Crane County, Texas: solar, wind, and storage projects and permits

Queue data as of ERCOT's September 2026 GIS report · Contacts checked 2026-09-26 · Next update early next month

Proposed projects12
Total capacity2,740MW
Signed agreements5of 12
New since August0requests

12 proposed energy projects from ERCOT's September 2026 report, plus who to call in Crane County and in TCEQ Region 7 before signing a solar, wind, or battery storage lease.

Check land in Crane CountyOpens the land report with the map on the county; click a spot for its flood, wetland, habitat, line-distance and parcel check.

Power reliability here: minutes without power per year, outages per year, and outage length for Crane County, 2013–2024, from the serving utilities' EIA filings.

What energy projects are proposed in Crane County?

ERCOT's September 2026 interconnection report lists 12 proposed energy projects in Crane County (5 solar and 7 battery storage), about 2,740 MW in all. 5 of the 12 have a signed interconnection agreement.

What stands out in Crane County

By capacity, solar leads in Crane County with 1,370 MW across 5 projects, followed by battery storage (7 projects, 1,370 MW). The largest single project is Western Flats Storage, a 411 MW battery storage paired with solar project listed under Hecate Energy Point Mountain Solar Facility 1 LLC, still in study, and its target online date is Nov 2028. Of the 12, 7 are still in ERCOT's study process and 5 have a signed interconnection agreement but no security posted yet. Connection points are mostly at 138 kV (9 projects) and 345 kV (3 projects) (why the voltage matters). The single most-used connection point is 138 kV Soda Lake (#76026), shared by 4 projects. Crane I Solar Electric, LLC, Crane II Solar Electric, LLC and Hecate Energy Point Mountain Solar Facility 1 LLC are each listed on 2 projects; 8 different companies appear in all. Target online dates for the projects not yet running span Sep 2027 to Dec 2029. All of them fall in ERCOT's West load zone. 1 that was listed in August has since dropped off.

A listing is a request to study a grid connection, not a built project; the stage column says how far each one has gone.

Stage, most advanced first: Approved for synchronization (first power) · Approved for energization (backfeed) · Under construction · Signed; security posted (interconnection agreement signed and financial security posted) · Signed (agreement signed, security not yet posted) · In study (screening or full interconnection study, no agreement). A target date that has already passed is marked; ERCOT keeps the developer's last reported date until the developer changes it.

Scroll the table sideways to see every column.

Project and connection pointDeveloper as listed by ERCOTTypeMWTarget online date
iThe commercial operation date the developer reported to ERCOT (ERCOT calls it the projected COD). Developers set and change it, many projects slip, and some are never built. It is not a promise or a construction date.
Stage
Soda Lake BESS 2 SLF138 kV Soda Lake (#76026) · shared with 3 other requestsCrane II Solar Electric, LLCBattery storage (paired with solar)205.3Oct 2028Signed Aug 2026
Soda Lake Solar 2 SLF138 kV Soda Lake (#76026) · shared with 3 other requestsCrane II Solar Electric, LLCSolar201.7Oct 2028Signed Mar 2022
Tri-X BESS 1 SLF138 kV Soda Lake (#76026) · shared with 3 other requestsCrane I Solar Electric, LLCBattery storage (paired with solar)205.3Oct 2028Signed Aug 2026
Tri-X Solar 1 SLF138 kV Soda Lake (#76026) · shared with 3 other requestsCrane I Solar Electric, LLCSolar201.5Oct 2028Signed Aug 2026
Cattle Drive Solar76000 North McCamey 345kVCattle Drive Solar, LLCSolar307.0Dec 2028Signed Dec 2025
Fowler Ranch Storage76025 Castle Mountain 138kVCrane BESS, LLCBattery storage (stand-alone)26.1Sep 2027In study
BRP Ampato BESS10002 NS Crane Switch 138kVBRP Ampato BESS LLCBattery storage (stand-alone)121.6Dec 2027In study
Western Flats SolarTap 138 kV 76615 Crane -76635 King Mountain; POI is 7.85 miles from...Hecate Energy Point Mountain Solar Facility 1 LLCSolar410.2Nov 2028In study
Western Flats StorageTap 138 kV 76615 Crane -76635 King MountainHecate Energy Point Mountain Solar Facility 1 LLCBattery storage (paired with solar)410.7Nov 2028In study
Tierra Loma SolarTap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1 · shared with 1 other requestTierra Loma Solar, LLCSolar250.0Sep 2029In study
Tierra Loma StorageTap 345 kV #18668 ROCK DRAW - #76000 NORTH MCCAMEY ckt 1 · shared with 1 other requestTierra Loma Solar, LLCBattery storage (paired with solar)200.0Sep 2029In study
BRP Pictor BESS60400 Lynx 138kV · shared with 3 other requestsBRP Pictor BESS LLCBattery storage (stand-alone)201.1Dec 2029In study

No longer listed since August

These projects were in ERCOT's August interconnection report but are not in its September 2026 report. ERCOT's reports do not say why a project leaves the list.

  • Soda Lake BESS 1, battery storage, 204 MW (Mendoza Trail BESS, LLC)

Crowded connection points in Crane County

Substations and switching stations named by two or more of the county's requests, matched on ERCOT's PSS/E bus number rather than the exact wording, so "60404 SOLSTICE", "AEP Solstice Substation #60404" and a tap off the Solstice line count together. Every request statewide that names the bus is listed; a request on a tap line counts toward both ends. Sharing a bus is not the same as sharing a study group, and ERCOT decides the latter.

Bus 76026 (76026) 138 kV 4 requests · 814 MW4 signed
  • Soda Lake BESS 2 SLF 24INR0383 · Battery storage · 205 MW · Signed Aug 2026
  • Tri-X BESS 1 SLF 28INR0389 · Battery storage · 205 MW · Signed Aug 2026
  • Soda Lake Solar 2 SLF 23INR0080 · Solar · 202 MW · Signed Mar 2022
  • Tri-X Solar 1 SLF 20INR0143 · Solar · 202 MW · Signed Aug 2026
North Mccamey (76000) 345 kV 11 requests · 3,386 MW · 3 in Crane County, 8 in Upton, Reagan8 in study, 2 signed, 1 signed; security posted
  • Mesa View Storage 25INR0417 · Battery storage · 255 MW · Signed; security posted · Upton
  • Slager Lake Wind 29INR0042 · Wind · 310 MW · Signed Dec 2025 · Reagan
  • Cattle Drive Solar 29INR0013 · Solar · 307 MW · Signed Dec 2025
  • West Royal Natural Gas (TEF-Due Diligence) 28INR0086 · Gas turbine · 888 MW · In study · Upton
  • Vista Bluff Wind I "Alternate POI" 28INR0446 · Wind · 290 MW · In study · Upton
  • Vista Bluff Wind II "Alternate POI" 28INR0447 · Wind · 290 MW · In study · Upton
  • Badger Solar 28INR0212 · Solar · 280 MW · In study · Upton
  • Tierra Loma Solar 29INR0279 · Solar · 250 MW · In study
  • Tierra Loma Storage 29INR0280 · Battery storage · 200 MW · In study
  • Grandfalls Storage SLF 21INR0262 · Battery storage · 176 MW · In study · Upton
  • Badger BESS 28INR0213 · Battery storage · 139 MW · In study · Upton
Crane (76615) 138 kV 2 requests · 821 MW2 in study
  • Western Flats Storage 26INR0188 · Battery storage · 411 MW · In study
  • Western Flats Solar 26INR0110 · Solar · 410 MW · In study
King Mountain (76635) 138 kV 3 requests · 971 MW · 2 in Crane County, 1 in Upton3 in study
  • Western Flats Storage 26INR0188 · Battery storage · 411 MW · In study
  • Western Flats Solar 26INR0110 · Solar · 410 MW · In study
  • CATHODE BESS 24INR0394 · Battery storage · 150 MW · In study · Upton
Rock Draw (18668) 345 kV 3 requests · 1,338 MW · 2 in Crane County, 1 in Upton3 in study
  • West Royal Natural Gas (TEF-Due Diligence) 28INR0086 · Gas turbine · 888 MW · In study · Upton
  • Tierra Loma Solar 29INR0279 · Solar · 250 MW · In study
  • Tierra Loma Storage 29INR0280 · Battery storage · 200 MW · In study

What the stages and dates mean: how to read ERCOT's report. ERCOT's report lists self-limiting facilities (batteries that limit injection below nameplate) at 0 MW; repowers of existing plants show 0 with no capacity change. "Approved for energization" and "approved for synchronization" are ERCOT's own milestones (backfeed, then first power). "Shared with N other requests" counts active requests anywhere in ERCOT naming the same point of interconnection, matched on ERCOT's exact wording, so a bus written two ways counts as two points. Source: ERCOT Generator Interconnection Status (GIS) Report, September 2026, planning data entered by developers and transmission providers that ERCOT says may contain errors. Parcel & Grid is not affiliated with ERCOT.

Who to contact in Crane County

  • Crane County appraisal district and tax office: parcel records and agricultural valuation, which a lease can end (directory, Texas Comptroller · rollback taxes).
  • TCEQ Region 7, Midland: 10 Desta Dr, Ste 350E, Midland TX 79705-4530, 432-570-1359; spills, 24 hours: 800-832-8224. Handles the construction stormwater permit for sites of 1 acre or more (TCEQ).
  • Crane County judge and commissioners court: road use agreements, tax agreements, and floodplain development permits where the county takes part in the flood insurance program.
  • Flood maps: FEMA map search for Crane County.

Permits and reviews for Crane County

Texas has no state siting permit for solar or wind, and Texas counties generally have no zoning authority, so a project in Crane County is shaped by site control, the county road use agreement, tax agreements, and the grid connection (what still applies · the twelve approvals, stage by stage). Wetland, endangered species, historic, and FAA reviews depend on the site: statewide and federal contacts · decommissioning law.

How a project in Crane County connects to the grid

Crane County is on the ERCOT grid. The projects listed above are in ERCOT's West load zone. The serving utility handles the connection request. Interconnection by market and utility · what ERCOT is.

How long it takes. ERCOT staff put the connection process at 18 to 30 months for generation of 10 MW or more, before construction or supply delays (ERCOT, Oct. 2024). Across the U.S., the median project built in 2025 took 61 months from interconnection request to commercial operation (Berkeley Lab, Queued Up 2026), so a lease signed today usually means construction years out: timelines by market.

Solar for homes and businesses in Crane County

Texas rules for rooftop and on-site systems are the same in every county; your electric utility sets the application steps: Texas home and business solar rules · your utility's application links.

Get the land report for a spot in Crane County

Get a free land report for any point: flood zone, wetlands, nearest power line, soils, and parcel acreage.

Check this land

Other counties served by TCEQ Region 7

Andrews · Borden · Dawson · Ector · Gaines · Glasscock · Howard · Loving · Martin · Midland · Pecos · Reeves · Terrell · Upton · Ward · Winkler

Check before you file. Contacts come from official directories and can change. Confirm fees, forms, and deadlines with the agency. General information, not a substitute for the advice of an attorney. Found an error? Let us know.