Ector County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
21 proposed energy projects from ERCOT's September 2026 report, plus who to call in Ector County and in TCEQ Region 7 before signing a solar, wind, or battery storage lease.
Check land in Ector CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Ector County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Ector County?
ERCOT's September 2026 interconnection report lists 21 proposed energy projects in Ector County (11 solar and 10 battery storage), about 4,055 MW in all. 4 of the 21 have a signed interconnection agreement, and 2 have been approved for energization or synchronization.
What stands out in Ector County
By capacity, solar leads in Ector County with 2,523 MW across 11 projects, followed by battery storage (10 projects, 1,532 MW). The largest single project is Gypsum Plains Solar, a 503 MW solar project listed under Gypsum Plains Solar, LLC, still in study, and its target online date is Jun 2029. Of the 21, 17 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet, 1 has posted security or started construction and 2 are approved for energization or synchronization. Connection points are mostly at 345 kV (11 projects) and 138 kV (9 projects) (why the voltage matters). Gypsum Plains Solar, LLC is listed on the most projects here (4 of 21); 17 different companies appear in all. Target online dates for the projects not yet running span May 2027 to Jun 2030. All of them fall in ERCOT's West load zone. 1 that was listed in August has since dropped off.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Greyhound SolarTap 345kV 11010 Wolf - 1018 Moss | Rockhound Solar 2, LLC dba "Greyhound Solar" | Solar | 335.4 | Jun 2026 | Approved for synchronization |
| Apple BESSStation Name - Apple | Apple Infra LLC | Battery storage (stand-alone) | 9.9 | Nov 2026 | Approved for energization |
| Sisters Solartapping the 345 kV line connecting Moss Switch (Bus# 1018) to Wolf... | Oberon Solar LLC | Solar | 100.5 | Sep 2028 | Signed; security posted |
| Van Zandt Energy Storage1027 Odessa EHV Switch 138 kV | Rocky Mountain Energy Holdings, LLC | Battery storage (stand-alone) | 256.0 | May 2027 | Signed Mar 2025 |
| Momentum Hazy Jane BESSTap 138kV 1102 Judkins - 1110 Edward | MOMENTUM HAZY JANE, LLC | Battery storage (stand-alone) | 125.5 | Feb 2028 | In study |
| Seragio BESS11140 ECTRCNTYN_8 138kV | Seragio BESS, LLC | Battery storage (stand-alone) | 201.1 | Apr 2028 | In study |
| M-Bar BESS I1141 Holt Switch Substation 138 kV | M-Bar Energy I, LLC | Battery storage (paired with solar) | 82.1 | Sep 2028 | In study |
| M-Bar Solar I1141 Holt Switch Substation 138kV | M-Bar Energy I, LLC | Solar | 30.2 | Sep 2028 | In study |
| Ophelia SolarTap 138 kV Raceway Switch #18663 - Shin Oak POD #11128 | Ophelia Solar | Solar | 110.5 | Sep 2028 | In study |
| Sisters Solar - Phase 210009 McGee 345 kV | Oberon Solar IV, LLC | Solar | 201.5 | Sep 2028 | In study |
| Sisters Solar IItap 345kV 11010 Wolf Switching Station - 10012 Meteor | Oberon Solar III, LLC | Solar | 205.5 | Dec 2028 | In study |
| GPlains SolarTap 138kV #1013 WOLFSS_8 - #1103 SANDHLTA_8 | Gypsum Plains Solar, LLC | Solar | 151.3 | Jun 2029 | In study |
| GPlains StorageTap 138kV WOLFSS_8 (1013) - SANDHLTA_8 (1103) | Gypsum Plains Solar, LLC | Battery storage (paired with solar) | 51.3 | Jun 2029 | In study |
| Gypsum Plains SolarTap 345kv line Wolf BUS# 11010 - Reiter BUS#18544 | Gypsum Plains Solar, LLC | Solar | 503.1 | Jun 2029 | In study |
| Gypsum Plains StorageTap 345kv 11010 Wolf - 18544 Reiter | Gypsum Plains Solar, LLC | Battery storage (paired with solar) | 211.1 | Jun 2029 | In study |
| Firebird BESSTap 138kV #1099 Southwestern Portland Tap - #1052 Rexall | TX BESS 6, LLC | Battery storage (stand-alone) | 102.7 | Jun 2029 | In study |
| Velociraptor BESS I10012 METEOR_5 Substation 345kV | Velociraptor BESS I, LLC | Battery storage (paired with solar) | 246.0 | Dec 2029 | In study |
| Velociraptor BESS IITap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV · shared with 1 other request | Velociraptor BESS II, LLC | Battery storage (paired with solar) | 246.1 | Dec 2029 | In study |
| Velociraptor Solar I#10012 METEOR 5 Substation 345kV | Velociraptor Solar I, LLC | Solar | 241.7 | Dec 2029 | In study |
| Velociraptor Solar IITap Wolf (#11010) - Reiter Switch (#18544) Ckt1 345KV · shared with 1 other request | Velociraptor Solar II, LLC | Solar | 241.8 | Dec 2029 | In study |
| Jackrabbit Flats SolarTap 345 kV 1185 Midland County NW - 1018 Moss | Jackrabbit Flats Solar LLC | Solar | 401.3 | Jun 2030 | In study |
No longer listed since August
These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.
- EMPower Odessa (TEF - Due Diligence), gas engines, 123 MW (EMPOWER USA, LLC)
Crowded connection points in Ector County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Wolf (11010) 345 kV 10 requests · 2,931 MW · 7 in Ector County, 3 in Ward6 in study, 3 signed; security posted, 1 approved for synchronization
- Greyhound Solar 21INR0268 · Solar · 335 MW · Approved for synchronization
- Vast Sands Power I (TEF -Due Diligence) 28INR0105 · Gas turbine · 440 MW · Signed; security posted · Ward
- Vast Sands Power II (TEF-Due Diligence) 28INR0109 · Gas turbine · 440 MW · Signed; security posted · Ward
- Sisters Solar 21INR0265 · Solar · 101 MW · Signed; security posted
- Gypsum Plains Solar 28INR0205 · Solar · 503 MW · In study
- Velociraptor BESS II 28INR0323 · Battery storage · 246 MW · In study
- Velociraptor Solar II 28INR0322 · Solar · 242 MW · In study
- Gypsum Plains Storage 28INR0217 · Battery storage · 211 MW · In study
- BRP Rhine BESS 23INR0075 · Battery storage · 207 MW · In study · Ward
- Sisters Solar II 28INR0177 · Solar · 206 MW · In study
Reiter (18544) 345 kV 4 requests · 1,202 MW4 in study
- Gypsum Plains Solar 28INR0205 · Solar · 503 MW · In study
- Velociraptor BESS II 28INR0323 · Battery storage · 246 MW · In study
- Velociraptor Solar II 28INR0322 · Solar · 242 MW · In study
- Gypsum Plains Storage 28INR0217 · Battery storage · 211 MW · In study
Moss (1018) 345 kV 3 requests · 837 MW1 signed; security posted, 1 approved for synchronization, 1 in study
- Greyhound Solar 21INR0268 · Solar · 335 MW · Approved for synchronization
- Sisters Solar 21INR0265 · Solar · 101 MW · Signed; security posted
- Jackrabbit Flats Solar 30INR0141 · Solar · 401 MW · In study
Meteor (10012) 345 kV 3 requests · 693 MW3 in study
- Velociraptor BESS I 27INR0493 · Battery storage · 246 MW · In study
- Velociraptor Solar I 22INR0218 · Solar · 242 MW · In study
- Sisters Solar II 28INR0177 · Solar · 206 MW · In study
Holt (1141) 138 kV 2 requests · 112 MW2 in study
- M-Bar BESS I 27INR0422 · Battery storage · 82 MW · In study
- M-Bar Solar I 27INR0421 · Solar · 30 MW · In study
WOLFSS_8 (1013) 138 kV 2 requests · 203 MW2 in study
- GPlains Solar 28INR0227 · Solar · 151 MW · In study
- GPlains Storage 28INR0228 · Battery storage · 51 MW · In study
SANDHLTA_8 (1103) 138 kV 2 requests · 203 MW2 in study
- GPlains Solar 28INR0227 · Solar · 151 MW · In study
- GPlains Storage 28INR0228 · Battery storage · 51 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Ector County
- Ector County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 7, Midland: 10 Desta Dr, Ste 350E, Midland TX 79705-4530, 432-570-1359; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Ector County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Ector County.
Permits and reviews for Ector County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Ector County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
Recent local action: Ector County Commissioners Court minutes for October 28, 2025 record a 4-1 vote approving a Chapter 312 tax abatement agreement with Oberon Solar II, III and IV, LLC for a 4,689-acre tract north of I-20 in southwest Ector County; Commissioner Russell voted against. (Ector County commissioners court minutes; checked October 17, 2026).
How a project in Ector County connects to the grid
Ector County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Ector County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Ector County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 7
Andrews · Borden · Crane · Dawson · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Ward · Winkler