Borden County, Texas: solar, wind, and storage projects and permits
Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month
16 proposed energy projects from ERCOT's September 2026 report, plus who to call in Borden County and in TCEQ Region 7 before signing a solar, wind, or battery storage lease.
Check land in Borden CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.
Power reliability here: minutes without power per year, outages per year, and outage length for Borden County, 2013–2024, from the serving utilities' EIA filings.
What energy projects are proposed in Borden County?
ERCOT's September 2026 interconnection report lists 16 proposed energy projects in Borden County (10 solar and 6 battery storage), about 5,244 MW in all. 9 of the 16 have a signed interconnection agreement. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.
What stands out in Borden County
By capacity, solar leads in Borden County with 3,852 MW across 10 projects, followed by battery storage (6 projects, 1,392 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Magnet Solar, a 503 MW solar project listed under HyFuels Big Spring Solar LLC, with its agreement signed and security posted, and its target online date is Sep 2029. Of the 16, 7 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 8 have posted security or started construction. Connection points are mostly at 345 kV (14 projects) and 138 kV (1 project) (why the voltage matters). EG White Oak LLC is listed on the most projects here (3 of 16); 12 different companies appear in all. Target online dates for the projects not yet running span Nov 2026 to Dec 2029. All of them fall in ERCOT's West load zone.
A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.
Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.
Scroll the table sideways to see every column.
| Project and connection point | Developer as listed by ERCOT | Type | MW | Target online date iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date. | Stage |
|---|---|---|---|---|---|
| Lyra Solar345kV MULESHOE (#59922) · shared with 1 other request | Juno Solar 4 | Solar | 500.0 | Sep 2027 | Signed; security posted |
| Stephens Ranch Wind Repower59900 Long Draw 345 kV | Stephens Ranch Wind Energy, LLC | Wind | 12.4 | Nov 2027 | Signed; security posted |
| Antila Solar#59916 Buck Canyon 345kV · shared with 1 other request | Antila Solar LLC | Solar | 500.0 | Nov 2027 | Signed; security posted |
| Juno 3 Solar#59916 Buck Canyon 345kV · shared with 1 other request | Juno Solar 3 | Solar | 500.0 | Nov 2027 | Signed; security posted |
| Gail Mountain SolarMuleshoe (Bus #59922) 345 kV | Gail Mountain Solar, LLC | Solar | 244.4 | Aug 2028 | Signed; security posted |
| Uva Creek SolarMuleshoe #59922 345 KV | Grape Creek Solar, LLC | Solar | 302.2 | Aug 2028 | Signed; security posted |
| Magnet SolarFaraday Substation 345kV - Bus #59905 | HyFuels Big Spring Solar LLC | Solar | 503.1 | Sep 2029 | Signed; security posted |
| Caesar Solar59916 Buck Canyon 345 kV · shared with 1 other request | Caesar Solar, LLC | Solar | 181.6 | Nov 2029 | Signed; security posted |
| Caesar Storage59916 Buck Canyon 345 kV · shared with 1 other request | Caesar Solar, LLC | Battery storage (paired with solar) | 205.5 | Nov 2029 | Signed; security posted |
| Lyra Storage345kV MULESHOE (#59922) · shared with 1 other request | JUNO BESS I | Battery storage (paired with solar) | 500.0 | Nov 2026 | Signed Aug 2025 |
| Draco SolarTap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900)... | Draco Solar LLC | Solar | 500.0 | Aug 2027 | In study |
| Borden Dino BESS59905 FARADAY 345KV · shared with 1 other request | Borden Dino Solar, LLC | Battery storage (paired with solar) | 60.3 | Jul 2028 | In study |
| Borden Dino Solar59905 FARADAY 345KV · shared with 1 other request | Borden Dino Solar, LLC | Solar | 120.5 | Jul 2028 | In study |
| Enfinity White Oak BESSTap 138kV Key (1307) to 138kV Gail (1308) | EG White Oak LLC | Battery storage (stand-alone) | 200.0 | Sep 2029 | In study |
| Magnet StorageFaraday 345 kV Substation (#59905) | HyFuels Big Spring LLC | Battery storage (paired with solar) | 426.7 | Sep 2029 | In study |
| Enfinity Post Oak Solar SLF345kV Muleshoe (59922) · shared with 1 other request | EG White Oak LLC | Solar | 500.0 | Dec 2029 | In study |
| Enfinity Post Oak Storage SLF345kV Muleshoe (59922) · shared with 1 other request | EG White Oak LLC | Battery storage (paired with solar) | Self-limiting | Dec 2029 | In study |
Crowded connection points in Borden County
Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.
Muleshoe (59922) 345 kV 6 requests · 2,047 MW3 signed; security posted, 2 in study, 1 signed
- Lyra Solar 27INR0434 · Solar · 500 MW · Signed; security posted
- Uva Creek Solar 26INR0359 · Solar · 302 MW · Signed; security posted
- Gail Mountain Solar 28INR0176 · Solar · 244 MW · Signed; security posted
- Lyra Storage 26INR0636 · Battery storage · 500 MW · Signed Aug 2025
- Enfinity Post Oak Solar SLF 29INR0291 · Solar · 500 MW · In study
- Enfinity Post Oak Storage SLF 29INR0292 · Battery storage · 0 MW · In study
Faraday (59905) 345 kV 5 requests · 1,611 MW4 in study, 1 signed; security posted
- Magnet Solar 28INR0297 · Solar · 503 MW · Signed; security posted
- Draco Solar 27INR0499 · Solar · 500 MW · In study
- Magnet Storage 28INR0298 · Battery storage · 427 MW · In study
- Borden Dino Solar 27INR0480 · Solar · 120 MW · In study
- Borden Dino BESS 27INR0481 · Battery storage · 60 MW · In study
Buck Canyon (59916) 345 kV 4 requests · 1,387 MW4 signed; security posted
- Juno 3 Solar 26INR0621 · Solar · 500 MW · Signed; security posted
- Antila Solar 27INR0500 · Solar · 500 MW · Signed; security posted
- Caesar Storage 29INR0132 · Battery storage · 206 MW · Signed; security posted
- Caesar Solar 29INR0131 · Solar · 182 MW · Signed; security posted
What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.
Who to contact in Borden County
- Borden County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
- TCEQ Region 7, Midland: 10 Desta Dr, Ste 350E, Midland TX 79705-4530, 432-570-1359; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
- Borden County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
- Flood maps: FEMA map search for Borden County.
Permits and reviews for Borden County
Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Borden County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.
Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Borden County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.
How a project in Borden County connects to the grid
Borden County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.
How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.
Solar for homes and businesses in Borden County
Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.
Get the land report for a spot in Borden County
Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.
Other counties served by TCEQ Region 7
Andrews · Crane · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Ward · Winkler