Borden County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects16
Total capacity5,244MW
Signed agreements9of 16
New since August0requests

16 proposed energy projects from ERCOT's September 2026 report, plus who to call in Borden County and in TCEQ Region 7 before signing a solar, wind, or battery storage lease.

Check land in Borden CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Borden County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Borden County?

ERCOT's September 2026 interconnection report lists 16 proposed energy projects in Borden County (10 solar and 6 battery storage), about 5,244 MW in all. 9 of the 16 have a signed interconnection agreement. The table also lists 1 change to existing plants (repowers or capacity changes), not counted above.

What stands out in Borden County

By capacity, solar leads in Borden County with 3,852 MW across 10 projects, followed by battery storage (6 projects, 1,392 MW); 1 self-limiting project (reported at 0 MW because the resource limits its own output) is listed without a capacity. The largest single project is Magnet Solar, a 503 MW solar project listed under HyFuels Big Spring Solar LLC, with its agreement signed and security posted, and its target online date is Sep 2029. Of the 16, 7 are still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 8 have posted security or started construction. Connection points are mostly at 345 kV (14 projects) and 138 kV (1 project) (why the voltage matters). EG White Oak LLC is listed on the most projects here (3 of 16); 12 different companies appear in all. Target online dates for the projects not yet running span Nov 2026 to Dec 2029. All of them fall in ERCOT's West load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Lyra Solar345kV MULESHOE (#59922) · shared with 1 other requestJuno Solar 4Solar500.0Sep 2027Signed; security posted
Stephens Ranch Wind Repower59900 Long Draw 345 kVStephens Ranch Wind Energy, LLCWind12.4Nov 2027Signed; security posted
Antila Solar#59916 Buck Canyon 345kV · shared with 1 other requestAntila Solar LLCSolar500.0Nov 2027Signed; security posted
Juno 3 Solar#59916 Buck Canyon 345kV · shared with 1 other requestJuno Solar 3Solar500.0Nov 2027Signed; security posted
Gail Mountain SolarMuleshoe (Bus #59922) 345 kVGail Mountain Solar, LLCSolar244.4Aug 2028Signed; security posted
Uva Creek SolarMuleshoe #59922 345 KVGrape Creek Solar, LLCSolar302.2Aug 2028Signed; security posted
Magnet SolarFaraday Substation 345kV - Bus #59905HyFuels Big Spring Solar LLCSolar503.1Sep 2029Signed; security posted
Caesar Solar59916 Buck Canyon 345 kV · shared with 1 other requestCaesar Solar, LLCSolar181.6Nov 2029Signed; security posted
Caesar Storage59916 Buck Canyon 345 kV · shared with 1 other requestCaesar Solar, LLCBattery storage (paired with solar)205.5Nov 2029Signed; security posted
Lyra Storage345kV MULESHOE (#59922) · shared with 1 other requestJUNO BESS IBattery storage (paired with solar)500.0Nov 2026Signed Aug 2025
Draco SolarTap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900)...Draco Solar LLCSolar500.0Aug 2027In study
Borden Dino BESS59905 FARADAY 345KV · shared with 1 other requestBorden Dino Solar, LLCBattery storage (paired with solar)60.3Jul 2028In study
Borden Dino Solar59905 FARADAY 345KV · shared with 1 other requestBorden Dino Solar, LLCSolar120.5Jul 2028In study
Enfinity White Oak BESSTap 138kV Key (1307) to 138kV Gail (1308)EG White Oak LLCBattery storage (stand-alone)200.0Sep 2029In study
Magnet StorageFaraday 345 kV Substation (#59905)HyFuels Big Spring LLCBattery storage (paired with solar)426.7Sep 2029In study
Enfinity Post Oak Solar SLF345kV Muleshoe (59922) · shared with 1 other requestEG White Oak LLCSolar500.0Dec 2029In study
Enfinity Post Oak Storage SLF345kV Muleshoe (59922) · shared with 1 other requestEG White Oak LLCBattery storage (paired with solar)Self-limitingDec 2029In study

Crowded connection points in Borden County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Muleshoe (59922) 345 kV 6 requests · 2,047 MW3 signed; security posted, 2 in study, 1 signed
  • Lyra Solar 27INR0434 · Solar · 500 MW · Signed; security posted
  • Uva Creek Solar 26INR0359 · Solar · 302 MW · Signed; security posted
  • Gail Mountain Solar 28INR0176 · Solar · 244 MW · Signed; security posted
  • Lyra Storage 26INR0636 · Battery storage · 500 MW · Signed Aug 2025
  • Enfinity Post Oak Solar SLF 29INR0291 · Solar · 500 MW · In study
  • Enfinity Post Oak Storage SLF 29INR0292 · Battery storage · 0 MW · In study
Faraday (59905) 345 kV 5 requests · 1,611 MW4 in study, 1 signed; security posted
  • Magnet Solar 28INR0297 · Solar · 503 MW · Signed; security posted
  • Draco Solar 27INR0499 · Solar · 500 MW · In study
  • Magnet Storage 28INR0298 · Battery storage · 427 MW · In study
  • Borden Dino Solar 27INR0480 · Solar · 120 MW · In study
  • Borden Dino BESS 27INR0481 · Battery storage · 60 MW · In study
Buck Canyon (59916) 345 kV 4 requests · 1,387 MW4 signed; security posted
  • Juno 3 Solar 26INR0621 · Solar · 500 MW · Signed; security posted
  • Antila Solar 27INR0500 · Solar · 500 MW · Signed; security posted
  • Caesar Storage 29INR0132 · Battery storage · 206 MW · Signed; security posted
  • Caesar Solar 29INR0131 · Solar · 182 MW · Signed; security posted

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Borden County

  • Borden County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 7, Midland: 10 Desta Dr, Ste 350E, Midland TX 79705-4530, 432-570-1359; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Borden County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Borden County.

Permits and reviews for Borden County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Borden County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

Local action: as of October 17, 2026, we found no 2024–2026 commissioners court action on solar, wind, or battery storage posted on Borden County's website or reported by local news. Counties act mostly through tax abatement and road use agreements, so ask the county judge's office whether any are pending.

How a project in Borden County connects to the grid

Borden County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Borden County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Borden County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 7

Andrews · Crane · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Ward · Winkler

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.

Browse resources