Proposed projects3
Total capacity492MW
Signed agreements2of 3
New since August0requests

3 proposed energy projects from ERCOT's September 2026 report, plus who to call in Martin County and in TCEQ Region 7 before signing a solar, wind, or battery storage lease.

Check land in Martin CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Martin County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Martin County?

ERCOT's September 2026 interconnection report lists 3 proposed energy projects in Martin County (3 battery storage), about 492 MW in all. 2 of the 3 have a signed interconnection agreement.

What stands out in Martin County

By capacity, battery storage leads in Martin County with 492 MW across 3 projects. The largest single project is Jane Storage Energy Center, a 241 MW stand-alone battery storage project listed under NMRE Holdings, LLC, with its agreement signed and security posted, and its target online date is Nov 2030. Of the 3, 1 is still in ERCOT's study process, 1 has a signed interconnection agreement but no security posted yet and 1 has posted security or started construction. Connection points are mostly at 138 kV (2 projects) and 345 kV (1 project) (why the voltage matters). Each of the 3 projects is listed under a different company. Target online dates for the projects not yet running span May 2028 to Nov 2030. All of them fall in ERCOT's West load zone.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Jane Storage Energy Center59901 Grelton 345 kVNMRE Holdings, LLCBattery storage (stand-alone)240.6Nov 2030Signed; security posted
Picadillo BESS23837 Buffalo 138kVBlack Mountain Energy Storage IIBattery storage (stand-alone)100.8May 2028Signed Jan 2024
Stewart Grady BESSTap 138kV 11368 Expanse Switch – 23841 Sale RanchGrady BESSBattery storage (stand-alone)150.5Apr 2029In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Martin County

  • Martin County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 7, Midland: 10 Desta Dr, Ste 350E, Midland TX 79705-4530, 432-570-1359; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Martin County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Martin County.

Permits and reviews for Martin County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Martin County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Martin County connects to the grid

Martin County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Martin County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Martin County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 7

Andrews · Borden · Crane · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Midland · Pecos · Reeves · Terrell · Upton · Ward · Winkler