Ward County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
13 proposed energy projects from ERCOT's September 2026 report, plus who to call in Ward County and in TCEQ Region 7 before signing a solar, wind, or battery storage lease.
Check land in Ward CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Ward County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Ward County?
ERCOT's September 2026 interconnection report lists 13 proposed energy projects in Ward County (2 solar, 6 battery storage and 5 gas), about 3,429 MW in all. 4 of the 13 have a signed interconnection agreement, and 1 has been approved for energization or synchronization. 1 is new since August.
What stands out in Ward County
By capacity, gas leads in Ward County with 2,258 MW across 5 projects, followed by battery storage (6 projects, 906 MW) and solar (2 projects, 264 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is BasRanch (TEF - Due Diligence), a 1,350 MW gas combined cycle project listed under CPV Basin Ranch, LLC, with its agreement signed and security posted, and its target online date is Dec 2028. Of the 13, 9 are still in ERCOT's study process, 3 have posted security or started construction and 1 is approved for energization or synchronization. Connection points are mostly at 138 kV (8 projects) and 345 kV (5 projects) (why the voltage matters). Permian Power I LLC and Thornton Ranch Solar, LLC are each listed on 2 projects; 11 different companies appear in all. Target online dates for the projects not yet running span Apr 2027 to Apr 2030. All of them fall in ERCOT's West load zone. 1 is new since August.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Staghorn GasSTATION NAME: STAGHORN | RPC Merchant LLC | Gas engines | 10.0 | Oct 2026 | Approved for synchronization |
| Vast Sands Power I (TEF -Due Diligence)Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2 · shared with 1 other request | Permian Power I LLC | Gas turbine | 440.0 | May 2028 | Signed; security posted |
| Vast Sands Power II (TEF-Due Diligence)Tap 345kV 11010 Wolf Switch - 11188 Quarry Field Switch Ckt 2 · shared with 1 other request | Permian Power I LLC | Gas turbine | 440.0 | Jun 2028 | Signed; security posted |
| BasRanch (TEF - Due Diligence)tap 345kV Riverton Switch - Sand Lake Switch | CPV Basin Ranch, LLC | Gas combined cycle | 1,350.0 | Dec 2028 | Signed; security posted |
| FLIFER Solar ITap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197) | FLIFER LLC | Solar | 84.0 | Apr 2027 | In study |
| Frizzle BESS#38143, TNSLVRLEAF1, 138kV | Frizzle BESS, L.L.C. | Battery storage (stand-alone) | 180.9 | Oct 2027 | In study |
| Proteus Thornton Ranch Solar SLF37990 TNSTAGHORN1 138kV · shared with 1 other request | Thornton Ranch Solar, LLC | Solar | 180.0 | Nov 2028 | In study |
| Proteus Thornton Ranch Storage SLF37990 TNSTAGHORN1 138kV · shared with 1 other request | Thornton Ranch Solar, LLC | Battery storage (paired with solar) | Self-limiting | Nov 2028 | In study |
| BRP Pyxis BESStap 138kV 1009 Yucca - 11197 Sand Tank Pod | BRP Pyxis BESS LLC | Battery storage (stand-alone) | 206.9 | Dec 2028 | In study |
| BRP Rhine BESSTap 345kV 11188 QUARRYFLD - 11010 WOLF | BRP Rhine BESS LLC | Battery storage (stand-alone) | 206.9 | Dec 2028 | In study |
| Shallow Valley Storage NewTap 138kV 1239 Coyanosa - 11238 Blair Lake Sub · shared with 1 other request | Shallow Valley Storage, LLC | Battery storage | 103.4 | Apr 2029 | In study |
| New Minglewood Energy Center#11098 Sand Lake Switch Station (SANDLAKE_5) 345kV | Nova Clean Energy LLC | Battery storage (stand-alone) | 208.3 | Sep 2029 | In study |
| Monahans Power GasTap #1107 Monahans Tap 2 to #11117 Pecos Trail 138kV | Liberty Power Innovations LLC | Gas engines | 18.2 | Apr 2030 | In study |
Crowded connection points in Ward County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Quarry Field (11188) 345 kV 3 requests · 1,087 MW2 signed; security posted, 1 in study
- Vast Sands Power I (TEF -Due Diligence) 28INR0105 · Gas turbine · 440 MW · Signed; security posted
- Vast Sands Power II (TEF-Due Diligence) 28INR0109 · Gas turbine · 440 MW · Signed; security posted
- BRP Rhine BESS 23INR0075 · Battery storage · 207 MW · In study
Wolf (11010) 345 kV 10 requests · 2,931 MW · 3 in Ward County, 7 in Ector6 in study, 3 signed; security posted, 1 approved for synchronization
- Greyhound Solar 21INR0268 · Solar · 335 MW · Approved for synchronization · Ector
- Vast Sands Power I (TEF -Due Diligence) 28INR0105 · Gas turbine · 440 MW · Signed; security posted
- Vast Sands Power II (TEF-Due Diligence) 28INR0109 · Gas turbine · 440 MW · Signed; security posted
- Sisters Solar 21INR0265 · Solar · 101 MW · Signed; security posted · Ector
- Gypsum Plains Solar 28INR0205 · Solar · 503 MW · In study · Ector
- Velociraptor BESS II 28INR0323 · Battery storage · 246 MW · In study · Ector
- Velociraptor Solar II 28INR0322 · Solar · 242 MW · In study · Ector
- Gypsum Plains Storage 28INR0217 · Battery storage · 211 MW · In study · Ector
- BRP Rhine BESS 23INR0075 · Battery storage · 207 MW · In study
- Sisters Solar II 28INR0177 · Solar · 206 MW · In study · Ector
Yucca (1009) 138 kV 2 requests · 291 MW2 in study
- BRP Pyxis BESS 23INR0094 · Battery storage · 207 MW · In study
- FLIFER Solar I 24INR0538 · Solar · 84 MW · In study
Sand Tank (11197) 138 kV 2 requests · 291 MW2 in study
- BRP Pyxis BESS 23INR0094 · Battery storage · 207 MW · In study
- FLIFER Solar I 24INR0538 · Solar · 84 MW · In study
TNSTAGHORN1 (37990) 138 kV 2 requests · 180 MW2 in study
- Proteus Thornton Ranch Solar SLF 25INR0606 · Solar · 180 MW · In study
- Proteus Thornton Ranch Storage SLF 25INR0607 · Battery storage · 0 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Ward County
- Ward County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 7, Midland: 10 Desta Dr, Ste 350E, Midland TX 79705-4530, 432-570-1359; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Ward County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Ward County.
Permits and reviews for Ward County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Ward County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Ward County connects to the grid
Ward County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Ward County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Ward County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 7
Andrews · Borden · Crane · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Winkler