in Leon County, 9 in Freestone, Navarro, Madison8 in study, 2 signed, 1 approved for synchronization, 1 signed; security posted
- Piedra Solar 25INR0168 · Solar · 282 MW · Approved for synchronization · Freestone
- Piedra BESS 25INR0169 · Battery storage · 104 MW · Signed; security posted · Freestone
- Jewett Energy Center 1 Gas 29INR0150 · Gas combined cycle · 1,274 MW · Signed Jul 2026 · Freestone
- Great Rock BESS 25INR0230 · Battery storage · 301 MW · Signed Aug 2024
- BM Great Rock Energy Center 30INR0091 · Gas combined cycle · 1,981 MW · In study
- Simsboro Storage 29INR0119 · Battery storage · 302 MW · In study · Freestone
- Masava Storage 25INR0176 · Battery storage · 257 MW · In study · Madison
- Savannah Oaks Solar 25INR0286 · Solar · 201 MW · In study · Madison
- Kahla Storage 25INR0513 · Battery storage · 201 MW · In study
- Pisgah Ridge Solar 2 24INR0086 · Solar · 102 MW · In study · Navarro
- Pisgah Ridge Storage 3 24INR0087 · Battery storage · 101 MW · In study · Navarro
- Three Canes Gas P2 27INR0652 · Gas engines · 0 MW · In study · Freestone
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Leon County
- Leon County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 9, Waco: 6801 Sanger Ave, Ste 2500, Waco TX 76710-7826, 254-751-0335; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Leon County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Leon County.
Permits and reviews for Leon County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Leon County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Leon County connects to the grid
Leon County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Leon County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Leon County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.