Andrews County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
9 proposed energy projects from ERCOT's September 2026 report, plus who to call in Andrews County and in TCEQ Region 7 before signing a solar, wind, or battery storage lease.
Check land in Andrews CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Andrews County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Andrews County?
ERCOT's September 2026 interconnection report lists 9 proposed energy projects in Andrews County (2 solar, 2 wind and 5 battery storage), about 2,212 MW in all. 1 of the 9 has a signed interconnection agreement.
What stands out in Andrews County
By capacity, battery storage leads in Andrews County with 1,118 MW across 5 projects, followed by wind (2 projects, 642 MW) and solar (2 projects, 452 MW). The largest single project is Blue Sage Wind, a 395 MW wind project listed under CPV Blue Sage Wind, LLC, still in study, and its target online date is Apr 2030. Of the 9, 8 are still in ERCOT's study process and 1 has posted security or started construction. Connection points are mostly at 138 kV (5 projects) and 345 kV (4 projects) (why the voltage matters). ENGIE IR Holdings LLC is listed on the most projects here (3 of 9); 7 different companies appear in all. Target online dates for the projects not yet running span Dec 2025 to Apr 2030. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Rodeo Solar138kV 11273 NELSON SWITCH | Core Solar SPV I, LLC | Solar | 200.0 | Nov 2026 | Signed; security posted |
| BRP Kamet BESSAndrews North – McKenzie Draw Switch 138 kV | BRP Kamet BESS LLC | Battery storage (stand-alone) | 202.5 | Dec 2025 date passed; status per ERCOT | In study |
| Trivor BESS1272 Fullerton 138kV | BRP Trivor BESS LLC | Battery storage (stand-alone) | 205.5 | Mar 2028 | In study |
| Tucana BESS1157 Andrews County South 138kV | BRP Tucana BESS LLC | Battery storage (stand-alone) | 201.3 | Mar 2028 | In study |
| BRP Kabru BESS1159 Andrew North - 11284 Blackbird 138kV | BRP Kabru BESS LLC | Battery storage (stand-alone) | 202.4 | Dec 2028 | In study |
| Straight Spur SolarTap 345 kV ClearFork (Bus #23876) to Gardenale Switch (Bus #11157) | ENGIE IR Holdings LLC | Solar | 251.8 | Apr 2029 | In study |
| Straight Spur StorageTap 345kV ClearFork( Bus # 23876) to Gardenale Switch (Bus # 11157) | ENGIE IR Holdings LLC | Battery storage (paired with solar) | 306.2 | Apr 2029 | In study |
| Straight Spur WindTap 345 kV 23876 Clear Fork -11157 Gardenale Switch | ENGIE IR Holdings LLC | Wind | 247.4 | Apr 2029 | In study |
| Blue Sage WindBUS #11270 - DOGHOUSE_5 - THE DOGHOUSE 345kV SUBSTATION | CPV Blue Sage Wind, LLC | Wind | 394.5 | Apr 2030 | In study |
Crowded connection points in Andrews County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Clear Fork (23876) 345 kV 3 requests · 805 MW3 in study
- Straight Spur Storage 27INR0386 · Battery storage · 306 MW · In study
- Straight Spur Solar 27INR0385 · Solar · 252 MW · In study
- Straight Spur Wind 27INR0384 · Wind · 247 MW · In study
Gardenale (11157) 345 kV 3 requests · 805 MW3 in study
- Straight Spur Storage 27INR0386 · Battery storage · 306 MW · In study
- Straight Spur Solar 27INR0385 · Solar · 252 MW · In study
- Straight Spur Wind 27INR0384 · Wind · 247 MW · In study
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Andrews County
- Andrews County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 7, Midland: 10 Desta Dr, Ste 350E, Midland TX 79705-4530, 432-570-1359; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Andrews County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Andrews County.
Permits and reviews for Andrews County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Andrews County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
How a project in Andrews County connects to the grid
Andrews County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Andrews County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Andrews County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 7
Borden · Crane · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Ward · Winkler