Grimes County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects18
Total capacity5,140MW
Signed agreements7of 18
New since August0requests

18 proposed energy projects from ERCOT's September 2026 report, plus who to call in Grimes County and in TCEQ Region 9 before signing a solar, wind, or battery storage lease.

Check land in Grimes CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Grimes County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Grimes County?

ERCOT's September 2026 interconnection report lists 18 proposed energy projects in Grimes County (6 solar, 8 battery storage, 3 gas and 1 other), about 5,140 MW in all. 7 of the 18 have a signed interconnection agreement, and 2 have been approved for energization or synchronization.

What stands out in Grimes County

By capacity, battery storage leads in Grimes County with 2,186 MW across 8 projects, followed by gas (3 projects, 1,746 MW) and solar (6 projects, 1,158 MW). The largest single project is Central Power Station, a 750 MW gas turbine project listed under Hydra-Gen Energy Unlimited, still in study, and its target online date is May 2027. Of the 18, 11 are still in ERCOT's study process, 4 have a signed interconnection agreement but no security posted yet, 1 has posted security or started construction and 2 are approved for energization or synchronization. Connection points are mostly at 345 kV (13 projects) and 138 kV (5 projects) (why the voltage matters). Blue Jay Solar I, LLC, ProEnergy Services, LLC and Smith Lake Solar are each listed on 2 projects; 14 different companies appear in all. Target online dates for the projects not yet running span Feb 2026 to Dec 2029. All of them fall in ERCOT's North load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Blue Jay Solar4 Iola 138kV · shared with 1 other requestBlue Jay Solar I, LLCSolar141.1Sep 2025Approved for synchronization
Blue Jay Solar II4 Iola 138kV · shared with 1 other requestBlue Jay Solar I, LLCSolar69.0Oct 2025Approved for synchronization
Eagle Claw Energy CenterSingleton (Bus #44645) - Zenith (Bus #44900) Circuit #99 345 kVEagle Claw Energy Center, LLCBattery storage (stand-alone)204.6Mar 2028Signed; security posted
Hill Valley BESS345 kV Singleton (#44645) · shared with 1 other requestHill Valley BESS, LLCBattery storage (stand-alone)245.8Jul 2028Signed Apr 2026
Misty Hollow BESS345 kV Singleton (#44645) · shared with 1 other requestClear Fork BESS, LLCBattery storage (stand-alone)245.8Jul 2028Signed Dec 2025
Smith Lake Storage DCTap 345kV 44645 Singleton - 44900 Zenith Ckt #99Smith Lake SolarBattery storage (paired with solar)65.0Dec 2028Signed Dec 2025
Smith Lake Solar DCTAP 345 KV 44645 SINGLETON - 44900 ZENITH Ckt #99Smith Lake SolarSolar402.0Dec 2028Signed Dec 2025
GRIMES SOLAR40600 Roans Prairie 345kVCG Grimes County LLCSolar153.4Feb 2026 date passed; status per ERCOTIn study
Central Power Station967 Gibbons Creek 345kVHydra-Gen Energy UnlimitedGas turbine750.0May 2027In study
Vaughn Energy Storage13 Keith 138kVVaughn Battery Storage, LLCBattery storage (stand-alone)200.6Dec 2027In study
Turin TxHSR TPSS HN-68 Crutchfield 138kVTexas Central Rail Holdings, LLCOther50.0Jul 2028In study
Scrap Iron SolarTap 138kV (#9) Bedias - (#25) North ZulchEnergiekontor US Texas SP 15 LLCSolar110.8Sep 2028In study
Millsing BESS44645 CNP Singleton 345kVMillsing BESSBattery storage (stand-alone)501.6Oct 2028In study
Diamante BESS40600 ROANS__POI_5 345kVBESS DIAMANTE LLCBattery storage (stand-alone)513.7Nov 2028In study
Treehouse SolarTap the 345 kV Jewett (#3390) - Singleton (#44645) lineTreehouse Solar, LLCSolar281.8Nov 2028In study
Treehouse StorageTap the 345 kV Jewett (#3390) - Singleton (#44645) line, ONCORTreehouse Solar, LLCBattery storage (paired with solar)209.2Nov 2028In study
Tyler Rose Power Plant 1Tap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek · shared with 1 other requestProEnergy Services, LLCGas turbine597.4Jul 2029In study
Tyler Rose Power Plant 2Tap 345 kV Circuit 18 (#44920) Mission - (#967) Gibbons Creek · shared with 1 other requestProEnergy Services, LLCGas turbine398.2Dec 2029In study

Crowded connection points in Grimes County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Singleton (44645) 345 kV 10 requests · 2,817 MW · 8 in Grimes County, 2 in Leon, Madison5 signed, 3 in study, 2 signed; security posted
  • Hollow Branch Creek Solar 24INR0422 · Solar · 460 MW · Signed; security posted · Leon
  • Eagle Claw Energy Center 27INR0085 · Battery storage · 205 MW · Signed; security posted
  • Smith Lake Solar DC 24INR0172 · Solar · 402 MW · Signed Dec 2025
  • Hill Valley BESS 26INR0285 · Battery storage · 246 MW · Signed Apr 2026
  • Misty Hollow BESS 26INR0324 · Battery storage · 246 MW · Signed Dec 2025
  • Tex-Bar ESS 26INR0411 · Battery storage · 202 MW · Signed Dec 2025 · Madison
  • Smith Lake Storage DC 25INR0045 · Battery storage · 65 MW · Signed Dec 2025
  • Millsing BESS 27INR0190 · Battery storage · 502 MW · In study
  • Treehouse Solar 28INR0394 · Solar · 282 MW · In study
  • Treehouse Storage 28INR0395 · Battery storage · 209 MW · In study
Zenith (44900) 345 kV 3 requests · 672 MW2 signed, 1 signed; security posted
  • Eagle Claw Energy Center 27INR0085 · Battery storage · 205 MW · Signed; security posted
  • Smith Lake Solar DC 24INR0172 · Solar · 402 MW · Signed Dec 2025
  • Smith Lake Storage DC 25INR0045 · Battery storage · 65 MW · Signed Dec 2025
Roans Prairie (40600) 345 kV 2 requests · 667 MW2 in study
  • Diamante BESS 27INR0115 · Battery storage · 514 MW · In study
  • GRIMES SOLAR 26INR0004 · Solar · 153 MW · In study
Jewett (3390) 345 kV 7 requests · 1,862 MW · 2 in Grimes County, 5 in Falls, Leon, Madison3 in study, 2 approved for synchronization, 1 signed; security posted, 1 signed
  • Roseland Solar 20INR0205 · Solar · 254 MW · Approved for synchronization · Falls
  • Roseland Solar II 22INR0506 · Solar · 254 MW · Approved for synchronization · Falls
  • Hollow Branch Creek Solar 24INR0422 · Solar · 460 MW · Signed; security posted · Leon
  • Tex-Bar ESS 26INR0411 · Battery storage · 202 MW · Signed Dec 2025 · Madison
  • Treehouse Solar 28INR0394 · Solar · 282 MW · In study
  • Treehouse Storage 28INR0395 · Battery storage · 209 MW · In study
  • Avant Prairie BESS 27INR0316 · Battery storage · 202 MW · In study · Freestone
Bus 44920 (44920) 345 kV 2 requests · 996 MW2 in study
  • Tyler Rose Power Plant 1 29INR0333 · Gas turbine · 597 MW · In study
  • Tyler Rose Power Plant 2 29INR0336 · Gas turbine · 398 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Grimes County

  • Grimes County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 9, Waco: 6801 Sanger Ave, Ste 2500, Waco TX 76710-7826, 254-751-0335; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Grimes County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Grimes County.

Permits and reviews for Grimes County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Grimes County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

Recent local action: In April 2026 the Grimes County Commissioners Court approved, on a split vote, wording changes that make data centers and battery energy storage systems eligible for county tax abatements; solar and wind farms were not made eligible. KXXV reported that residents raised concerns at the meeting and that County Judge Joe Fauth said no one had yet applied. (KXXV (25 News); checked October 17, 2026).

How a project in Grimes County connects to the grid

Grimes County is on the ERCOT grid. The projects listed above are in ERCOT's North load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Grimes County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Grimes County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 9

Bell · Bosque · Brazos · Burleson · Coryell · Falls · Freestone · Hamilton · Hill · Lampasas · Leon · Limestone · Madison · McLennan · Milam · Mills · Robertson · San Saba · Washington

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.